Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on June 5, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WY FLAP 23-154(1), Fremont Lake Road

Awarded
DTFH6814B00023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Bramble Park Trail
Solicitation # 273C909397
Solicitation 273C909397 is an invitation for bids issued by the City of Cincinnati Department of Parks for the construction of the Bramble Park Trail. The project involves creating an approximately 1,000-foot shared use path between Bramble Park and Settle Street in Madisonville. The scope of work includes installing an aggregate base and asphalt surface, constructing concrete landings at both ends, installing 100 linear feet of bikeway railing, and implementing stormwater improvements consisting of two yard drains and 100 linear feet of perforated pipe. Additional requirements include site preparation, the removal of five trees, and the planting of five replacement deciduous trees. All work must adhere to City of Cincinnati standards, ODOT Construction and Material Specifications, and regulations from the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works. Bids must be submitted electronically via the Vendor Self Service portal by October 28, 2026, at 12:00 p.m. EST. The submission must include completed forms as a single PDF and a detailed Excel bid form. The contract will be awarded to the lowest and best responsive bidder, with specific goals for Minority Business Enterprise (8%) and Women Business Enterprise (10%) participation. The project features a 60-day construction period divided into three phases. Contractors are required to provide bid, performance, and payment bonds, adhere to State of Ohio prevailing wage rates, and comply with OSHA safety standards. Special provisions are included for the immediate suspension of work upon the discovery of archaeological remains and strict adherence to non-discrimination and equal employment opportunity laws.
Department Of Parks

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves a site visit scheduled for September 25th at 9:00 am at the Sublette County Courthouse in Pinedale, Wyoming, for the WY FLAP 23-154 Fremont Lake Road project. This project entails approximately 6.93 miles of 4R construction on Fremont Lake Road located about three miles from Pinedale in Sublette County. The scope includes two main schedules: Schedule A, covering road construction along with earthwork and establishing an aggregate base for a parallel bike path; and Schedule B, which adds paving of the bike path to the work outlined in Schedule A. Additionally, there are two optional components—Option X involves pulverization and paving of campground spur roads at the Elkhart Trailhead, while Option Y includes similar work for parking lots at the same location. The project’s estimated contracting range is between $6 million and $10 million, but this notice is not an invitation for bid, and the plans and specifications are not available yet due to delays. The bid documents and detailed plans are expected to be released in February or March 2015. The contracting agency is the Department of Transportation’s Central Federal Lands Division, with the place of performance being Pinedale, WY. Key contacts for this project include the Contract Specialist Joe Wilson and Acquisition Program Specialist Aaron L. Sanford. The project falls under NAICS code 237310, which relates to highway, street, and bridge construction.

General Info

Site visit September 25 for Fremont Lake Road 4R construction and bike path paving in Wyoming.

Contract Value

$7,655,727.54

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Freemont Lake, PINEDALE, WY, 82941, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseAwarded
Posted

special-notice

Notice updated

Response deadline changed from Sep 25, 2014 to Jan 30, 2015. The notice description changed.

Notice updated

The response deadline was removed. The notice description changed.

Notice updated

Notice type changed from Special Notice to Presolicitation. Response deadline added: May 12, 2015. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 12, 2015 to May 13, 2015. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Joseph L WilsonContract Specialist
Jeremiah B. RogersAcquisitions- Construction Procurement

Full Description

Show more
Contractor Site Visit for the WY FLAP 23-154 Fremont Lake project. September 25th 9:00am at Sublette County Courthouse 21 South Tyler Pinedale, WY 82941 Meeting at Sublette County Commissioners Meeting Room Project Details: The project includes 6.93 miles of 4R construction on the Fremont Lake Road in Sublette County WY. The project starts approximately 3 miles from the town of Pinedale, WY. Schedule A includes construction of the road and the earthwork and aggregate base for a bike path to be constructed parallel to the roadway. Schedule B includes all work in Schedule A plus the paving of the bike path. Option X contains pulverization and paving of campground spur roads at the Elkhart Trailhead. Option Y contains pulverization and paving of parking lots at the Elkhart Trailhead. Contracting range for this project is between $6 million and $10 million. This is not an Invitation for Bid, plans and specs are not available. Advertisement is planned for mid to late October.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS