Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on October 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Winder CDBG Infrastructure Improvements - Project No. 220215

Closed
PE-60750-NONST-2025-000000006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 17 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in about 17 hours

AI Contract Overview

Show more

The project involves comprehensive infrastructure improvements along E Stephens Street in Winder, Georgia, focusing on storm drainage, water, sewer, and transportation systems. Key drainage enhancements include installing new inlets and larger pipes to direct stormwater to a proposed detention pond at the intersection of E Stephens Street and Georgia Avenue, which will connect to an existing drainage system. Water infrastructure will be upgraded by replacing all asbestos-cement and galvanized water mains with an 8-inch ductile iron pipe from Park Avenue to Georgia Avenue. Similarly, the sewer system will be modernized by replacing the existing 8-inch terracotta sewer main with a new ductile iron pipe along the same corridor. Transportation improvements consist of constructing a new 5-foot-wide concrete sidewalk on the north side of E Stephens Street and resurfacing the roadway to improve safety and accessibility. The project is identified as Winder CDBG Infrastructure Improvements - Project No. 220215, with a solicitation posted on October 23, 2024, and a response deadline of November 21, 2024. The contract value is estimated to range between 2 million and 5 million dollars. The City of Winder, Georgia, is managing the project, with Patrick A Klein Jr. serving as the primary contact. The project aims to enhance the area's drainage capacity, water and sewer reliability, and transportation infrastructure to support community development and resilience.

General Info

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 60750 WINDER, PE-60750-NONST-2025-000000006 to PE-60750-NONST-2025-000000006.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Winder
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Winder
Office AddressN/A
Contacts

Full Description

Show more
The proposed project will improve storm drainage, water, sanitary sewer, and transportation infrastructure primarily along E Stephens Street, between Park Avenue and Georgia Avenue. Drainage improvements will include new inlets along E Stephens Street, new, larger drainage pipes to convey storm water runoff currently collected on the properties and roadway of E. Stephens Street to a proposed detention pond at the southeast corner of E Stephens Street and Georgia Avenue, which will outfall to an existing drainage system on the southwest corner of E Stephens Street and Georgia Avenue. For water facility improvements, all of the existing asbestos-cement and galvanized water mains along E. Stephens Street are to be replaced with an 8-inch ductile iron pipe water line from Park Avenue to Georgia Avenue. For sewer facility improvements, the 8-inch terracotta sewer main from Park Avenue to Georgia Avenue along E. Stephens Street is to be replaced with a new 8-inch ductile iron pipe sewer main. Transportation improvements will include a new 5-foot wide concrete sidewalk along the north side of E Stephens Street, along with resurfacing of the roadway.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS