WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is a solicitation for a Women-Owned Small Business (WOSB) construction contractor specializing under NAICS code 237990 to perform repairs on the Stormwater Spill Gate 11 structure at Tinker Air Force Base, Oklahoma. The project involves the complete restoration of the concrete spill gate to reestablish proper stormwater flow through the existing channel from within Tinker AFB, outside the perimeter fence via Soldier Creek. The work includes the provision of all necessary materials, labor, equipment, testing services, quality control, and other incidentals required for the successful completion of the repair. Interested contractors must review the project-specific documents attached to the solicitation and request access to these documents through the designated contracting points of contact if needed, ensuring requests are only made by prime contractors. An Initial Site Visit is mandatory for eligibility to submit a proposal and requires an RSVP by 2:00 pm CT on June 12, 2026, including an Entry Access List if base access is needed for any personnel. The proposal submission deadline is July 20, 2026, at 2:00 pm CST. Points of contact for this contract are Austin Elm and Sharla Flowers, who will coordinate document access and the scheduling of the site visit.
General Info
Agency
NAICS
Place of Performance
S Coffeyville, OK, 73145, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
This posting is for Tinker AFB – WOSB construction contractors with NAICS 237990.
Project Solicitation Number: FA813726R0032
Project Title: WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Project Location: Tinker Air Force Base
WWYK250096 - Repair Stormwater Spill Gate 11 Structure- The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the concrete spill gate structure (Spill Gate 11 / Outfall 9) to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Solider Creek at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CT on 12 June 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
The proposal will be due 20 July 2026 at 2:00PM CST.
