P--WV CANAAN VLY NWR BONNER HS DEMO
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract solicitation for the demolition and removal of the Bonner House at Canaan Valley National Wildlife Refuge in Davis, West Virginia, is a Firm Fixed Price construction requirement under solicitation number 140FC226Q0037, issued by the U.S. Department of the Interior’s Construction A/E Team 2 FWS. The project requires complete demolition of the deteriorated structure, including removal of foundations, floors, walls, stairs, and roofs, with mandatory asbestos abatement in accordance with EPA and state regulations, and disposal of all asbestos-containing materials at an EPA-approved landfill. The existing steel garage and septic system/drain field must be preserved, and the site must be restored through grading, seeding, and mulching. The work is designated as a Total Small Business Set-Aside under NAICS code 238910, and award will be based solely on price, with all line item quotes required to include labor, equipment, materials, overhead, profit, and all incidental costs. The contractor must submit a project schedule, proof of permits, waste manifests, photographic documentation, and a final compliance report, adhering to OSHA demolition standards and all applicable federal, state, and local laws. The period of performance runs from August 1, 2026, to September 30, 2026, with work expected to commence within 14 calendar days of the notice to proceed. All submissions must be sent electronically to William Koski by July 3, 2026, at 3:00 PM EDT, and include a completed Standard Form 1442 and Quote Schedule with unit prices and extended totals. The contractor must comply with SAM registration requirements, incorporate all listed representations and certifications, and adhere to strict prohibitions on unauthorized personnel access and substitution of personnel, materials, or procedures without written consent from the Contracting Officer. Invoicing must be processed through the U.S. Treasury’s Invoice Processing Platform, with certified payrolls and a Statement of Compliance required for payment, and a final release of claims submitted with the final invoice. No performance or payment bonds are required, but subcontractors must be bound by the same site access restrictions and compliance obligations. The contractor is responsible for all postage, fees, and compliance with fire danger season rules if work is authorized during such periods.
General Info
Agency
NAICS
Place of Performance
VASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Removal of the structure will eliminate safety hazards, support refuge management objectives , and prepare the site for future use.
Site Visit: 6/30/2025, 10:00 AM, POC: Matt Boarman, matthew_boarman@fws.gov
Questions: 7/8/2026, to Bill Koski, william_koski@ios.doi.gov
Quotes Due: 7/15/2026, to Bill Koski, william_koski@ios.doi.gov
Due Date Amended, changed to 7/23/2026
