Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

White Cotton Cottage Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Whitecotton Cottage Rehabilitation project, located in San Leandro, California, aims to fully restore the historic building into functional office space for Alameda County staff, adhering to the Secretary of the Interior’s Standards for Rehabilitation. The scope includes structural stabilization, interior and exterior modifications, roof repair, site improvements, and the installation of new building systems. Environmental remediation is a critical component, involving the removal of 290 cubic yards of contaminated soil surrounding the structure. Landscaping efforts will entail the removal of ten existing trees and the planting of fifteen new 24-inch box trees to enhance the site’s aesthetics and ecological value. The project is being managed by Alameda County, with primary oversight from Senior Project Manager Nivedita Gupta, who can be contacted via email or phone for further inquiries. The initiative is publicly forecasted with a posting date of July 10, 2026, and falls under the NAICS code 236220 for commercial and institutional building construction. While the project is registered under California’s CEQA framework and has received a Notice of Exemption, no contract-specific details such as funding estimates, performance timelines, inspection criteria, or procedural requirements are available in the provided documentation. All contract clauses, evaluation factors, special requirements, and administrative details remain unstated, indicating the current status is a pre-solicitation forecast with formal procurement documents yet to be issued.

General Info

Alameda County to rehabilitate Whitecotton Cottage into office space, remove contaminated soil, replace trees, preserve historical integrity.

Agency

California → Alameda County

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

San Leandro, CA, 94578

Set-Aside

NONE

Documents

(1)

Whitecotton Cottage Rehabilitation Project Environmental Declaration and Notice of Exemption

PDFenvironmental-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Alameda County
Office AddressN/A
Contacts
Nivedita GuptaSr. Project Manager

Full Description

Show more
The project proposes the complete rehabilitation of the Whitecotton Cottage building into office space for use by County staff in accordance with the Secretary of the Interior's Standards for Rehabilitation. The project will include structural stabilization, interior and exterior adjustments and retrofitting, roof repair, site improvements, and installation of building systems. The project would also remove 290 cubic yards of soil, including contaminated soils around the perimeter of the building. Ten trees would be removed and 15 new 24-inch box trees would be planted.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education and Training Resources is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, submissions must include a completed bid sheet, a detailed cost breakdown separating labor and materials, a proposed project schedule, and current Vermont state professional licensing. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Payment terms are net 30 days upon satisfactory completion and receipt of a proper invoice. The contract incorporates various FAR clauses, including compliance with the Davis Bacon Act and the Service Contract Act.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, involves a comprehensive construction scope over a 1828 calendar day duration. The project includes the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines, along with a new Ordnance Operations building, Truck Inspection facility, and Sentry building. Key technical requirements include the installation of overhead cranes, rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The scope also encompasses the demolition of 18 existing magazines and two buildings, as well as extensive sitework involving rock excavation, grading, and wetland mitigation. Infrastructure improvements include the development of access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is open to various small business categories, including SDB, WOSB, HUBZone, and VOSB certifications under NAICS code 236220. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari at J & J Contractors, Inc. to obtain bid documents and formal invitations.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details