Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

White City Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades

Closed
W9127N26RA012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Portland District, is seeking a contractor to design and construct two new buildings, B300 and B301, along with three connecting corridors and a new surface parking lot at the VA Southern Oregon Rehabilitation Center and Clinics (SORCC) in White City, Oregon. The scope includes site work and demolition involving the removal of two buildings and four connecting corridors totaling about 46,500 gross square feet, demolition of two parking lots, road re-alignment, utility upgrades, landscaping, and grading. The new B300 building, approximately 80,074 gross square feet, will house multiple administrative and support departments, while the B301 building, about 96,946 gross square feet with an additional renovated space, will accommodate primary and specialty care services such as radiology, dental, and pharmacy. This procurement is an unrestricted, competitively negotiated two-phase Design-Build contract with a firm-fixed-price target ceiling of $260 million and a performance period of 47 months. The relevant NAICS code is 236220, covering commercial and institutional building construction. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, and offerors must be registered in the System for Award Management (SAM). The contracting office’s sole points of contact are Nicole Adams and Jaren Bowman, with all communications preferred via email. The government reserves the right to cancel the solicitation at any time without reimbursement for proposal preparation costs.

General Info

Design-build contract for two buildings, corridors, parking, demolition, utilities, $260M budget, 47 months.

Agency

Department Of Defense → W071 Endist Portland

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

White City, OR, OR, 97503

Set-Aside

NONE

Documents

(4)

White+City+Industry+Day+Video+Recording+-+January+2026.mp4

MP4

Vendor+Instructions+for+PIEE+Solicitation+Module.pdf

PDF

White City VA Industry Day January 2026

PDFindustry-day

List+of+Attendees+-+WC+SORCC+Industry+Day+April+2025.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Type Changed

special-notice → Presolicitation

Amendment 2

Contract was updated

Type Changed

Presolicitation → Solicitation

Posted

special-notice

Amendment 4

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Organization / Agency
Department Of Defense → W071 Endist Portland
Office AddressPORTLAND, OR, 97204-3495, USA

Full Description

Show more
Amendment 0001 Posted. Please see the Solicitation Amendment and Updated Appendix A for details. The submittal date is not extended. The U.S. Army Corps of Engineers, Portland District, has a requirement for a contractor to design and build two (2) new buildings, B300 and B301, three (3) new connecting corridors, and a new surface parking lot of the VA SORCC in White City, OR. Details below: SITE WORK AND DEMOLITION. Includes sitework to accommodate pedestrian and vehicular access to the new B300 and B301, demolition of two (2) buildings and four (4) existing connecting corridors totaling approximately 46,500 building gross square feet (BGSF)� demolition of existing parking lots G and O, construction of a new surface parking lot with 188 spaces, re-alignment and/or reconstruction of roads, sidewalks, pathways, drainage and intersection; upgrades to the existing and/or construction of new utilities, landscape, and grading plans. � CONSTRUCTION OF NEW B300 SUPPORT BUILDING. Includes the new B300 with approximately 80,074 BGSF and two (2) new two-story connecting corridors totaling approximately 4,388 BGSF. The following departments will be moving into the new B300:� Office of Information Technology (Campus Main Computer Room), Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service. �CONSTRUCTION OF B301 PRIMARY AND SPECIALTY CARE BUILDING. Includes the new B301 with approximately 96,946 BGSF, one (1) new connecting corridor (approximately 1,400 BGSF), and renovation of a portion of the existing building B201A (approximately 1,000 BGSF). The new B301 will house SORCCs Primary Care, Radiology, Dental, and Pharmacy functions. ACQUISITION STRATEGY: This acquisition is an unrestricted competitively negotiated procurement using two-phase Design-Build (D-B) selection procedures and will result in the award of one (1) Firm-Fixed-Price (FFP), D-B contract. TARGET CEILING PRICE: The target ceiling for the total contract award, to include design and construction, is $260M. PERIOD OF PERFORMANCE: 47 Months SET ASIDES AND CODES: The North American Industrial Classification Code (NAICS) for this potential requirement would be 236220? Commercial and Institutional Building Construction. The related size standard is $45M. The PSC is Y1DA - Construction of Hospitals and Infirmaries. UTILIZATION OF THE SOLICITATION MODULE OF THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT (PIEE) MODULE: This procurement requires offerors to submit all proposal documents electronically through the PIEE Solicitation Module. Offerors shall either self-register for a PIEE account and add the appropriate roles, or for existing PIEE users, access their account and add additional roles. There are two vendor roles required for access ? Proposal Manager and Proposal View Only. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Further details are provided not only in the Vendor Access Instructions but also via PIEEs Web Based Training module (https://pieetraining.eb.mil/wbt) under the Award heading and Solicitation link (https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf System for Award Management (SAM): Offerors must be actively registered in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of proposals and prior to receiving an award. POINT OF CONTACT: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Nicole Adams at Nicole.A.Adams@usace.army.mil and the Jaren Bowman at Jaren.L.Bowman@usace.army.mil. E -mail is the preferred method for receiving responses. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.