Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wilder and La Granada Water System Modifications (CI 5676)

Closed
2025/2026-28State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Thousand Oaks is soliciting bids for minor piping and appurtenance installation at two locations—La Granada Reservoir and the public right-of-way on Wilder Street—to establish water zone interconnections for future use. The work must be completed in full compliance with Drawing Number 26-04A, Sheet 6, the contract specifications, and all associated documents, encompassing all labor, materials, tools, equipment, and incidentals required. Contractors are required to hold a valid Class A license, and all subcontractors must possess appropriate specialty licenses, with license documentation to be submitted within five days of request. A full-time, City-approved Superintendent, who must be a direct employee of the contractor and proficient in English, is mandatory to oversee daily operations and safety. The project demands strict adherence to environmental and safety standards including NACE, SSPC, OSHA, and ANSI/NSF 61, with all materials delivered in undamaged, manufacturer-sealed packaging and stored according to manufacturer guidelines. Performance and payment bonds equal to 100% of the bid amount are required, issued by a California-admitted surety and submitted via Surety2000 or as hardcopy. Contractors must certify compliance with the California Iran Contracting Act and provide a City-approved Erosion Control Plan, as the site is under one acre and does not qualify for the City’s standard SWPPP. Bidders must also complete CARB reporting if off-road diesel vehicles are to be used, with noncompliance leading to bid rejection and bond forfeiture. All submittals, including shop drawings, photographs, and videos, must be submitted electronically through the City’s procurement portal by the deadline of May 20, 2026, at 3:30 PM Pacific Time; paper bids are not accepted. The City retains sole authority to approve substitutions, inspect work at both origin and destination, and accept final deliverables, with no formal FAR clauses applied, relying instead on municipal provisions and engineering discretion. Payment milestones are tied to progress, capped at 95% until final documentation including lien waivers and recycling reports are submitted, and all materials must carry clear, unencumbered title with no conditional sales or chattel mortgages permitted.

General Info

Supply labor, materials, and equipment for minor piping installations at La Granada and Wilder Street.

Documents

3

CI 5676 Wilder and La Granada Water System Modifications Specifications

PDF, High priority: read this firstspecifications
High

Wilder and La Granada Water System Modifications CI 5676 RFP

PDF, High priority: read this firstrfp
High

Wilder and La Granada Water System Modifications CI 5676 RFP

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from May 27, 2026 to May 20, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts2 people available
OfficeThousand Oaks, CA, 91362, USA
Organization / AgencyCalifornia → Public Works
Office AddressThousand Oaks, CA, 91362, USA
Contacts
Paul WeinsteinAssociate Analyst
Grace NgAssistant Analyst - Purchasing

Interested Companies (35)

The RoviSysAurora, OH
Sam Hill & SonsVentura, CA
McCracken Excavation& UtilitiesGranite Bay, CA

See All 35 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the Plans (Drawing Number 26-04A, Sheet 6), Specifications, and Contract Documents. The general items of work include minor piping and appurtenance installation at two locations to install water zone interconnections for use at a future time. The project is located at La Granada Reservoir (2354 Mountain Crest Circle) and in the public right-of-way located on Wilder Street (1630 Wilder Street).

More opportunities from California → Public Works

Same awarding agency

NAICS: 237110
New
SLED
Collections Square Maintenance Hole Upgrades Phase II Project (CI 5786)
Solicitation # 2026/2027-05
The Collections Square Maintenance Hole Upgrades Phase II Project (CI 5786) is an Invitation for Bids issued by the City of Thousand Oaks Public Works department. The project involves maintenance hole upgrades at four locations on private property within easements in the Lynn Ranch area, specifically on Calle Salto and Camino Cristobal. The scope of work includes replacing existing rectangular precast concrete manhole lids with new hatches or round frames and covers cast in precast concrete lids, as well as the cleaning, preparation, and application of an internal lining product within the structures. The engineer's estimate for the project is 160,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The total duration for the work is 75 calendar days from the Notice to Proceed, which includes three days for rain or inclement weather. Bids were due electronically by November 18, 2026, and must include a 10 percent bid security. The successful contractor is required to provide payment and performance bonds equal to 100 percent of the contract price and must adhere to California prevailing wage rates. Key compliance requirements include the submission of a Site Safety Plan, adherence to ADA regulations, and strict waste management protocols. Performance will be monitored by the City Engineer, and final payment is contingent upon satisfactory project closeout and site cleanup.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS