Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Williams Road Safe Street Corridor Project, CIP No. 9128

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Salinas is preparing to undertake the Williams Road Safe Street Corridor Project, CIP No. 9128, which involves a comprehensive streetscape upgrade along a 1.6-mile stretch of Williams Road from East Alisal Street/John Street to Freedom Parkway. The project will install three new roundabouts at key intersections—Williams Road and East Alisal Street, Williams Road and East Market Street, and Williams Road and Freedom Parkway—to improve traffic flow and safety. Additional enhancements include a new traffic signal, raised concrete medians, curb extensions, new landscaping, marked and high-visibility crosswalks, and improved roadway lighting to benefit pedestrians and drivers alike. Bicycle infrastructure will be significantly upgraded with a mix of marked bicycle lanes, cycle tracks, and buffered bicycle lanes to promote safe, multimodal transportation. The project aims to create a more walkable, bikeable, and safer corridor for all users, aligning with broader community goals around pedestrian safety and sustainable transportation. All work will be conducted in the city of Salinas, California, with the Acting City Engineer, David Jacobs, serving as the primary point of contact for inquiries. The project has been forecasted for future solicitation with a posted date of July 13, 2026, though detailed procurement information such as solicitation number, NAICS code, or set-aside type is not yet available. The project is publicly documented through the CEQA Net system for transparency and community awareness.

General Info

Salinas to upgrade Williams Road with roundabouts, bike lanes, crosswalks, and lighting for safer multimodal transit.

Agency

California → City of Salinas

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Williams Road, Salinas, CA

Set-Aside

NONE

Documents

(1)

NOE ER 2026-004

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Salinas
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Salinas
Office AddressN/A
Contacts
David JacobsActing City Engineer

Full Description

Show more
The project includes construction of three (3) new roundabouts located at Williams Road and East Alisal St, Williams Road and East Market Street, and Williams Road and Freedom Parkway, a traffic signal, raised concrete mediums, curb extension, new landscaping, marked and high visibility crosswalks and crossings, a combination of marked bicycle land and cycle track, buffered bicycle lanes and improving roadway lighting. Approximately 1.6 miles in length from Williams Road at East Alisal Street/John Street to Williams Road at Freedom Parkway.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The Massachusetts Department of Transportation (MassDOT) is soliciting design-build proposals for the replacement of Bridge C-13-038, I-391 over Chicopee Street (ST 116) in the City of Chicopee, with a preliminary estimated cost of $145,760,000. The project requires a four-span bridge with a concrete I-girder superstructure and concrete deck, restoring a six-lane roadway configuration matching adjacent sections of I-391, incorporating a modified CF-MTL5 barrier with snow fence, and ensuring minimum vertical clearances of 16'-6" for the roadway and 18'-0" for the parking area. Site improvements include consolidating parking to 60 spaces south of Chicopee Street, installing a new lighting system on Chicopee Street with foundations on the bridge only, and removing existing light poles, lights on both I-391 and Chicopee Street, and resetting a hydrant. The work is based on the Base Technical Concept, and the Design-Builder must deliver a final design stamped and sealed by their designer of record for approval by MassDOT and third parties. Proposals must be submitted as two separate packages—a Technical Proposal and a Price Proposal—by August 28, 2026, using the AASHTOWare Project Bids platform for pricing and a secure Dropbox link for technical submission. The Technical Proposal is limited to 40 pages, excluding the appendix, table of contents, letter of transmittal, and drawings in 11x17 format, and must be submitted as a searchable PDF with a maximum 11-point Times New Roman font on standard-sized pages. The procurement follows a Best Value Design-Build process, where award is determined by the lowest Overall Value Rating—the total price divided by the cumulative technical score. Technical merit accounts for 65% of the evaluation, weighted across Civil/Traffic (15%), Environmental (5%), Utilities (5%), Structures and Geotechnical (25%), and Construction Staging (15%); Project Management and Coordination comprise the remaining 35%, assessed on personnel experience, quality control, design and construction management, and schedule and cost controls. A 5% Proposal Guaranty is mandatory and constitutes a pass/fail criterion along with proper submission format and organization. The contract is awarded as a lump sum with payments tied to a payout schedule aligned with major
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of pavement and infrastructure work to be carried out across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt paving and patching, asphalt overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping and repainting of road markings, surface preparation for new striping, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and upgrades to road drainage systems, some of which may require permitting. All tasks are to be executed under a unit price structure designed for Port-wide application, allowing flexible and scalable execution based on site-specific needs. The contract is formally titled Asphalt Paving & Striping Portwide Unit Price 2026 and is issued by the Port of Seattle through its Port Construction Services division. It is posted as a forecast with a NAICS code of 237310 for Highway, Street, and Bridge Construction. Primary contact for inquiries is Heather Bowden, with Lesley Miles serving as the Project Manager. The solicitation is accessible via the Port’s online portal, though no solicitation number has been assigned yet. Performance locations span the Port’s operational zones, requiring contractors to coordinate across diverse and active aviation and maritime environments, with all work expected to adhere to regulatory, safety, and environmental standards applicable to airport and maritime infrastructure.
Port Construction Services

POSTED

about 6 hours ago

DEADLINE

N/A
View Details