Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P--WV CANAAN VLY NWR BONNER HS DEMO

Closed
140FC226Q0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Bonner House demolition project at Canaan Valley National Wildlife Refuge in Davis, West Virginia, is a total small business set-aside under NAICS code 238910, requiring full demolition and removal of the deteriorated structure due to the presence of asbestos-containing materials. The work encompasses asbestos abatement in compliance with EPA and state regulations, demolition of all structural components including foundation, floors, walls, stairs, and roofs, lawful disposal of debris at EPA-approved landfills, and site restoration through grading, seeding, and mulching. The steel garage and septic system/drain field are explicitly excluded from demolition. The contractor must submit a project schedule, proof of all required permits, waste disposal manifests, photographic documentation of pre- and post-demolition conditions, and a final report confirming completion. Work must adhere to OSHA demolition standards and all applicable federal, state, and local regulations, with performance limited strictly to personnel, procedures, and materials specified in the bid response. Any changes or substitutions require written approval from the Contracting Officer. The procurement is a firm fixed price contract awarded on a price-only basis, with the submitted quote covering all labor, materials, equipment, transportation, supervision, overhead, and profit. Offers must be submitted electronically to William Koski by July 23, 2026, and must include a completed Standard Form 1442 and Quote Schedule with unit prices and extended totals. The contract incorporates clauses for definitions, prohibition of internal confidentiality agreements, SAM maintenance, incorporation of representations, and a Department of the Interior prohibition on lead-based paint. The contractor must comply with wage determinations from the Department of Labor and submit certified payrolls and compliance statements with all invoices. Payments are processed exclusively through the Treasury’s Invoice Processing Platform, and the contractor must register in SAM with the designated point of contact receiving enrollment instructions within 3–5 business days of award. No performance or payment bonds are required. The period of performance is August 1, 2026, to September 30, 2026, with work to commence within 14 days of notice to proceed. All personnel must be informed of restricted area limitations, and work during fire danger season must comply with state fire prevention laws and COR directives.

General Info

Demolish asbestos-contaminated Bonner House in Davis, WV; small business set-aside; proposals due July 15, 2026.

Agency

Department Of The Interior → Construction A/e Team 2 FwsView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

VA

Set-Aside

SBA

Documents

(8)

SOW Full Demolition of Bonner House with Wage Rate Clauses

PDFsow

Asbestos Inspection Report for US Fish and Wildlife Service, Davis WV

PDFinspection-report

Solicitation 140FC226Q0037 Bonner House Asbestos Removal and Demolition

PDFifb

A06 Bonner House Photos

PDFother

Bonner House Demolition RFI 0002

PDFrfi

Section B - Prices Quote Schedule for Bonner House Demolition

PDFprice-schedule

Amendment 0002 to Solicitation 140FC226Q0037

PDFamendment

Sol_140FC226Q0037_Amd_0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 2 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Organization / Agency
Department Of The Interior → Construction A/e Team 2 Fws
View Agency Profile
Office AddressFalls Church, VA, 22041, USA
Contacts
Koski William

Full Description

Show more
Bonner House Asbestos Removal and Demolition located at 3664 CORTLAND RD, DAVIS WV 26260 The purpose of this project is to fully demolish and remove the Bonner House structure due to its deteriorated condition and the presence of asbestos-containing materials.
Removal of the structure will eliminate safety hazards, support refuge management objectives , and prepare the site for future use.

Site Visit: 6/30/2025, 10:00 AM, POC: Matt Boarman, matthew_boarman@fws.gov
Questions: 7/8/2026, to Bill Koski, william_koski@ios.doi.gov
Quotes Due: 7/15/2026, to Bill Koski, william_koski@ios.doi.gov

Due Date Amended, changed to 7/23/2026

More opportunities from Department Of The Interior → Construction A/e Team 2 Fws

Same awarding agency

NAICS: 238220
New
Federal
N--Generator and ATS Replacement - Allegheny NFH, PA
Solicitation # 140FC226Q0049
Solicitation 140FC226Q0049 is a Total Small Business Set-Aside for a firm-fixed-price construction contract to replace the emergency power system at the U.S. Fish and Wildlife Service Allegheny National Fish Hatchery in Warren, Pennsylvania. The project involves the removal of an existing 675 kW Caterpillar standby generator and the installation of a new 500 kW Caterpillar generator and Automatic Transfer Switch (ATS). To facilitate the installation, the contractor must temporarily remove and reinstall five bollards and a 2,000-gallon diesel fuel tank. The work is mission-critical to ensure continuous backup power for groundwater wells and fish culture operations, requiring the contractor to maintain power continuity via a temporary generator. The construction magnitude is estimated between $100,000 and $250,000, with a period of performance of 360 days after the notice to proceed. The award will be based on best value, considering both price and past performance, with non-price factors weighted as slightly more important than price. Offerors must provide three examples of similar projects completed within the last five years. The project requires compliance with NEC (NFPA) standards, OSHA 29 CFR 1926 and 1910 safety regulations, and Davis-Bacon wage determinations for Warren County. Key deliverables include a complete commissioning and acceptance package, O&M manuals, warranty information, and as-built drawings. Quotes are due by September 17, 2026, at 11:00 AM Central Time, and must be submitted via email to the designated point of contact.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS