This Solicitation opportunity from Ohio was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wright Center - Convert Existing Philips MRI to Siemens MRI (Room 1253)

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-255420-CMR.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 11 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Ohio State University Wexner Medical Center is seeking a Construction Manager at Risk for the renovation of the Wright Center at 2050 Kenny Road in Columbus, Ohio. The primary scope involves replacing an existing MRI in room 1253 with a Siemens Cima X 3T, which requires modifications to the adjacent control and equipment rooms totaling approximately 1,000 square feet. Key technical requirements include replacing insufficient RF shielding, installing a new dedicated chiller, and replacing an end-of-life Liebert unit. There is also a possibility that the contract may be amended to include the replacement of a PET CT in room 1252. The selected firm will provide comprehensive preconstruction and construction services, including constructability reviews, cost estimating, and the management of a competitive open-book bidding process for subcontractors. The project requires adherence to the EDGE program, University Sustainability Standards, and the use of the e-Builder project management system. The CM is responsible for all asset tagging, project safety, and compliance with Wexner Medical Center health and background check policies. Selection will be based on experience with active hospital renovations, MRI and PET CT projects, and previous work with the State of Ohio or Ohio State University.

General Info

CM at Risk for Wright Center MRI renovation and potential PET CT replacement.

Agency

The Ohio State UniversityView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

RFQ-OSU-255420-CMR.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / Agency
The Ohio State University
View Agency Profile
Office AddressN/A
Contacts
Mitch DolleryProject Manager

Full Description

Show more
Project number: OSU-255420
The Ohio State University Wexner Medical Center is requesting qualifications from interested Construction Manager at Risk for a renovation in The Morehouse Medical Plaza – Concourse – Wright Center at 2050 Kenny Road in Columbus, Ohio. This project will replace an existing MRI in room 1253 which will include modifications to the adjacent control (1251) and equipment (1251A) rooms, a total of approximately 1,000sf. This MRI will be utilized for both patient care for OSU Medical Center and research functions for OSU College of Medicine. It is anticipated that mechanical, electrical, and other utility upgrades may be required to support the new MRI, including but not limited to installation of a new dedicated chiller. The basis of design is a Siemens Cima X 3T. This project will require coordination with the Medical Center’s imaging equipment vendor/installer for the new MRI. The existing RF shielding has been determined to be insufficient for the new 3T MRI and will need replaced as part of this project, as well as an existing Liebert unit in the equipment room that is at end-of-life. It is currently under consideration to also replace the existing PET CT across the hall in room 1252. Though not included in the scope or estimated budget at the time of the posting, if later approved to move forward within a reasonable timeframe, the contract could be amended to add the PET CT and its adjacent control and equipment rooms to this project. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CM will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CM is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method/Role on Project (CMr) 2. Experience with Renovations in Active Hospital or Ambulatory Settings 3. Experience with MRI and PET CT Projects 4. State of Ohio and/or Ohio State Administered Projects For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 236220
New
SLED
Wexner Medical Center - Community Facilities
Solicitation # OSU-265987
The Ohio State University is seeking a Construction Manager at Risk (CMR) for the Wexner Medical Center Community Facilities project, which involves the phased construction of up to two community facilities. The selected CMR will provide comprehensive pre-construction and construction services, including site feasibility evaluations, program verification, and the development of a standardized model for future facilities. Key responsibilities include collaborating with the architectural and engineering team to manage budgets, schedules, and constructability reviews, as well as overseeing the subcontractor bidding process using an open book pricing method. The project requires specialized expertise in medical center construction, specifically regarding pharmacy clean construction and linear accelerator vaults, and emphasizes the use of pre-fabrication strategies. The project must be executed within a collaborative BIM-enabled environment adhering to the university's BIM Project Delivery Standards, including specific requirements for model authoring, clash detection, and asset tagging. The CMR is responsible for project safety, means and methods of construction, and compliance with the Davis Bacon Wage Rate Determination, EDGE program requirements, and university sustainability and health policies. Selection is a two-stage process consisting of a qualifications-based RFQ to create a short list, followed by a best value RFP process combining qualifications and fees. Final contract sums will be established via a Guaranteed Maximum Price amendment, and all subcontracts must utilize the prescribed OAC Section 153:1-03-02 form.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 541310
New
SLED
James Cancer Center - Community Facilities
Solicitation # OSU-265987
The Ohio State University is seeking qualifications for architectural and engineering services for the James Cancer Center Community Facilities project, identified as OSU-265987. The primary objective is to develop a standardized design model for future cancer-focused community facilities, which includes site feasibility evaluations, program verification, and full design for the first two construction sites. The scope of work encompasses a comprehensive range of services, including schematic design, design development, construction document preparation, bidding support, construction administration, and post-construction closeout. Specialized design requirements include pharmacy design meeting USP standards, linear accelerator vaults, and specific interior elements such as infusion suites and procedure rooms. The project mandates strict adherence to The Ohio State University BIM Project Delivery Standards, requiring a collaborative BIM-enabled environment with specific deliverables such as Design Intent BIMs and asset tagging. The selected firm must also comply with University Sustainability Standards and participate in the Encouraging Growth, Diversity and Equity program. Evaluation of applicants will be based on a weighted scoring system considering firm location, workload, licensed professional count, and specific experience with similar medical facilities and BIM delivery. All services must be performed within the United States, and the lead firm must be a registered professional architect, landscape architect, or engineer.
Architectural Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS