Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wright Co. 2026 Batch and Build EOF Project

Closed
EOF 2026-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 3 hours ago

DEADLINE

in about 22 hours

AI Contract Overview

Show more

The Wright Co. 2026 Batch and Build Edge-of-Field Project, solicitation number EOF 2026-03, is a construction contract issued by the Iowa Department of Agriculture and Land Stewardship for the installation of four bioreactors and seven saturated buffer structures in Wright County, Iowa. With an estimated cost range between $165,000 and $185,000, the scope of work includes excavation, earthwork, grading, mobilization, and seeding. Key materials required for the project include water control structures, woodchips, geotextile fabric, and perforated and non-perforated piping. All work must comply with Iowa NRCS Construction Specifications, and the contractor is required to provide specific documentation such as geotextile and seed tags to the NRCS. Bids must be submitted electronically via the IMPACS portal by October 6, 2026, and the contract will be awarded to the lowest responsible bidder. Applicants must be registered with the Iowa Department of Inspections, Appeals and Licensing and provide a 10% bid bond, with the successful bidder required to furnish a performance and payment bond equal to 100% of the contract price. Following the Notice of Award, the contractor has 14 calendar days to execute the contract and provide insurance and bonding. Construction is required to commence within 14 days after the preconstruction conference. Final acceptance is contingent upon a successful on-site walkthrough and the completion of all punch list items.

General Info

Iowa construction contract for bioreactors and buffers in Wright County; bids due 10/6/2026.

Documents

9

Bid No. EOF 2026-03: Wright Co. 2026 Batch and Build Edge-of-Field Project

PDF, High priority: read this firstrfb
High

Construction Plans part 3 - Trench and Outlet Details

PDF, High priority: read this firstspecifications
High

EOF 2026-03: Wright Co. 2026 Batch and Build Edge-of-Field Project

PDF, High priority: read this firstrfb
High

EOF 2026-03: Wright Co. 2026 Batch and Build EOF Project

PDF, High priority: read this first9 pages · rfb
High

Saturated Buffer 1W & 2W Construction Plans - Wright County, Iowa

PDF, High priority: read this firstspecifications
High

Wright Co. 2026 Batch and Build Edge-of-Field Project - Notice to Bidders

PDF, High priority: read this firstitb
High

Wright County Batch and Build Project - Construction Specifications

PDF, High priority: read this firstspecifications
High

Wright County, Iowa - Site 2 SB1 Saturated Buffer Construction Plans

PDF, High priority: read this firstspecifications
High

Bid No. EOF 2026-03 - Proposal Guarantee (Bid Bond)

PDF, Low prioritybid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
Contacts1 person available
OfficeDes Moines, IA, 50319, USA
Office AddressDes Moines, IA, 50319, USA

Full Description

Show more
This project includes 4 bioreactors and 7 saturated buffer structures located in Wright County, Iowa. The estimated cost range for this project is $165,000-$185,000. Some of the materials required for this project include: water control structures (WCS), woodchips, geotextile fabric, perforated and non-perforated piping, outlet structures, amidst other items. In general, the work involves, and is not limited to, excavation, earthwork, grading, mobilization, and seeding.

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237110
SLED
26-13 Wor982210D (Worth)
Solicitation # 26-13
The Wor982210D Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of East and West wetland systems in Worth County, Iowa. The scope of work includes selective clearing, excavation of approximately 7,500 cubic yards of earthwork, installation of 700 linear feet of pipe, and the placement of 129 tons of riprap. Key infrastructure deliverables include three solar pump systems, two modified SW-512 intake concrete structures, three modified SW-513 outlet concrete structures, and two modified SW-401 and 402 lift station concrete structures, concluding with 2.5 acres of seeding. The estimated construction cost is between $225,000 and $325,000. The contract will be awarded to the lowest responsible bidder, with a bid submission deadline of November 12, 2026. Performance requirements include a 10% bid bond and a performance/payment bond equal to 100% of the contract price, which must remain in place for one year following final acceptance. All work except seeding must be completed by September 1, 2027, with all seeding finalized by December 15, 2027. Project administration includes a 3% retainage on progress payments and requires strict adherence to OSHA safety standards and NRCS specifications. Final acceptance is contingent upon a written certification from the engineer, Bolton & Menk, and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS