Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Willow Creek Reservoir Water Quality Research and Evaluation Studies

Closed
W81EWF-26-SOI-0003Grant

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541715
New
Federal
U.S. Army Contracting Command – Watervliet Arsenal (ACC-WVA) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
Solicitation # W911PT26SC001
The U.S. Army Contracting Command – Watervliet Arsenal (ACC-WVA) has issued solicitation W911PT26SC001, a Commercial Solutions Opening (CSO) authorized under the National Defense Authorization Act for Fiscal Year 2026 and DFARS Subpart 212.70. This competitive solicitation is open until September 30, 2027, and is designed to acquire innovative commercial products, technologies, and services to modernize the Army's Organic Industrial Base. The scope focuses on integrating manufacturing resources, linking legacy analogue systems with digital systems, and expanding modeling and simulation to enhance the delivery of materiel solutions. The CSO targets both traditional and non-traditional business entities, including small businesses and foreign-owned firms, provided they maintain an active System for Award Management (SAM) profile and a Unique Entity ID. The acquisition process follows a multi-phased approach consisting of a written solution brief, an optional presentation or pitch, and a final Request for Commercial Solution Proposal (CSP). Evaluation is based on responsiveness, technical merit, uniqueness, and price reasonableness. Successful responses may result in fixed-price contracts awarded under FAR Part 12 Commercial Item Procedures. Current Areas of Interest (AoIs) include advanced cannon technology, electrical infrastructure improvements at Building 120, chromium facility conversion, automated manufacturing for minor components, automated cooling tower treatments, advanced CNC vertical turning lathes, and advanced tooling for radial forging. Performance is primarily located at Watervliet Arsenal and Benet Laboratories, with a general period of performance not to exceed 12 months unless otherwise specified.
W6QK Acc Wva

POSTED

about 16 hours ago

DEADLINE

in 11 months
NAICS: 541715
New
Grant
Coordinating Center for National Resource Network for the Study of Human Auditory and Vestibular Disorders (U24 Clinical Trial Not Allowed)
Solicitation # RFA-DC-28-002
Solicitation RFA-DC-28-002 is a Notice of Funding Opportunity from the National Institutes of Health, specifically the National Institute on Deafness and Other Communication Disorders, to establish a Coordinating Center for the NIDCD National Human Ear Resource Network. This collaborative network provides human inner and middle ear tissues to researchers for basic and clinical studies aimed at advancing the treatment of auditory and vestibular disorders. The Coordinating Center is responsible for maintaining network cohesiveness through the planning of workshops, symposia, and regular meetings, providing updates to laboratories, and managing communication with the public and scientific community regarding tissue donation. The maximum project period is five years, with a budget limit of 200,000 dollars in direct costs per year. Applicants, including for-profit organizations and small businesses, must maintain active registrations in SAM, eRA Commons, and Grants.gov. Proposals are evaluated based on the significance of the proposed center and the qualifications of the investigators, with additional reviews for human subject protections, inclusion policies, and the use of vertebrate animals. Key requirements include a structured Data Management and Sharing Plan and adherence to cybersecurity guidelines, including a 48-hour incident reporting window. The application process is entirely electronic and requires several standard PHS and SF424 forms, with a response deadline of March 5, 2027.
National Institutes Of Health

POSTED

1 day ago

DEADLINE

in 5 months
NAICS: 541715
New
Grant
National Resource Network for the Study of Human Auditory and Vestibular Disorders (U24 Clinical Trial Not Allowed)
Solicitation # RFA-DC-28-001
Solicitation RFA-DC-28-001 is a Notice of Funding Opportunity issued by the National Institutes of Health under the Department of Health and Human Services to support the NIDCD National Human Ear Resource Network. The objective is to maintain a collaborative network of laboratories that serve as a national technological resource, providing human inner and middle ear tissues to researchers for basic and clinical studies to advance the treatment of auditory and vestibular disorders. The scope of work includes processing human temporal bones from the National Hearing and Balance Organ Donor Program, uploading images and medical data to EarBase, sharing gene-expression data via the gEAR repository, and providing technical instruction to increase the number of skilled researchers in the field. The NIDCD intends to commit 3.6 million dollars in FY 2028 to fund up to six awards, with a maximum project period of five years. Individual awards are limited to 450,000 dollars in direct costs per year, with an additional 150,000 dollars available for specific subawards. Applications are due on March 05, 2027, and November 01, 2027, with staggered start dates ranging from July 2027 to July 2028. Evaluation is based on the experience of the investigators, the adequacy of the institutional environment, and the protection of human subjects. Applicants must maintain active SAM registration and a Unique Entity Identifier, and they must provide a Data Management and Sharing Plan and a Material Transfer Agreement. Compliance with the Cybersecurity Act of 2015 is required, including the development of an incident response plan and notification of cybersecurity incidents within 48 hours of discovery.
National Institutes Of Health

POSTED

1 day ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, through the Engineer Research and Development Center, is seeking to improve water quality in Willow Creek Reservoir near Heppner, Oregon, through a five-year research initiative with an estimated total funding of $500,000, allocated at $100,000 per year. The project, solicited under W81EWF-26-SOI-0003, is structured as a cooperative agreement and targets the severe eutrophic conditions affecting the reservoir, including toxic cyanobacteria blooms, low dissolved oxygen, and elevated nutrient levels that trigger public health advisories, harm aquatic life, and deter recreation. The research is organized around four pillars: empirical monitoring through monthly water sampling and in-situ physicochemical measurements to assess nutrient dynamics and the impact of the existing aeration system as an experimental variable; development of a whole-lake hydrodynamic model to simulate water quality scenarios and inform future dam operations; evaluation of current and alternative mitigation strategies for cost-effectiveness and ecological sustainability; and transparent dissemination of findings via monthly reports and an annual integrated summary accessible to the public and stakeholders to support community-led restoration. Performance is centered entirely at Willow Creek Reservoir, where fieldwork, data collection, and system assessments must occur, with the U.S. Army Corps of Engineers providing necessary site access. Proposals must demonstrate strong scientific merit and alignment with Department of Defense research priorities, evaluated through a trade-off process that prioritizes technical quality over cost. Applicants must be non-federal partners of the Pacific Northwest Cooperative Ecosystem Studies Unit and hold an active Unique Entity Identifier and System for Award Management registration. Key compliance obligations include adherence to 2 CFR 200, DoD R&D General Terms and Conditions, and restrictions prohibiting profit or fees; human subjects and animal use require prior federal approvals; data must be managed and preserved according to DoD Instruction 3200.12, with metadata and file integrity maintained; and lobbying disclosures, conflict of interest declarations, and disclosure of current and pending support for key personnel are mandatory. Submissions follow a two-phase process, beginning with a two-page Statement of Interest due June 12, 2026, followed by a full proposal due July 9, 2026, submitted via email and Grants.gov, and must include a detailed budget, data management plan, biographical sketches, and all required federal forms. The program is designed not only to generate scientific insight but to directly inform

General Info

Research project to improve Willow Creek Reservoir water quality via monitoring, modeling, and mitigation strategies.

Agency

Department Of Defense → Engineer Research And Development Center

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

W81EWF-26-SOI-0003 Willow Creek Reservoir Water Quality Research FOA

PDF, High priority: read this firstfoa
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Engineer Research And Development Center
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → Engineer Research And Development Center
Office AddressUSA
Contacts

Full Description

Show more

A.    Background

 

The overall goal of this project is to improve water quality conditions in Willow Creek Reservoir for the benefit of the community of Heppner, Oregon, and surrounding area. The reservoir is characterized by several water quality concerns, including dense cyanobacteria (or blue-green algae) blooms, low dissolved oxygen concentrations, and high nutrient concentrations. Cyanobacteria blooms are known to produce toxins, thereby threatening the aquatic ecosystem and potentially exposing humans and animals to risk of death or chronic illness such as neurodegeneration and liver damage. Each summer, Willow Creek Reservoir post’s health advisories warning users of the potential hazards associated with recreational activities on the lake. Furthermore, fish kills, foul odors and other nuisances are common in Willow Creek Reservoir affecting the community’s ambiance, limiting tourism and recreation on the lake.

 

This analysis draws upon prior research, readily available data, and new research and data to develop and implement an evaluation program for the restoration of Willow Creek Reservoir and its upper basin. Research results will provide public benefit through enhanced water quality in Willow Creek Reservoir producing public recreation opportunities and natural resource benefits.


B.    Program Description/Objective

 

The primary objective is to advance the scientific understanding of reservoir ecology through the following research pillars:


1.   Empirical Data Acquisition and Limnological Analysis: To maintain the integrity of high-resolution, longitudinal datasets, the research involves systematic environmental monitoring and experimental observation. This includes the monthly collection of water samples and the recording of in-situ physicochemical measurements to analyze long-term nutrient cycling patterns and ecosystem shifts. Rather than routine maintenance, site visits are designed to manage the reservoir aeration unit as a controlled experimental variable. This allows researchers to study the mechanical suppression of thermal stratification and quantify its subsequent impact on internal loading and overall water quality.

2.   Hydrodynamic Modeling and Predictive Analysis: The project will develop a comprehensive whole-lake hydrodynamic model. This model is a specialized research tool designed for the University to synthesize complex environmental data, simulate various "what-if" scenarios, and forecast the reservoir’s future water quality trajectory. While the insights derived from this model will inform the Portland District’s future best management practices and dam operations, the model itself serves as a transferable scientific tool. Findings derived from this model will be presented in formats accessible to stakeholders and the scientific community to aid in the regional understanding of water quality trajectories.

3.   Mitigation Strategy Evaluation: Researchers will evaluate the effectiveness of current systems and model alternative options including but not limited to the installed aeration system and water quality outlet operations. This investigative work is performed to identify the most cost-effective and ecologically sound strategies for protecting the public interest and restoring the reservoir’s health.

4.   Knowledge Dissemination: The partnership will facilitate the dissemination of research results through both public and technical forums to ensure that data serves the community as a transparent resource. While the University will provide monthly trip reports and a comprehensive annual report that integrates current findings with historical data to produce a clear, accessible record of reservoir health that will be made available to local stakeholders and the public. These efforts are designed to move beyond internal reporting, instead providing the transparency necessary to safeguard public health, drinking water resources, and recreational safety. Ultimately, this collaborative flow of information ensures that the research directly informs community-led restoration efforts and remains a matter of public record.

 

D.    Public Benefit


Willow Creek Reservoir (WCR) is considered a eutrophic water body and is characterized by severe cyanobacteria blooms (CyanoHABs) during the summer months. These blooms frequently trigger Oregon Health Authority (OHA) public health advisories, which negatively impact annual tourism and recreation. Furthermore, CyanoHABs contribute to fish kills and contribute to the overall deterioration of water quality and the aesthetic value. In response to these conditions, Willow Creek area community leaders have requested that U.S. Army Corps of Engineers (USACE) implement lake restoration efforts to improve water quality. The research and data collected through this project will support the development of a comprehensive restoration plan aimed at improving environmental conditions for public benefit. Additionally, this project will provide essential monitoring and reporting of water temperature and pH levels required to meet public health standards.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS