Wisk Temporary Final Approach and Takeoff (FATO) Area

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Hollister is overseeing the Wisk Temporary Final Approach and Takeoff (FATO) Area project at the Hollister Municipal Airport in California. This initiative involves relocating Wisk Aero's surrogate helicopter operations to a new site south of Runway 31 End to facilitate critical flight testing. The project scope includes the construction of a 10,000 square foot temporary FATO pad and a 21,400 square foot temporary towing surface. Construction is scheduled to begin on August 1, 2026, with an estimated three-month duration ending in October 2026. The primary objective of this project is to collect vital aircraft flight test data to inform the Federal Aviation Administration's Future Vertical Lift Infrastructure Advisory Circular and the eVTOL and Advanced Air Mobility Integration Pilot Program. By integrating aircraft with ground systems and demonstrating vertiport requirements, the project aims to accelerate the development of revised standards and policies for the wider advanced air mobility community. The project has been granted a Notice of Exemption under the California Environmental Quality Act, citing minimal environmental impact.

General Info

Hollister to host Wisk Aero’s temporary eVTOL ops near Runway 13 in 2026 for FAA data collection.

Agency

California → City of Hollister

Place of Performance

Airport Drive, Hollister, CA, 95023

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Hollister
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Hollister
Office AddressN/A
Contacts
Jeff CrechriouAirport Director
Niraj NathDirector of Facilities

Full Description

Show more
The proposed project will be a relocation of Wisk's surrogate helicopter operations currently occurring on a small area near the end of Runway 13. The purpose of the project is to facilitate testing aimed at yielding vital data for the Federal Aviation Administration's (FM's) Future Vertical Lift Infrastructure Advisory Circular (AC) and eVTOL and Advanced Air Mobility (MM) Integration Pilot Program (elPP). With the AC slated for a 2027 publication, the FM has scheduled this testing to begin in 2026. The project will aim to integrate Wisk Aero's aircraft with necessary ground systems, demonstrate vertiport requirements, and provide data to inform broader MM policies and infrastructure providers. This effort is anticipated to accelerate the development of revised vertiport requirements and standards, benefiting the FM and lhe wider MM community.

Similar Contracts

Same NAICS industry code

NAICS: 488119
New
SLED
Lawrence Municipal Airport Commercial Aeronautical Hangar Leasing
Solicitation # RFP-2600056
The City of Lawrence is seeking a qualified tenant for a commercial aeronautical hangar and office facility at the Lawrence Regional Airport under solicitation RFP-2600056. The available space consists of an approximately 2,900-square-foot steel-framed hangar and a 540-square-foot office area. The facility includes essential utilities, a full bathroom, a kitchenette, and a 40ft by 10ft electric hangar door for airside access. The City aims to attract a tenant that can expand aeronautical services currently limited or unavailable at the airport, with a preference for technical and aviation operational businesses such as aircraft maintenance, repair, and overhaul. The contract term is five years with five optional one-year renewal options. The minimum acceptable annual rental rate for the first year is 16,317.20 dollars, though proposers may offer higher rates. Evaluation is based on a points system focusing on aeronautical use and operation, the proposed rental rate, operational compatibility, and compliance with airport rules and safety requirements. The successful tenant will be responsible for the maintenance and upkeep of the leased premises, including the office area and electric hangar door. Proposals must be submitted via the OpenGov portal by November 24, 2026, with the cost proposal submitted as a separate document from the technical proposal, statement of qualifications, and references. Bidders must certify they are not federally debarred and have no substantial conflicts of interest. Required insurance includes commercial general liability with a 1,000,000 dollar general aggregate limit, automobile liability, and workers compensation. All operations must comply with FAA requirements, the Americans with Disabilities Act, and Build America, Buy America regulations.
Municipal Services Operations

POSTED

2 days ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS