Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--CUVA 224822

Closed
140P2026R0093Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract is a Firm-Fixed-Price (FFP) solicitation issued by the National Park Service’s Denver Service Center Contracting Services Division on behalf of the Department of the Interior for the stabilization of the Cuyahoga Riverbank along the Towpath Trail near Mile Marker 20 South in Cuyahoga Valley National Park, Ohio. The work involves implementing natural rock riprap and bioengineering techniques to stabilize eroding riverbanks, including clearing the banks, placing riprap, rebuilding damaged sections, planting native vegetation to reinforce soil integrity, and remediating construction access routes. The project has an estimated value between $1 million and $5 million, with a planned performance period of 260 calendar days from the Notice to Proceed. It is designated as a Small Business Set-Aside under NAICS code 237990 (Other Heavy and Civil Engineering), with a size standard of $45 million, and prospective offerors must maintain an active SAM registration and possess a Unique Entity Identifier to be eligible. The contractor is required to secure all necessary permits, perform topographic and bathymetric surveys, submit design development and construction documents for approval, provide signage and pedestrian detours during construction, and deliver as-constructed drawings and a comprehensive operations and maintenance manual upon completion. Evaluation of proposals will follow a Best Value trade-off process in accordance with FAR 15.101-1, where technical and non-price factors combined are significantly more important than price. The technical evaluation includes assessment of the offeror’s technical approach, management approach, schedule, key personnel, and past performance, each contributing to the overall best value determination. Bid, performance, and payment bonds are mandatory, and all inquiries must be submitted in writing to the designated contracting officer or specialist; verbal communications are not accepted. The solicitation was posted on July 14, 2026, with proposals due by August 13, 2026. Although this is currently an unfunded requirement, funding is expected to be available. Final submission instructions, format requirements, and delivery details will be contained in the forthcoming formal solicitation, which is scheduled to be issued on or after July 13, 2026. The place of performance is exclusively at Cuyahoga Valley National Park in Ohio, and the contractor is responsible for ensuring public safety and access control throughout the duration of construction activities.

General Info

Stabilize Towpath Trail riverbank near MM20 South to prevent erosion; due July 13, 2026.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO

Set-Aside

NONE

Documents

36

11_CUVA_224822 Closeout and O&M Requirements

PDF, High priority: read this first1 page · sow
High

Amendment 0001 to Solicitation 140P2026R0093

PDF, High priority: read this first1 page · amendment
High

Amendment 0002 to Solicitation 140P2026R0093

PDF, High priority: read this first2 pages · amendment
High

Bid Bond Document

PDF, High priority: read this first2 pages · bid-bond
High

Contract 140P202000003 - River Bank Stabilization Survey (MM 20 South)

PDF, High priority: read this firstspecifications
High

Contract Price Schedule - Design-Build for Stabilie Riverbank Project

XLSX, High priority: read this first1 page · contract-price-schedule
High

CUVA #224822 Basis of Design Report for Cuyahoga Valley National Park Mile Marker 20 South Site

PDF, High priority: read this firstbasis-of-design-report
High

CUVA224822 MM20 Erosion Control and Stabilization Plan Set August 2023

PDF, High priority: read this first18 pages · plan-set
High

CUVA 224822 Permit Submittal List

DOCX, High priority: read this first5 pages · permit-submittal-list
High

CUVA 224822 Program of Requirements for Riverbank Stabilization at MM 20 South

PDF, High priority: read this first10 pages · program-of-requirements
High

CUVA224822 Riverbank Stabilization Basis of Design Report

PDF, High priority: read this firstbasis-of-design-report
High

CUVA 224822 Riverbank Stabilization Design-Build RFP

PDF, High priority: read this first42 pages · rfp
High

CUVA 224822 Schematic Design Preferred Alternative Draft Design Documents

PDF, High priority: read this firstsow
High

CUVA 224822 Submittal List with Review Estimate

PDF, High priority: read this first6 pages · submittal-list
High

CUVA Access and Staging Maps

PDF, High priority: read this first2 pages · specifications
High

CUYAHOGA VALLEY NATIONAL PARK Riverbank Stabilization Project Specifications May 2026

PDF, High priority: read this first106 pages · specifications
High

CUYAHOGA VALLEY NATIONAL PARK Riverbank Stabilization Project Specifications May 2026

PDF, High priority: read this first146 pages · specifications
High

NPS Clean Fill Protocol

PDF, High priority: read this first4 pages · specifications
High

NPS Constructability Checklist for Cuyahoga Valley Project CUVA 224822

PDF, High priority: read this first3 pages · constructability-checklist
High

NPS Sustainability Checklist for Stabilize Riverbank at MM20

XLSX, High priority: read this first26 pages · checklist
High

NPS Sustainability Checklist - Schematic Design

PDF, High priority: read this first12 pages · sow
High

PEPC 116064 Programmatic Categorical Exclusion for Riverbank Stabilization 2023-2028

PDF, High priority: read this first7 pages · categorical-exclusion-documentation
High

Permitting Assessment Form for Stabilize Riverbank Project MM20

XLSX, High priority: read this first11 pages · form
High

Pre-Solicitation Notice for RFP 140P2026R0093 - Cuyahoga Valley National Park Construction Services

PDF, High priority: read this firstpresolicitation
High

Report on Limitations on Subcontracting Template

XLSX, High priority: read this first1 page · report-limitations-subcontracting
High

Solicitation 140P2026R0093 CUVA 224822 Riverbank Stabilization Project

PDF, High priority: read this first67 pages · ifb
High

Solicitation 140P2026R0093 - Cuyahoga Valley Riverbank Stabilization Design-Build

PDF, High priority: read this first3 pages · ifb
High

Solicitation 140P2026R0093 Past Performance Questionnaire

DOCX, High priority: read this first3 pages · past-performance
High

Solicitation 140P2026R0093 Project Experience Questionnaire

DOCX, High priority: read this first1 page · project-experience-questionnaire
High

Solicitation 140P2026R0093 Q&A Tracker

XLSX, High priority: read this first48 pages · q-and-a
High

Solicitation 140P2026R0093 Q&A Tracker

PDF, High priority: read this first49 pages · q-and-a
High

Wage Determination OH20260001

PDF, High priority: read this firstwage-determination
High

Wetland Statement of Findings for Cuyahoga Valley National Park MM 20 South Stabilization

DOCX, High priority: read this first26 pages · wetland-statement-of-findings
High

Construction Contract Administration Guidance

DOCX, Low priority1 page · other
Low

General References Form for Offerors

DOCX, Low priority2 pages · general-references
Low

Memorandum on Stabilize Riverbank at Towpath MM20 South CUVA

DOCX, Low priority2 pages · memorandum
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline time changed from 8:30 PM UTC to 7:00 PM UTC on Aug 13, 2026. The notice title changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 8:30 PM UTC on Aug 13, 2026. The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA

Full Description

Show more
STABILIZE RIVERBANK ALONG TOWPATH TRAIL NEAR MM 20 South

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the installation of a GD Membrane Bio-Reactor wastewater treatment plant, including new process facilities, instrumentation and control systems, electrical infrastructure, and administrative support buildings. The scope of work encompasses comprehensive site preparation, grading, paving, fencing, and improvements to the facility access road, as well as the complete demolition and removal of existing infrastructure once the new plant is accepted. The project includes a 12-month operational support period and requires strict adherence to Department of the Interior cybersecurity requirements, ADA and ABA accessibility standards, and union prevailing wage rates. The contract is a firm-fixed-price award with a magnitude of construction exceeding 100 million dollars. The period of performance is scheduled from February 1, 2027, to February 1, 2030, with a total performance duration of 1095 calendar days after the notice to proceed. Award selection will be based on a multi-factor, best-value tradeoff process evaluating technical experience, past performance, and proposed pricing. Offerors must provide performance and payment bonds and identify key personnel, including a Project Manager, Superintendent, and specialists in quality control, safety, and historic preservation. Proposals are submitted in two volumes, with technical evaluations focusing on the relevance of project experience and the contractor's capability to manage a project of this scope and complexity.
Sewage Treatment Facilities

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS