Western Trunk Line Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California Los Angeles Department of Water and Power
NAICS
N/A
Place of Performance
W. Gage Street, W. Florence Street, W. Manchester Avenue, W. Century Blvd, Imperial Hwy and West, Los Angeles, CA, 90047Set-Aside
NONE
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts2 people available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Full Description
Show more
The State Water Resources Control Board (State Water Board) is funding the Project referred to internally as Western Trunk Line Project Phase 1. The Project includes the abandonment of approximately 1,660 feet of existing riveted steel main, the installation of approximately 8,450 feet of new 54-inch earthquake resistant ductile iron pipe and welded steel, and the replacement and installation of approximately 1,735 feet of varying smaller diameter mainlines to tie into the existing distribution system. The Project is identified as Phase 1 and is part of a larger, multiphase project, which is being carried out in three stages: Phase 1, Phase 2A and Phase 2B. All of the project phases are evaluated in the same Mitigated Negative Declaration (MND) titled Western Trunk Line Project.
PROJECT NUMBER: 1910067-064C
