Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Westside Road at Pine Point Safety Improvements (Sites #2 and Sites #3)

Closed
BC25950MJ0000International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves safety improvements at two sites on Westside Road near Pine Point, specifically addressing slope erosion, inadequate road width, and overall safety concerns. The scope of work includes mobilization, traffic management, slope stabilization using micropile walls, paving, and revegetation seeding to restore the affected areas. This project is managed by the Southern Interior Regional Office under the Government of Canada and is solicited through a federal procurement process. The solicitation was posted on January 22, 2026, with a response deadline of February 18, 2026. All project-specific inquiries should be directed via email to the designated project contact, Chris Laramee, whose contact information is provided for communication related to this RFx. The overall objective is to enhance road safety and stabilize the terrain at these critical sites, ensuring improved infrastructure and environmental restoration.

General Info

Safety improvements at Westside Road sites including slope stabilization, paving, traffic management, revegetation.

Agency

Government of Canada → Southern Interior Regional Office

Place of Performance

CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Southern Interior Regional Office
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Southern Interior Regional Office
Office AddressN/A

Full Description

Show more
This project will address slope erosion, insufficient road width and increase the safety of 2 sites on Westside Road near Pine Point. Work consists of, but is not limited to, mobilization, traffic management, slope stabilization with micropile walls, paving, and revegetation seeding.Please direct all project specific enquiries related to this RFx by email to the Project Contact identified below and on the “Opportunity Details” tab under Additional Information SCT3.Project Contact Name: Chris LarameeEmail Address: Sign up to see this detail

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS