Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Kentucky was posted on March 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wildrose, Martha and Maple Resurfacing

Closed
38242State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

2 days ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

2 days ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The contract involves the milling and resurfacing of existing asphalt pavement along three specific sections: Wildrose Drive between Dixie Highway and Dudley Road, Martha Court from Wildrose Drive to Maple Lane, and Maple Lane between Dudley Road and Wildrose Drive. Before the resurfacing, full-depth repairs will be performed on the pavement as needed to ensure proper foundation and longevity. The project timeline allows work to commence after April 1, 2026, with a mandatory completion date by June 15, 2026. This solicitation, titled "Wildrose, Martha and Maple Resurfacing" and numbered 38242, was posted on March 5, 2026, with a response deadline of March 19, 2026. The contracting agency is listed as Kentucky Outside Consultants, with the primary point of contact being Martin Hellmann, Project Manager. The work will be performed within Kentucky, and all inquiries or submissions are directed through the provided contact information.

General Info

Milling and resurfacing asphalt on Wildrose, Martha, Maple; repairs before April-June 2026 deadline.

Documents

3

38243 Wildrose, Martha, and Maple Resurfacing Contract Documents and Specifications

PDF, High priority: read this first77 pages · rfb
High

IFB 38242 Wildrose, Martha and Maple Resurfacing

PDF, High priority: read this first9 pages · ifb
High

Wildrose, Martha, and Maple Resurfacing Bid Set 38243

PDF, High priority: read this first8 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Outside Consultants
Contacts1 person available
OfficeEdgewood, KY, 41017, USA
Office AddressEdgewood, KY, 41017, USA
Contacts
Martin HellmannProject Manager

Interested Companies (7)

Central SealDanville, KY
Riegler BlacktopFlorence, KY
Builders ExchangeValley View, OH

See All 7 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Project includes the milling and resurfacing of the existing asphalt pavement on Wildrose Drive (Dixie Highway to Dudley Road), Martha Court (Wildrose Drive to Maple Lane) and Maple Lane (Dudley Road to Wildrose Drive) . Project will include the full depth repair of the existing asphalt pavement as needed prior to resurfacing. Work may begin after April 1, 2026 and must be completed by June 15, 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS