Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Westminster Avenue Early Education Center (EEC) Outdoor Classroom and Campus Upgrade

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Bryan Ramos FernandezCEQA Project Manager

Full Description

Show more
The proposed project (Project) will construct an outdoor classroom by dividing the existing playground area into distinct activity areas with paving, new playground matting and equipment, and landscaping. The project will also provide new HVAC units, roofing, exterior painting of the Children’s Center and Modular Classroom Building, and necessary upgrades to the fire alarm system and utilities. The Board of Education approved the Project’s budget of $8,014,646 on May 7, 2024. Minor work will include improvements to ensure compliance with local, state, and federal requirements including those of the American with Disabilities Act (ADA), Division of State Architect (DSA), and Department of Toxic Substances Control (DTSC). The proposed Project will establish nurturing, nature-based outdoor spaces that support whole—child development and learning, as well as address early education facilities needs that are necessary to improve student health, safety, and educational quality. The Project will be implemented per all applicable local and State regulations, as well as all District Standards and Specifications, such as those provided in LA Unified’s Program Environmental Impact Report for the School Upgrade Program (Program EIR and Subsequent PEIR). The Project will not cause an increase in student capacity or enrollment and would not result in an increase in the intensity of use. The beneficiaries of the Project include students and staff at each of the respective schools and the community at large who may request access to the facilities and grounds of each Campus pursuant to the Civic Center Act (CA Ed. Code Sections 38130 - 38139).

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 and associated structures 261 and 263 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract encompasses a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, upgrading lighting controls, and correcting plumbing deficiencies. The project has a performance period from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Proposals are evaluated based on three equally important factors: Past Performance, Corporate Relevant Experience, and Price. Awardees must provide payment and performance bonds equal to 100 percent of the contract price. Due to the nature of the facility, contractors must adhere to strict security protocols, including background checks, non-disclosure agreements, and vehicle registration. All work must comply with ADA accessibility guidelines and prevailing wage rates as specified in the Georgia construction wage determinations.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, bonding requirements range from a payment bond for projects over 35 thousand dollars to a combination of bid, payment, and performance bonds for projects exceeding 150 thousand dollars. The contract is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 7300/30 and requires certification by a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB certifications. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Required scopes of work cover a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory pre-bid site visit and submit a detailed cost breakdown for labor, materials, and equipment, along with a 90-day bid guarantee and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring compliance with specific minimum wage determinations and paid sick leave mandates. All work must adhere to OSHA, EPA, ADA, and NFPA-101 life safety codes, with the contractor required to maintain specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return sixteen residential rooms, bathrooms, and common areas to safe residential use. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, as well as the temporary disconnection and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, evidence of relevant experience, and a detailed work plan addressing project phasing and occupied-building protection. Additionally, the selected contractor must maintain general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate, and must provide full payment and performance bonding within ten days of the project award.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details

More opportunities from California → Los Angeles Unified School District

Same awarding agency

NAICS: 423450
New
SLED
Automated External Defibrillators
Solicitation # 2381068792
The Los Angeles Unified School District is soliciting bids for a comprehensive Automated External Defibrillator (AED) program, including the provision of equipment, real-time monitoring, maintenance, compliance management, and post-event services. The resulting unit rate requirements contract will cover an initial 36-month period. Key technical specifications require a minimum four-year battery and electrode life. The District evaluates bidders primarily on the lowest unit cost on an FOB Destination basis, though bidders may be ruled non-responsible based on poor past performance. The District also reserves the right to inspect bidder facilities and may require a testing period for any newly proposed brands. Deliveries must be made to various District locations within 30 calendar days of a purchase order, with specific delivery windows between 8:00 a.m. and 3:30 p.m. All shipments must be properly packaged to prevent damage and include detailed packing slips. Payment is processed via Electronic Funds Transfer (EFT), and invoices must be submitted in PDF format. The contract emphasizes social responsibility, with a 25 percent participation goal for Small Business Enterprises and a 5 percent goal for Veteran and Disabled Veteran Business Enterprises. Bidders must provide proof of insurance, material safety data sheets, and disclosure of manufacturing plant locations to comply with the District's Sweat-Free Procurement Policy.
Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers

POSTED

about 24 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
SLED
Best Value - 2710066 - Los Angeles High School - Wellness Clinic
Solicitation # 2710066
The Los Angeles Unified School District is soliciting bids for the construction of a new 6,000 square foot Wellness Center at Los Angeles High School, located at 4650 West Olympic Blvd. The project scope includes the creation of a facility for medical, dental, and mental health services, the removal of seven existing relocatable buildings, site improvements such as parking and landscaping, and the restoration of a natural grass play field. The project is divided into four construction phases with a total duration of 730 calendar days, including mobilization and closeout periods. The prime contractor must hold a Class B General Building Contractor license and adhere to the District's Project Stabilization Agreement and prevailing wage requirements. The contract is awarded using a Best Value methodology, where the lowest cost per quality point determines the winner. The procurement process consists of two steps: an initial evaluation of Statements of Qualifications based on a 1,000-point scale—weighting management competency, relevant experience, and past performance most heavily—followed by a price bid submission for shortlisted firms. The District's contract bond estimate is 18,934,000.00, and contractor-caused compensable delays are penalized at 1,500.00 per calendar day. All submissions must be uploaded in PDF format via the Ariba Business Network, adhering to a 50-page limit and a strict Cone of Silence regarding communications with district officials.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS