Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 13, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WOL-CEN-DAL Headworks Intake Lifting Equipment

Closed
W912P5-17-B-RFI1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 18 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Nashville District U.S. Army Corps of Engineers is conducting market research via a Request for Information to determine a competitive basis for a future firm fixed-price construction contract. The project involves the replacement of antiquated head gate machinery, wiring, controls, and machinery huts at three hydroelectric facilities: Wolf Creek Powerhouse, Center Hill Power Plant, and Dale Hollow Powerhouse. The primary goal is to improve system reliability and extend the life of the lifting equipment to ensure the continued availability of hydropower generating units. The project is structured in three phases: Planning, Engineering and Design, and Acquisition. The current planning phase focuses on site analysis and an alternatives analysis to decide between rehabilitation or full replacement. Subsequent phases will involve developing detailed plans and specifications followed by the procurement and installation of equipment. This effort is part of the Hydro 212 program and is anticipated to fall under NAICS code 237990 for Other Heavy and Civil Engineering Construction.

General Info

USACE seeks construction bids to replace head gate machinery at three hydroelectric facilities.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Wolf Creek Powerhouse (Wolf Creek) is located on the Cumberland River at river mile 460.9 approximately 10 miles south of James, TN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
Contacts1 person available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA
Contacts

Full Description

Show more
REQUEST FOR INFORMATION The Government is issuing this Request for Information to determine a competitive basis. This is not a solicitation. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information Requirement The Nashville District U.S. Army Corps of Engineers (USACE) anticipates a requirement for a firm fixed-price construction contract to accomplish the following work as follows: Wolf Creek Powerhouse (Wolf Creek) is located on the Cumberland River at river mile 460.9 approximately 10 miles south of Jamestown, Kentucky. The project contains six 45,000 kilowatt (kW) units with a total generating capacity of 270,000 kW. The rated "overload" generation is 310,000 kW. The six units became operational in 1951 and 1952. Center Hill Power Plant is located on the Caney Fork River, approximately 12 miles (20 river miles) from its confluence with the Cumberland River. The powerhouse has 3 identical vertical Francis type generating units, rated at 62,500 hp (45 MW) under 160 ft net head. Center Hill has the 2nd largest capacity and generates the 4th highest average annual energy of the Nashville District hydroelectric plants. Dale Hollow Powerhouse (Dale Hollow) is located on the Obey River 7.3 miles above its confluence with the Cumberland River 26 miles north of Cookeville, Tennessee. The powerhouse and dam are located in Clay County, Tennessee. The project contains three 18,000 kilowatt (kW) units with a total generating capacity of 54,000 kW. The rated "overload" generation is 62,100 kW. The three generating units became operable in 1948, 1949, and 1953. 1. Replace all head gate machinery, wiring, controls and machinery huts. The work item will include Planning, Engineering and Design of the replacement, preparation of the contracting package, and acquisition of the repair, and includes Engineering During Construction and Supervision and Administration. Development of the Phase I Assessment is underway. This is a joint effort with the District and The Hydroelectric Design Center. Planning (Active Phase): The scope of the planning effort for these projects includes an analysis of the current conditions at the site. Using this information, a detailed alternatives analysis will be performed to determine whether to rehabilitate or replace the equipment controls and wiring at the three projects. A final report will be provided with recommendations and cost estimates for both engineering and design and replacement of the equipment. Work will be completed jointly by the Nashville District (LRN) and the Hydroelectric Design Center (HDC). After a site visit and historical data gathering with HDC, LRN will lead the planning effort. LRN will provide a draft analysis report, with options for recommendation, to LRN for review and comment. A recommended alternative will be selected jointly by HDC and LRN. LRN will respond to HDC comments, who will perform the ATR on the report, and provide a final report for approval. The project manager will provide the Section 212 Program Manager with the alternative recommendation to take to the Hydropower Review Board (HPR) and Long-Term Memorandum of Agreement (LT-MOA) customers for approval prior to initiating the engineering and design phase. This phase is funded under the LT-MOA, Sub-Agreement (SA) #5. Engineering and Design (Future Phase): Engineering and Design funding for the WOL-CEN-DAL Headworks Intake Lifting Equipment is including in Sub-Agreement #5. In order to proceed with this phase, funds will need to be collected under SA #5 and approval to move forward received from the Project Review Committee (PRC). Plans and specifications will be developed for replacement of all machinery. All of the headgate equipment is extremely antiquated and beyond its service life. Additionally, many of the design standards have changed dramatically since these machines were designed and constructed. Numerous maintenance issues exist. As part of the Hydro 212 program, this machinery and equipment is to be replaced. It is expected that this work will be completed by LRN, HDC will provide reviews. Acquisition (Future Phase): Acquisition funding for the WOL-CEN-DAL Headworks Intake Lifting Equipment is including in Sub-Agreement #5. In order to proceed with this phase, funds will need to be collected under SA #5 and approval to move forward received from the PRC. Equipment identified in the Planning Phase and detailed in the Engineering and Design Phase will be acquired and installed. Informal acquisition plan selects large supply with incidental construction or installation as the implementation method for the project. The scope of this phase will not be developed in complete detail until the Engineering and Design Phase is complete. 1.3 Project Requirements Statement The intention for this project is to evaluate and develop designs for improvements to the lifting equipment for headworks at Wolf Creek, Center Hill, and Dale Hollow that will improve reliability of the system and provide a life extension for this component. With funding provided through the L-T MOA of the Section 212 Program, the hydropower preference customers are ultimately concerned with the availability of the hydropower generating units. This must be considered when determining what work will be done on the equipment and when the work will be done. 1.4 Scope Management Plan The initial phase of this project, which includes a detailed site inspection of the Power Plants by both LRN and the HDC, is necessary to better understand the existing system and its issues. If significant changes to the scope of work, schedule or budget are necessitated by project conditions, the PM shall report this change to the Hydropower Program Review board (HPR) with a recommendation for action. If the recommended action is approved by the HPR, the Program Manager (PgM) will prepare information for the customers to facilitate consideration of the recommendation, and allow the customers to vote on the proposition. Proposed changes to the scope, schedule or budget of the project shall be brought to the attention of the HPR at the earliest available HPR meeting, and to the PgM prior to the HPR meeting. Changes to scope of work or budget shall not be implemented without proper authorization. The PM and PDT shall be responsible for scope verification at the completion of the planning, engineering and design, and acquisition stages. *Please note that this description is subject to change. The anticipated NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $36.5 million. Survey The Government is issuing this to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or elimination from the requirement. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information. Your response to this survey is requested by 11:00 AM Central Time, Jan 04, 2017. Please send by email to contact@example.gov or fax to +1 (555) 000-0000. 1. Name of your firm: 2. CAGE: 3. Point of Contact, Phone number and email address: 4. Please list a Federal contract successfully completed, similar to the above referenced type of work: a. Year Completed: b. Dollar Amount: c. General Description of project: 5. Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6. If solicited, would you be interested in this work? 7. Please provide any additional information you feel is necessary:

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

NAICS: 335313
New
Federal
Supply and Deliver DC and AC Preferred Systems for USACE-LRN
Solicitation # W912P527QA001
The Nashville District of the U.S. Army Corps of Engineers is soliciting a Commercial Firm Fixed-Price contract for the fabrication, assembly, and delivery of DC and preferred AC backup power, electrical distribution, and safety support systems for the J. Percy Priest Dam and Powerhouse. All items must be delivered to the destination in Nashville, Tennessee, on or before June 10, 2027, with a two-week delivery notice required. The procurement falls under NAICS code 335313 for Switchgear and Switchboard Apparatus Manufacturing. Award will be granted to the responsive and responsible offeror providing the lowest price that achieves Successful Technical Conformance, with a 10 percent price evaluation preference applied to HUBZone small businesses and other successful small business concerns. Offerors must be registered in the System for Award Management and submit quotes via the PIEE Solicitation Module by November 5, 2026. Compliance with CMMC Level 1 is required prior to award, and status must be posted in the Supplier Performance Risk System. Due to the presence of Controlled Unclassified Information, including supply layouts and site photos, interested parties must submit specific security access forms for U.S. citizens or foreign nationals to gain access to restricted documents. Technical requirements include adherence to MIL-STD-130 and MIL-STD-129 for item marking and packaging, and factory tests must be witnessed by the Contracting Officer's Representative. Invoicing will be processed through Wide Area WorkFlow in accordance with the Prompt Payment Act.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS