Western Trunk Line Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Western Trunk Line Project Phase 1, identified by project number 1910067-064C, is an infrastructure improvement initiative located along Western Avenue south of 108th Street in the West Athens/Westmont Community Plan Area of unincorporated Los Angeles County. Funded by the State Water Resources Control Board and led by the Los Angeles Department of Water and Power, this phase is the first part of a larger three-stage development consisting of Phase 1, Phase 2A, and Phase 2B. The scope of work includes the abandonment of approximately 1,660 feet of existing riveted steel main, the installation of approximately 8,450 feet of new 54-inch earthquake resistant ductile iron pipe and welded steel, and the replacement and installation of approximately 1,735 feet of smaller diameter mainlines to integrate with the existing distribution system. The project is classified under NAICS code 237110 and was subject to a Mitigated Negative Declaration, which determined that the project would not have a significant environmental effect. Financing was approved by the State Water Resources Control Board on August 20, 2026, with a formal signing date of August 21, 2026. Administrative oversight is managed by James R. Howe of the Los Angeles Department of Water and Power and Priscilla Nguyen of the State Water Board.

General Info

LADWP project 1910067-064C involves water main installation and replacement in Los Angeles, California.

Agency

California Los Angeles Department of Water and Power

Place of Performance

W. Gage Street, W. Florence Street, W. Manchester Avenue, W. Century Blvd, Imperial Hwy and West, Los Angeles, CA, 90047

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts2 people available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Priscilla NguyenEnvironmental Scientist
James R. HoweEnvironmental Specialist

Full Description

Show more
The State Water Resources Control Board (State Water Board) is funding the Project referred to internally as Western Trunk Line Project Phase 1. The Project includes the abandonment of approximately 1,660 feet of existing riveted steel main, the installation of approximately 8,450 feet of new 54-inch earthquake resistant ductile iron pipe and welded steel, and the replacement and installation of approximately 1,735 feet of varying smaller diameter mainlines to tie into the existing distribution system. The Project is identified as Phase 1 and is part of a larger, multiphase project, which is being carried out in three stages: Phase 1, Phase 2A and Phase 2B. All of the project phases are evaluated in the same Mitigated Negative Declaration (MND) titled Western Trunk Line Project. PROJECT NUMBER: 1910067-064C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of MWBE Good Faith Efforts and Table A documentation. Bidders must provide a bid bond, and the successful contractor will be required to furnish performance and payment bonds, along with insurance from companies rated A-VII or better by A.M. Best. Performance is governed by EJCDC standard forms, specifically the C-700 General Conditions and C-800 Supplementary Conditions. Payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Work must adhere to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project, solicitation ITB-2026141, is an infrastructure initiative for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, a standby generator, site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder registered in the Commonwealth of Virginia. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract amount, compliance with Davis-Bacon wage determinations, and adherence to OSHA and ADA standards. Bidders must provide at least three references for similar projects and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS