This Solicitation opportunity from Washington was posted on October 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wells 1 & 5 Cleanout & Redevelopment, West Sound Utility District, Port Orchard, WA

Closed
BXWA-2026-002935State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is designed by Willis Engineers, who will serve as the owner's representative for the City of Belmont. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the experience of proposed subcontractors. Bidders must comply with specific socioeconomic requirements, including the submission of MWBE Good Faith Efforts documentation, and the winning contractor is required to self-perform at least 50 percent of the total original contract amount. Key contractual obligations include providing performance and payment bonds, maintaining insurance with an A.M. Best rating of A-VII or better, and adhering to strict technical standards such as AWS and ASME welding qualifications and OSHA fall protection. Payment will be processed in equal monthly amounts using the EJCDC C-620 application for payment.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project involves various construction and supply scopes, including paving, electrical work, aggregate supply, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax by the deadline, with conflicting dates listed as October 28, 2026, and December 3, 2026. All submitted quotes must remain valid for 120 days from the bid due date. Qualified subcontractors and suppliers must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to 3 percent. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 4 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The West Sound Utility District is seeking a qualified, licensed, and bonded Washington drilling or pump contractor for the cleanout, redevelopment, and pump lowering of Well 1B and Well 5 in Port Orchard, Washington. The scope of work involves comprehensive redevelopment processes, including brushing, bailing, surging, and fluid impulse generation. Additionally, the contractor must lower the pumps by 100 feet, which requires the procurement and installation of new pumps, motors, column pipes, check valves, and couplings, as well as the replacement of any worn or damaged materials. This solicitation, identified as BXWA-2026-002935, was posted on September 25, 2026, with a response deadline of October 15, 2026. Interested parties should coordinate with the point of contact, John Tapia, to ensure all technical and licensing requirements are met for this local government project.

General Info

Contract for cleaning, redeveloping, and lowering pumps at two wells in Port Orchard.

Place of Performance

Port Orchard, WA, 98366, USA

Set-Aside

NONE

Documents

49
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → West Sound Utility District
Contacts1 person available
OfficeN/A
Office AddressN/A

Interested Companies (1)

All City Fence Temp FenceSeattle, WA

Full Description

Show more
West Sound Utility District (District), herein referred to as the Owner, requires the cleanout, redevelopment, and pump lowering of two wells 100 feet (Well 1B and Well 5; Project) by a qualified Washington licensed and bonded drilling or pump contractor (Contractor). Redevelopment work will include brushing, bailing, surging, fluid impulse generation (Hydropuls, AirShock, AirBurst or a similar approved method), and redevelopment. Pump lowering 100 feet will include providing and installing additional column pipes, check valves, couplings and other materials to lower the pipes, and include replacing damaged or worn materials, procuring and installing new pumps, motors, and appurtenances.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS