Z--GLCA 318876 - Low Water Access Ramp at Antelope Point DB
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract for the Low Water Access Ramp at Antelope Point, issued under solicitation number 140P2025R0021, is a full and open, design-build project managed by the Department of the Interior's National Park Service in Denver. It involves reconstructing and extending the boat launch ramp and associated infrastructure at Antelope Point within Glen Canyon National Recreation Area, with a performance period from March 17, 2026, to August 19, 2027. The scope includes designing and constructing a 150-foot-wide concrete ramp capable of servicing fluctuating lake levels, along with new paved parking areas, roadway improvements, and environmental compliance measures. The project emphasizes adherence to federal, state, and NPS standards, including geotechnical, hydrologic, and geologic considerations, supported by technical memoranda and geologic reports. The contract incorporates numerous FAR and DIAR clauses, including those related to quality control, safety, OCI, and small business subcontracting, with specific requirements for key personnel, subcontracting plans, and conflict of interest mitigation. The procurement process employs a two-phase best value tradeoff approach, evaluating technical approach, qualifications, and past performance as more important than price, with proposals assessed through a technical review panel and risk ratings. Offerors must submit separate electronic proposals for Phase I (technical and business) in accordance with strict formatting, page limits (40 pages for technical, 30 for subsequent phases), and size constraints, via email only, by the deadline specified in the solicitation. Proposal submissions require registration in SAM, inclusion of certifications, and adherence to size and socioeconomic representations. The contract also specifies detailed requirements for invoice processing through the IPP system, performance and payment bonds, and quality assurance procedures, with inspections conducted at various project stages to ensure compliance. Overall, the contract emphasizes comprehensive planning, environmental stewardship, safety, and technical excellence to deliver a sustainable, resilient ramp infrastructure tailored to fluctuating water levels and environmental conditions.
General Info
Contract Value
$62,416,000Place of Performance
CO, USASet-Aside
Awardee
W. W. CLYDE & CO.Award Issued Date
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Dsc Contracting Services Division
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
