Wright Center - Convert Existing Philips MRI to Siemens MRI (Room 1253)

Closed
OSU-255420State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated cost for the project is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract will be awarded based on the lowest price, with proposals requiring pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American statute requirements. Bonding requirements vary by proposal value, with those 150 thousand dollars and greater requiring bid, payment, and performance bonds. Administrative requirements include submitting monthly invoices via Wide Area Work Flow and following a three-phase quality control process. Final acceptance is contingent upon a series of inspections, including a pre-final punch list and a final acceptance inspection conducted by the Contracting Officer and government representatives.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile repair, flooring replacement with rubber wall base installation, and necessary electrical and plumbing work, including vanity and cabinet replacement. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within 15 days thereafter. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, evaluating price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Bidders must provide a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. Compliance with NFPA-101, ADA, OSHA, and EPA regulations is mandatory, and the contract is subject to the Davis-Bacon Act, requiring specific minimum wage and paid sick leave standards. Contractors must maintain automobile liability insurance and name Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and the contractor must provide a one-year guarantee of workmanship.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. Proposing contractors must provide all labor, materials, equipment, and supervision, ensuring compliance with the Davis Bacon Act under wage determination OR20260100. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Awardees are required to provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the removal of debris, successful system testing, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The Ohio State University Wexner Medical Center is seeking a Construction Manager at Risk for the renovation of the Wright Center at 2050 Kenny Road in Columbus, Ohio. The primary scope involves replacing an existing MRI in room 1253 with a Siemens Cima X 3T, which requires modifications to the adjacent control and equipment rooms totaling approximately 1,000 square feet. Key technical requirements include replacing insufficient RF shielding, installing a new dedicated chiller, and replacing an end-of-life Liebert unit. There is also a possibility that the contract may be amended to include the replacement of a PET CT in room 1252. The selected firm will provide comprehensive preconstruction and construction services, including constructability reviews, cost estimating, and the management of a competitive open-book bidding process for subcontractors. The project requires adherence to the EDGE program, University Sustainability Standards, and the use of the e-Builder project management system. The CM is responsible for all asset tagging, project safety, and compliance with Wexner Medical Center health and background check policies. Selection will be based on experience with active hospital renovations, MRI and PET CT projects, and previous work with the State of Ohio or Ohio State University.

General Info

CM at Risk for Wright Center MRI renovation and potential PET CT replacement.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
Mitch DolleryProject Manager

Full Description

Show more
Project number: OSU-255420
The Ohio State University Wexner Medical Center is requesting qualifications from interested Construction Manager at Risk for a renovation in The Morehouse Medical Plaza – Concourse – Wright Center at 2050 Kenny Road in Columbus, Ohio. This project will replace an existing MRI in room 1253 which will include modifications to the adjacent control (1251) and equipment (1251A) rooms, a total of approximately 1,000sf. This MRI will be utilized for both patient care for OSU Medical Center and research functions for OSU College of Medicine. It is anticipated that mechanical, electrical, and other utility upgrades may be required to support the new MRI, including but not limited to installation of a new dedicated chiller. The basis of design is a Siemens Cima X 3T. This project will require coordination with the Medical Center’s imaging equipment vendor/installer for the new MRI. The existing RF shielding has been determined to be insufficient for the new 3T MRI and will need replaced as part of this project, as well as an existing Liebert unit in the equipment room that is at end-of-life. It is currently under consideration to also replace the existing PET CT across the hall in room 1252. Though not included in the scope or estimated budget at the time of the posting, if later approved to move forward within a reasonable timeframe, the contract could be amended to add the PET CT and its adjacent control and equipment rooms to this project. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CM will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CM is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method/Role on Project (CMr) 2. Experience with Renovations in Active Hospital or Ambulatory Settings 3. Experience with MRI and PET CT Projects 4. State of Ohio and/or Ohio State Administered Projects For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 236220
New
SLED
Fawcett Center Renovations
Solicitation # OSU-270004
The Ohio State University is soliciting a Construction Manager at Risk (CMR) for project OSU-270004, which involves the renovation of the west wing of the Fawcett Center. The project will transform approximately 18,000 square feet of vacant space into a modern, collaborative workplace to consolidate the Athletic Administration/Business Administration, the Eugene D. Smith Leadership Institute, and the Content Creation Team. The scope includes the creation of private offices, open work areas, conference rooms, and video/photography studios, along with necessary upgrades to mechanical, electrical, and plumbing (MEP) systems. The selected CMR will provide comprehensive services across preconstruction, construction, and closeout phases, including constructability reviews, cost estimating, and the management of subcontractor bidding via an open-book pricing method. A critical requirement is the use of a collaborative BIM-enabled environment following University BIM Project Delivery Standards, including specific use cases for model authoring, clash prevention, and asset tagging. The project must adhere to University Sustainability Standards and utilize the e-Builder project management system. Award selection is based on a best-value criteria combining qualifications and fee, with a strong emphasis on the firm's experience with CMR delivery, BIM implementation, and working within occupied buildings.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS