Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Whitley Avenue Pedestrian Crossing Enhancement

Closed
HSIPSL-5223(028)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 23 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety (DPS) has issued Invitation for Bids (IFB) solicitation 405-26R0027374 for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. The project requires a comprehensive remove and replace approach, involving the milling of all existing asphalt surfaces to a minimum depth of 2.5 inches, prepping the area, and installing new asphalt with a minimum finished depth of 2.5 inches compacted to approximately 98 percent. The scope also includes full restriping of the lot, including handicap and fire lane markings, and the removal and resetting of wheel stops. To maintain operational continuity, the contractor must perform work during off-hours and provide a work phasing plan for agency approval. Bids are due electronically by 5:00 P.M. CT on November 13, 2026, via the DPS Online Bid Room or designated email. Responses must be organized into four volumes covering required contract forms, information bid details, a subcontracting plan, and a mandatory pricing schedule. Award decisions will be based on the best value standard, with a significant emphasis on past performance. Key requirements include adherence to Texas Government Code Chapter 2258 prevailing wage rates, the provision of performance and payment bonds for contracts exceeding specific thresholds, and the completion of fingerprint-based criminal history background investigations for personnel. All work must be performed by qualified craft persons with at least three years of field experience and comply with all state and local codes.
Department of Public Safety

POSTED

1 day ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The City of Corcoran is soliciting bids for the Whitley Avenue Pedestrian Crossing Enhancement project, located at the intersection of Whitley Avenue and Gardner Avenue in Corcoran, California. The scope of work involves comprehensive pedestrian safety improvements, including the demolition and construction of sidewalks, curbs, gutters, and curb extensions, as well as asphalt paving and landscaping. Key installations include rectangular rapid flashing beacons with pedestrian-activated push buttons, flood lights, and various pavement markings such as stop bars, crosswalks, and yield markers. The project must adhere to 2025 Caltrans Standard Specifications and Standard Plans, as well as ADA and PROWAG requirements for detectable warning surfaces. The contract will be awarded to the lowest responsive and responsible bidder. Bids are due by October 6, 2026, and must include a bid security of ten percent of the bid amount. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract price and must maintain general liability and automobile insurance. The project is scheduled to begin with a notice to proceed on October 20, 2026, with construction starting October 26 and a completion deadline of December 9, 2026, totaling 30 working days. All work must be performed in accordance with California prevailing wage rates and equal employment opportunity policies.

General Info

City of Corcoran pedestrian safety project; bids due October 6, 2026; 30-day duration.

Place of Performance

Corcoran, CA, 93212, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF CORCORAN
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → CITY OF CORCORAN
Office AddressN/A
Contacts

Full Description

Show more
Bid #HSIPSL-5223(028): The project involves pedestrian crossing enhancements on Whitley Avenue. Work includes concrete demolition and construction of sidewalks, curb & gutter, and curb extensions. It also includes asphalt demolition and paving, landscaping, installation of grates, and signage, specifically rectangular rapid flashing beacons (RRFBs) with pedestrian-activated push buttons and flood lights. Other tasks include construction staking, traffic control, water pollution control, sawcutting, installation of detectable warning surfaces, median curbs, retaining curbs, decomposed granite, Class II aggregate base, hot mix asphalt Type 'A', and adjustment of utility covers to grade. The project also requires paint traffic striping, pavement markings, and signage. Hot and cold weather concreting practices are specified. The contractor is responsible for all necessary construction surveying and staking, and for maintaining traffic and pedestrian access throughout the project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS