Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Whitehead Slough Bridge Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-LAS-57688-R1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued Lake and Streambed Alteration Agreement EPIMS-LAS-57688-R1 to Lassen County - Department of Public Works authorizing the replacement of a structurally deficient 54-foot by 19-foot steel bridge at Whitehead Slough on Capezzoli Lane near Susanville, California. The project will install a new 83-foot by 36-foot bridge designed with abutments positioned above the Ordinary High Water Mark and no central supports in the channel to minimize environmental disruption while ensuring safe, two-way vehicular access. The alteration is conducted under Section 1602 of the Fish and Game Code and is exempt from full environmental review under California Environmental Quality Act categorical exemptions 15301, 15302, and 15304, which apply to the maintenance, replacement, and minor changes to existing structures without expanding their use. The project is not a federal procurement, and no Federal Acquisition Regulation clauses, funding account identifiers, or traditional contract types such as FFP or IDIQ apply; instead, it is a state environmental permit tracked through EPIMS. No contract value, pricing details, payment terms, invoicing methods, or formal contracting officer roles are specified, and while the Lassen County Department of Public Works is the responsible entity, no Unique Entity ID, size status, or socioeconomic certifications are provided. Oversight is the responsibility of the California Department of Fish and Wildlife, Region 1, with Davis Ferguson designated as the primary contact for permitting compliance. Performance will occur at the bridge site in Susanville, with inspection and acceptance tied to adherence to the environmental exemptions and structural replacement requirements. No delivery schedule, FOB terms, packaging requirements, or submission instructions beyond environmental notification are detailed in the authorization.

General Info

Lassen County to replace bridge at Whitehead Slough with environmentally compliant structure under state permit.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Capezzoli Lane, Susanville, CA

Set-Aside

NONE

Documents

(1)

Whitehead Slough Bridge Replacement Project Notice of Exemption EPIMS-LAS-57688-R1

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Davis FergusonSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-LAS-57688-R1, pursuant to Section 1602 of the Fish and Game Code to Lassen County - Department of Public Works. The Project is limited to the replacement of the existing, structurally deficient bridge at Whitehead Slough to maintain access across the slough. The existing bridge is 54-foot-long by 19-foot-wide steel span structure that provides access for two-way traffic across Whitehead Slough on Capezzoli Lane. The existing bridge would be replaced with a new 83-foot-long and 36-foot-wide bridge. The new bridge abutments would be located outside of the channel above the Ordinary High Water Mark (OHWM), and the bridge superstructure would span the channel with no central supports.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details