This Government Contract opportunity from Department Of Defense was posted on April 21, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for CD120 - Golf Course Reach Plan View: Technical drawing and specification sheet (CD120) for the Golf Course Reach (STA: C90+00 - C98+42). The document details requirements for capping water lines, removing lift stations, septic tanks, and building foundations, as well as coordination with utility companies (North Dakota Tel Co, Otter Tail Power Co) and specific grouting and backfilling instructions for embankments.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Devills Lake City Embankments Phase 3 - Solicitation W912ES-11-B-0005: Technical drawings and specifications package for the Devills Lake City Embankments Phase 3 project (Embankment Raise and Extension), dated February 2011. The document includes a sheet index for general drawings, boring plans, and boring logs, as well as general notes regarding horizontal and vertical control, utility coordination, and project location maps for the Airport and Lakewood reaches.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for DeVilske Lake Flood Risk Management Phase 3 - Solicitation W9125E-11-B-0005: Solicitation document for the DeVilske Lake Flood Risk Management Phase 3 project (W9125E-11-B-0005) issued by the U.S. Army Corps of Engineers. The document includes a bid opening date of March 31, 2011, and a detailed bid schedule/CLIN list covering demolition, water distribution, sanitary sewers, and earthwork for the Eagle Bend Golf Course area.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Devils Lake City Embankments Phase 3 - Solicitation W912ES-11-B-0005: Technical drawings and specifications for the US Army Corps of Engineers (St. Paul District) project 'Devils Lake City Embankments Phase 3', dated February 2011. The document includes a sheet index for general plans, boring logs, typical sections, and structural details for embankment raise and extension, specifically covering the Lakewood and Highway 20 pump stations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for DLCEP3_C604 - Limits of Work Area 8, G, and H: Technical document from the US Army Corps of Engineers (Civil Engineer Research and Development Center) detailing the 'Limits of Work' for Areas 8, G, and H. It contains precise survey data, including point IDs, bearings, distances, and easting/northing coordinates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USACE Airport Road Reach Plan Views (Sheets CD102-CD107): Technical drawing set and specifications for the US Army Corps of Engineers (USACE) Airport Road Reach project. The document contains plan views for stations A10+00 through A70+00 (Sheets CD102-CD107), including critical contractor notes regarding the removal of utility lines, vegetation clearing, and the use of select impervious fill for embankments.
PDF
PDF, Low prioritysite-visit-log
LowAI Summary for Phase 3 - W912ES-11-B-0005 Site Visit Sign-in Sheet: A sign-in sheet for a site visit related to contract W912ES-11-B-0005, Phase 3. The document lists attendees from USACE and various construction firms, including their names, companies, and contact phone numbers.
PDF
PDF
PDF
PDF
DOC
DOC
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
DOC
DOC
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
15 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
The response deadline was removed. The point of contact changed.
Notice updated
Response deadline added: Mar 21, 2011. The notice description changed.
Notice updated
The response deadline was removed. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline added: Mar 21, 2011.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline changed from Mar 21, 2011 to Mar 24, 2011.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Deadline changed
Response deadline changed from Mar 24, 2011 to Mar 31, 2011.
Deadline changed
Response deadline changed from Mar 31, 2011 to Mar 24, 2011.
Deadline changed
Response deadline changed from Mar 24, 2011 to Mar 31, 2011.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Devils Lake City, Ramsey County, North Dakota. The Devils Lake Flood Risk Management Phase 3 Embankments construction project will provide flood protection to the city of Devils Lake, ND. The contractor will be required to furnish all plant, labor, material and equipment to raise and extend the existing embankments along Devils Lake from elevation 1461.2 to a minimum construction grade of 1467.2 (construction grade varies by reach). Phase 3 consists of the Airport Reach (10,000 feet of new and existing embankment and road), Golf Course/Eagle Bend Reach (9,885 feet of existing embankment), Lakewood Reach (6,200 feet of new embankment), North Tieback/Roberts Reach (8,689 feet of new and existing embankment), and East End Reach (4,600 feet of new embankment). Approximately 5,600 feet of the Airport Reach will be an Option (Option 1) and the entire Lakewood Reach will be an Option (Option 2). The project also includes construction of two interior drainage pump stations (Lakewood and HWY 20), demolition of two existing interior drainage pump stations (Eagle Bend and a portion of HWY 20), utility relocations and roadway construction. Lakewood pump station will have a capacity of 20,000 gpm, while HWY 20 will have a capacity of 5,000 gpm. Cofferdams will be required to construct the Lakewood Pump Station area, and a portion of the North Tieback Reach. The estimated price range for this requirement is between $25,000,000 and $100,000,000. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $33.5 million. The solicitation will be issued as an Invitation for Bid (IFB) and will be issued as a 100% set-aside for small business concerns. The solicitation along with specifications and drawings will be issued on or about February 28, 2011.
More opportunities from Department Of Defense → W07V Endist St Paul