This Solicitation opportunity from Department Of Defense was posted on July 19, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wolf Creek Pow er Plant Generator Step-up Unit (GSU) Transformer Replacement, Jamestown

Closed
W912P522R0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335311
New
SLED
THREE PHASE 23KV PADMOUNT TRANSFORMERS
Solicitation # BD-27-2082-PMLP-PMLP-134598
The Peabody Municipal Light Plant (PMLP) is soliciting bids for three-phase 23kV padmount transformers, specifically 60HZ, mineral oil immersed, class OA rated self-cooled, compartmental-type distribution transformers rated 3000KVA and smaller. The requirements include units with a primary voltage of 22,860 GRD Y / 13,200 volts and 125KV BIL insulation. Specific line items include 750 KVA, 1000 KVA, and 2000 KVA transformers with 480 Y / 277 secondary voltages and loop switches. All equipment must comply with the latest IEEE standard C57.12.34. The award process heavily weights transformer efficiency, requiring bidders to provide guaranteed maximum no-load and full-load losses, percent impedance, and detailed construction drawings. Bidders must provide firm pricing valid for 60 days, and those without upward escalator clauses are preferred. Deliveries must be made to the Peabody, Massachusetts jobsite between 08:00am and 03:00pm, with 72 hours' advance notice and packaging that allows for fork truck offloading from the rear. Payment is set at 100% of the quoted price within 30 days of delivery and inspection. Compliance requirements include adherence to the Occupational Safety and Health Act of 1970, PMLP safety rules, and Massachusetts tax laws under MGL c. 62C, §49A. Submissions must include a Certificate of Non-Collusion, tax compliance certification, and PCB certification prior to shipment.
PMLP - Peabody Municipal Light Plant

POSTED

about 12 hours ago

DEADLINE

in 15 days
NAICS: 335311
New
International
Design, Supply and Installation of the STATCOM
Solicitation # 25065
The British Columbia Hydro and Power Authority is conducting a Request for Information under solicitation number 25065 for the design, supply, and installation of a Static Synchronous Compensator (STATCOM) solution. This initiative is intended to support a major load project for a large industrial customer located within the North Thompson and Nicola regions of British Columbia. The project scope involves the design, factory simulation testing, supply, and installation of four STATCOMs at both new and existing substations. Technical requirements specify that equipment must be 24 MVAR or above with a base voltage of 138kV, and the STATCOM controller must be fully compatible with an existing 20-year-old ABB controller for a coordinated operation period of six to eight months. The procurement requires adherence to North American Standards, specifically IEEE C57.12.00 and CSA C88, with seismic qualification according to IEEE 693. Key deliverables include testing and commissioning, on-site training with manuals, and the provision of spare parts and special tools. This current process is for information gathering only and does not constitute a pre-qualification or shortlisting event. BC Hydro intends to issue a formal Request for Proposal in the second quarter of 2027, with a target contract award in the fourth quarter of 2027. Responses must be submitted electronically via BC Bid or to the designated contact, Man Kit Suen, by the deadline of November 17, 2026.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 28 days
NAICS: 335311
New
DIBBS
CABLE ASSEMBLY-SWITCH,
Solicitation # SPE4A6-27-T-5391
Solicitation SPE4A6-27-T-5391 is a request for quotations from the DLA Weapons Support ASC Commodities Division for the procurement of four electrical switch cable assemblies, identified by NSN 6150-01-733-1778. The items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania, with a required delivery date of August 18, 2027, and a need ship date of March 21, 2027. The contract specifies a delivery period of 144 days and requires FOB Origin terms. Compliance requirements are stringent, including mandatory adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, with a specific requirement for a cap or plug on one end of the assembly. Quality assurance must meet ISO 9001:2015 standards, and origin inspection is required. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and DLA authorization to access export-controlled data subject to ITAR or EAR regulations. The procurement incorporates various FAR and DFARS clauses, including those regarding the Buy American Act and the Berry Amendment. A price evaluation preference is available for certified HUBZone small businesses. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Quotations are due by October 27, 2026, and should be submitted via the DLA-BSM Internet Bid Board System.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 7 days

General Info

NAICS

335311 - Power, Distribution, and Specialty Transformer Manufacturing

Place of Performance

Jamestown, KY, 42629, USA

Set-Aside

NONE

Documents

23

W912P522R0013-0004 Wolf Creek Power Plant GSU Transformer Replacement

PDF, High priority: read this first6 pages · amendment
High

W912P522R0013 Amendment 0001 - Wolf Creek Power Plant GSU Transformer Replacement

PDF, High priority: read this first8 pages · amendment
High

W912P522R0013 Amendment 0002

PDF, High priority: read this firstamendment
High

W912P522R0013 Amendment 0002 - TSpecs WOL+GSU+XFMR Replacement

PDF, High priority: read this first186 pages · amendment
High

W912P522R0013 Amendment 0003 - Wolf Creek GSU Transformer Replacement

PDF, High priority: read this first3 pages · amendment
High

W912P522R0013 Amendment 0005 - Wolf Creek Power Plant GSU Transformer Replacement

PDF, High priority: read this first3 pages · amendment
High

W912P522R0013 Amendment 0006

PDF, High priority: read this firstamendment
High

W912P522R0013 G-002 Drawing Index - Cumberland River GSU Replacement

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - GSU Replacement Cumberland River Wolf Creek Dam E-201

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - Main Transformer Bank No 2 Elevation

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - S-103 Install Plan View Concrete Bank 2

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 S-501 Containment Detail Sheet

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 TSpecs - WOL GSU XFMR Replacement AM4

PDF, High priority: read this firstspecifications
High

W912P522R0013 - Wolf Creek Dam GSU Replacement E-601 Main One Line Diagram

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - Wolf Creek Dam GSU Replacement ED101

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - Wolf Creek Dam GSU Replacement ED102

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - Wolf Creek Dam GSU Replacement ED103

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 - Wolf Creek Dam GSU Replacement Main One Line Diagram

PDF, High priority: read this first1 page · specifications
High

W912P522R0013 Wolf Creek GSU Transformer Replacement - Submittal Register

PDF, High priority: read this first22 pages · specifications
High

W912P522R0013 - Wolf Creek Power Plant GSU Transformer Replacement

PDF, High priority: read this first99 pages · ifb
High

Wage Determination KY20230058 - Heavy Construction

PDF, High priority: read this firstwage-determination
High

Wolf Creek GSU Transformer Name Plates (Appendix D)

PDF, High priority: read this first5 pages · specifications
High

Wolf Creek Power Plant PCB Oil Analysis Report 43992

PDF, Low priority1 page · specifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

20 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 30, 2022 to Dec 10, 2022. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Feb 6, 2023 to Mar 8, 2023. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Mar 8, 2023. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Mar 8, 2023. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 8, 2023 to Mar 16, 2023. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Mar 16, 2023 to Mar 8, 2023. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 8, 2023 to Mar 16, 2023. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 6:00 PM UTC on Mar 16, 2023. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 16, 2023 to Mar 30, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 30, 2023 to Apr 6, 2023. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
Contacts2 people available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA

Full Description

Show more
Amendment 0006 for W912P522R0013 Notice to Cancel Solicitation for: Wolf Creek Pow er Plant Generator Stepup Unit (GSU) Transformer Replacement, Jamestown, Kentucky Amendment 0005 - Purpose of the Amendment: Extend the proposal due date from 30 March 2023 at 1:00pm Central Time to 06 April 2023 at 1:00pm Central Time.

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

NAICS: 53119
New
Federal
Office Space For US Army COE - Lenoir City, TN Area
Solicitation # DACW62526001
The Department of Defense, through the US Army COE Endist Nashville, is soliciting offers for the lease of approximately 900 to 1,525 rentable square feet of office and warehouse space in the Lenoir City, Tennessee area. The desired facility should be located within a 25-mile radius of Lenoir City, with preferred areas including Martel, Farragut, Cedar Bluff, Wood Creek West, Oak Ridge, Scarboro, and Hardin Valley. Required amenities include hardwall offices, a conference room, restrooms, a break room, broadband or fiber optic infrastructure, and approximately 6 to 8 public parking stalls. The lease is structured for an initial one-year term with four renewal options, targeting an occupancy date of January 1, 2027. The government will award the contract to the acceptable offer with the lowest price per square foot based on ANSI/BOMA Z65.I-1996 standards. Offerors must provide floor plans, a valid Certificate of Occupancy, and a Pre-Lease Building Security Plan. Key safety and security requirements include compliance with NFPA 101 Life Safety Code, ADA-ABA accessibility guidelines, and the installation of shatter-resistant material on all exterior windows. Additionally, the lessor must maintain accurate HVAC diagrams and strictly control access to mechanical areas and roofs. This solicitation falls under NAICS code 531190, and respondents must submit the required GSA representations and certifications regarding small business status and federal compliance.

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS