Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Y--Design-Build: Lahontan NFH Well Replacement

Active
140F0121R0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

OR

Set-Aside

NONE

Documents

8

DOL Wage Determination NV20210022 - Nevada Heavy Construction

PDF, High priority: read this first5 pages · wage-determination
High

Lahontan National Fish Hatchery Well No 4 and 6 Rehabilitation - Construction Drawings

PDF, High priority: read this first38 pages · specifications
High

Lahontan National Fish Hatchery Wells No. 4 and 6 35% Design Technical Memorandum

PDF, High priority: read this first85 pages · specifications
High

Solicitation 140F0121R0019 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

Solicitation 140F0121R0019 - Design-Build Lahontan NFH Well #4 and Well #6 Rehabilitation

PDF, High priority: read this first60 pages · rfp
High

SOW: Lahontan NFH Well #4 and Well #6 Rehabilitation

DOCX, High priority: read this firstsow
High

Subcontractor List Submission Form

DOCX, High priority: read this firstsupporting-document
High

Questions and Answers 0001

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Fws Pacific Regional Office
Contacts1 person available
OfficePORTLAND, OR, 97232, USA
Office AddressPORTLAND, OR, 97232, USA

Full Description

Show more
The U.S. Fish & Wildlife Service (USFWS) Joint Administrative Operations, Acquisition and Property Operations, Construction / A&E Operations located at 911 NE 11th Ave. Portland, OR 97232 intends to issue a Request for Proposal for one firm fixed price design-build construction contract for replacement of Lahontan National Fish Hatchery's Well #6 and improvements to Well #3 located near Gardnerville, Nevada. The magnitude of this project is between $1,000,000 and $5,000,000. The NAICS code for this acquisition is 237110 and the small business size standard is $39.5 Million. The basis of award will be the best value to the Government utilizing the Tradeoff process in accordance with FAR 15.101. Two-Phase Design-Build Procedures of FAR 36.3 will be used. The technical evaluation factors for Phase I are expected to be Recent, Relevant Experience and Past Performance. The technical evaluation factor for the second phase is expected to be Technical approach. Option items will be evaluated in accordance with FAR 52.217-5. The solicitation is anticipated to be issued on or around 04/23/2021, with a Phase I proposal due date approximately 30 days after. Following evaluation of Phase I, selected contractors will be invited to submit Phase II proposals. Award is expected to be made around 08/01/2021. The performance period for this contract is expected to be from Notice to Proceed to December 31, 2022. This acquisition is a TOTAL SMALL BUSINESS SET ASIDE. All responsible small business sources may submit a proposal which shall be considered by the agency. To be considered for award, interested contractors must be registered in the System for Award Management (https://www.sam.gov).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, including specialty trades for electrical, plumbing, and paving. Interested parties must submit their responses by October 21, 2026, directing all inquiries to the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding MWBE documentation and the submission of Good Faith Efforts forms. Bids are due by November 12, 2026. The project requires the successful bidder to provide performance and payment bonds, as well as proof of insurance. Performance is monitored by Willis Engineers on behalf of the City of Belmont, and the contract stipulates liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including electrical, paving, pipe supply, and aggregate supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax to Veronica Garcia by October 28, 2026, at 2:00 PM and must remain valid for 120 days. Qualified bidders must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Additionally, the contractor reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS