Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on March 27, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

West Flag Improvements Project

Closed
2020-113State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

24 minutes ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

about 24 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

about 24 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract involves a comprehensive utility and roadway improvement project along Hutcheson Drive, David Drive, and Canyon Terrace Drive in Flagstaff, Arizona. The scope of work includes replacing approximately 4,300 linear feet of water main and 70 water services, installing around 2,000 linear feet of sewer main with 70 sewer services, and constructing 13 manholes. Additionally, the project encompasses the removal and replacement of 13,400 square yards of asphalt structural sections, along with select edge improvements and other related infrastructure enhancements. The project aims to upgrade and improve the existing utility and roadway systems to ensure better service and roadway conditions. The solicitation for this project was posted on March 27, 2020, with a response deadline of April 27, 2020. It is managed by the City of Flagstaff under the NAICS code 237310, which pertains to highway, street, and bridge construction. The primary point of contact for inquiries is Patrick Brown, reachable via email at [email hidden] or by phone at [phone hidden]. The project is part of the City of Flagstaff's efforts to enhance infrastructure within the region, with additional details available through the provided online portal.

General Info

Documents

14
PDF, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstchecklist
High
PDF, High priority: read this firstspecial-provisions
High
PDF, High priority: read this firstbidding-requirements
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstplans
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstengineers-design-report
High
PDF, Low priorityreport
Low
PDF, Low priorityother
Low
PDF, Low priorityreport
Low
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Flagstaff
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Flagstaff
Office AddressN/A

Full Description

Show more
The Project is a utility and roadway improvements project on Hutcheson Drive from Fine Avenue to David Drive, David Drive from William Road to Hutcheson Drive, and Canyon Terrace Drive from the south end to Switzer Canyon Drive. The improvements generally consist of replacing approximately 4,300 LF of water main, 70 water services, 2,000 LF of sewer main, 70 sewer services, 13 manholes, 13,400 SY of asphalt structural section, select edge improvements, and other associated work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS