Wills Branch Creek Dredging - Rebid
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the comprehensive construction work for the Wills Branch Creek Dredging project, which includes dredging, excavating, transporting, and disposing of materials from Wills Creek as detailed in the project plans. Additionally, the scope encompasses installing and maintaining temporary turbidity controls during construction, clearing the banks of debris and vegetation, and replacing rubble rip rap slope protection as specified. The contractor is required to commence work within ten days of receiving written notice from the owner and must complete the entire base bid scope within 365 days, including Sundays and holidays. If the contractor anticipates performing work outside regular hours to meet deadlines, they must submit a detailed schedule as part of their proposal. The project is classified under NAICS code 238910, with a contract value estimated between one and five million dollars. It is managed by the Jacksonville office of Florida, with the primary point of contact being Benjamin Kemp, reachable via email or phone. The solicitation was posted on July 15, 2025, with a response deadline of July 17, 2025. The project aims to ensure efficient dredging operations while adhering to environmental and safety standards, with specific provisions for off-hours work if necessary to meet the project timeline.
General Info
Agency
Place of Performance
FL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
• Dredging / excavating, transportation, and disposal of material from Wills Creek as indicated in the contract plans. • Installation and maintenance of temporary turbidity controls associated with the project construction. • Clearing the banks of all debris and vegetation, including the replacement of rubble rip rap slope protection as called out in the contract plans.
The CONTRACTOR shall begin work within ten (10) calendar days, including Sundays and holidays, after the date of written notice from the owner to begin work, and shall complete the Base Bid work within 365 calendar days including Sundays and holidays, after the expiration of such ten (10) day notice. If the Bidder determines that off-hours work is anticipated to complete the project within such allotted times, a schedule therefore shall be attached to this proposal as required by Section 20.3.4 of the General Conditions.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS