Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Y--GOGA 319407 - Bridge Preservation

Active
140P2026R0053Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → Dsc Contracting Services DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO

Set-Aside

NONE

Documents

(2)

A14_SSN_GOGA_319407_6_Apr_26_1.pdf

PDF

GOGA_319407_PreSolicitation_Notice_2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
View Agency Profile
Office AddressDenver, CO, 80225, USA

Full Description

Show more
GOGA 319407 - Bridge Preservation

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry and Exit Paving Redevelopment Project will comprehensively upgrade the entry and exit drives along 19th Ave W, the footprint of the Downie Building (C-14), and surrounding parking areas. Damaged pavement will be milled and overlaid, while outdated stormwater infrastructure will be replaced and expanded to divert runoff from combined sewers to dedicated storm lines, with water quality treatment integrated into qualifying pavement replacements. The remaining slab of the C-14 building will be demolished and replaced with a mix of new parking spaces and green areas designed as pollinator habitats, potentially including a stormwater treatment facility. A new irrigation system will support the landscaping, which also extends to the median within the entry drive, and electric vehicle charging stations will be installed in the new parking zones. The project will enhance nonmotorized transportation by introducing a protected two-way bike lane linking the terminal to the existing West Wall bike path, improving pedestrian access to the intersection at 21st Ave W and W Emerson Pl, as well as the nearby King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pathways to ensure safety and visibility. Additional wayfinding signage will guide pedestrians and cyclists through the redeveloped space. The work is being managed by the Port of Seattle through its Waterfront Project Management office, with Mike Van Cleve and Terrence Moody serving as the primary point of contact and project manager respectively, under the NAICS code 237310 for sewer and water infrastructure construction. The project is forecasted with a posting date of July 24, 2026.
Waterfront Project Management

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities to be carried out across multiple sites within the Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric backing, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, various paint striping, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and upgrades to road drainage systems, some of which may require permitting. All tasks must be executed with precision and in compliance with applicable standards at Port of Seattle facilities. The contract is identified as a forecast for Asphalt Paving & Striping Portwide Unit Price 2026 under NAICS code 237310 and is managed by Port Construction Services under the Port of Seattle. Primary point of contact is Heather Bowden, reachable via email and phone, with Lesley Miles serving as the Project Manager. The solicitation is posted on the Port’s official portal, though no solicitation number has been assigned yet, and the anticipated performance period aligns with the 2026 fiscal timeline. The scope is unit-priced, indicating payment will be based on measured quantities of completed work rather than a fixed lump sum, and the work locations span the Port's operational footprint, requiring coordination across diverse and active areas.
Port Construction Services

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
Federal
MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine RoadThe solicitation for the MT FLAP BLACKF 12(1) & MT NP GLAC 12(2) project, identified by solicitation number 69056726B000005, seeks sealed bids for the rehabilitation of 7.22 miles of Two Medicine Road located four miles northwest of East Glacier Park, Montana. The scope includes full reconstruction of asphalt pavement, replacement of existing culverts, milling and overlay of two parking areas, and associated small work items such as erosion control, wetlands mitigation, drainage reconditioning, and new signage. The project is governed by the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, and requires the use of Masterworks for digital submittals and documentation. All bids must be submitted by the deadline of July 31, 2026, and are subject to Federal Acquisition Regulation provisions including 52.214-27 and 52.214-28 regarding certified cost or pricing data for modifications and subcontractors under sealed bidding. The offeror must maintain an active SAM registration, provide a Unique Entity Identifier and Taxpayer Identification Number, and comply with representations related to small business status, responsibility matters, and prohibitions on inverted domestic corporations. The evaluation for award is based solely on price, with a 10% evaluation preference applied to bids from HUBZone small business concerns, while HUBZone joint ventures must demonstrate that at least 40% of the work is performed by the HUBZone partner. The contract includes mandatory clauses covering assignment of claims, contractor quality control, performance of work, and labor standards compliance under the Davis-Bacon Act. The contractor must submit a detailed CPM schedule within five days of notice to proceed, demonstrating all activities tied to pay items and constrained to the fixed completion date of October 15, 2027. Key personnel requirements include a project manager, schedule manager, and superintendent who must attend regular meetings, while a dedicated Quality Control Manager with no operational duties must be appointed and alternated only with Contracting Officer approval. The contractor is responsible for providing performance and payment bonds, maintaining compliance with Buy American Act standards, and ensuring all subcontractors adhere to wage and labor regulations. Payment processing is conducted exclusively through the Department of Transportation’s DELPHI iSupplier system, requiring electronic submission via login.gov credentials renewed every 45 days, with detailed invoice requirements including CLIN breakdown
690567 Western Federal Lands Division

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
Federal
Z--GAOA SOUTH PRYOR ROADSThe Department of the Interior, Bureau of Land Management, Montana State Office, is seeking proposals under solicitation number 140L3626R0001 to restore approximately 13 miles of Gyp Springs and Helt Roads in Carbon County, Montana, under a Firm Fixed Price construction contract set aside exclusively for small businesses as defined by FAR 19.5. The work involves re-establishing the road’s typical section, grading, drainage, and structural integrity using crushed aggregate surfacing, earthwork including excavation and embankment, erosion and sediment control, seeding, and topsoil placement in strict accordance with detailed federal specifications and drawings that span 23 sheets covering general requirements, soil erosion control, earthwork, aggregate materials, and incidental construction. All work must comply with ASTM standards and prevailing industry practices, and contractors are required to perform independent testing through certified agencies, maintain continuous access to adjacent properties and trails, and protect cultural and natural resources, including monuments and surveyed boundaries. Contractors must submit proposals electronically by 1:00 p.m. Mountain Time on August 17, 2026, to the designated contracting officer email, and are explicitly prohibited from contacting any government personnel during the solicitation period. Full compliance with SAM registration is mandatory prior to proposal submission and award, and contractors must also register for the Treasury’s Invoice Processing Platform to enable electronic payment requests, with written waivers required for non-compliance. A site visit is strongly encouraged, and failure to inspect the site will preclude any post-award claims. Upon award, the contractor must submit a detailed construction schedule within 14 days of notice to proceed, and no work beyond mobilization may commence until approved. The contract includes lump sum line items for mobilization, surveying, sampling and testing, temporary traffic and erosion control, and seeding, while linear grading is billed per lineal foot. Payment is contingent on schedule approval, with no progress payments issued until then. Final acceptance is triggered by a formal inspection upon project completion, after which the contractor is relieved of maintenance responsibilities. All permits, including those related to the Stormwater Pollution Prevention Plan, must be obtained by the contractor if not already secured by the government, and all documentation must be submitted to the Contracting Officer and Contracting Officer’s Representative for oversight and compliance.
Montana State Office

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
Federal
Road Gate Replacements, Tully Lake, Royalston, MAThe U.S. Army Corps of Engineers - New England District is soliciting bids for the removal and replacement of ten single arm road gates at Tully Lake in Royalston, Massachusetts. The contractor is responsible for providing all labor, materials, and equipment necessary to complete this work in full compliance with the specified Statement of Work. This procurement is designated as a total small business set-aside under the Small Business Administration, with the NAICS code 237310 and a size standard of $45 million in annual revenue, limiting eligibility to qualified small businesses. All potential vendors must maintain an active registration in SAM.gov at the time of proposal submission; failure to do so will result in immediate rejection as nonresponsive. The solicitation, identified by number W912WJ26QA132, was posted on July 14, 2026, with a firm deadline for responses on July 28, 2026, at 9:00 PM Eastern Time. The work is to be performed at the Tully Lake project in Royalston, Massachusetts, and the contracting office is based in Concord, Massachusetts. Primary point of contact for inquiries is Alicia LaCrosse, reachable by phone at 978-318-8902 or via email at alicia.n.lacrosse@usace.army.mil. Interested parties must access the official solicitation through the provided SAM.gov link to obtain full details and submit proposals within the designated timeframe.
W2SD Endist New England

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
International
Ottawa River East Pathways (OREP) Rehabilitation ProjectThe National Capital Commission is soliciting proposals for the rehabilitation of the New Orchard Twin Bridge on the Kichi Zibi Mikan Parkway in Canada’s National Capital Region, a project aimed at extending the bridge’s operational life by at least 30 years through comprehensive structural and surface upgrades. The work includes partial depth concrete repairs on abutments, wing walls, bearing seats, soffits, fascia, deck, and deck ends; replacement of concrete curbs, sidewalks, and curtain walls; installation of crash-tested railings; replacement of the waterproofing system and asphalt pavements; replacement of bridge bearings and approach slabs; and repair of flagstone slope protection. Work must adhere to ASTM standards for steel pipe, zinc coatings, and stainless-steel tubing, as well as specific construction sections detailing selective demolition, cast-in-place concrete, metal fabrications, and earthwork. All materials must be delivered in original factory packaging with clear labeling identifying manufacturer details, type of coating, compliance standards, and color numbers; asbestos-containing materials must be contained in sealed metal or polyethylene bags with bilingual warning labels, and all materials must be stored off the ground in clean, dry, ventilated areas, protected from damage and replaced if defective. Proposals must be submitted by June 30, 2026, at 2:00 PM EDT via three separate encrypted emails to Bids-soumissions@ncc-ccn.ca, with mandatory submission documents, rated technical criteria, and pricing form delivered in distinct envelopes. All submissions must be in English or French, in PDF format, under 30 MB, printed on 8.5 x 11 inch paper, and use Arial 10pt, Calibri 11pt, or Times New Roman 12pt font, with numbering aligned to tender documents. Proponents must pass four non-negotiable gates: submission of the required form, pricing form, certificate of insurance verifying a minimum $5 million commercial general liability policy with NCC named as additional insured, and bonding verification. Technical evaluation is weighted at 70 points total, with 40 points allocated to approach and methodology and 30 points to the qualifications of the lead project manager and site superintendent; a minimum score of 70 is required to advance to financial evaluation, where the best evaluated price determines award. Key personnel must be assigned and meet experience criteria, and the proponent must hold a valid security clearance, designate a Company Security Representative to manage fingerprint submissions, and comply
National Capital Commission

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
Riverwalk, Phase IIIThe Town of Bridgewater is soliciting bids for the Riverwalk, Phase III project, which will extend the existing Riverwalk trail eastward from Edgebriar Park to Hatcher Drive, including the installation of a permeable paver shared-use path along a portion of the new alignment. This effort is funded through a Transportation Alternatives grant administered by the Virginia Department of Transportation, underscoring its role in enhancing non-motorized transportation infrastructure. The solicitation, identified as IFB-123330, was posted on June 29, 2026, and responses are due by July 30, 2026, with all work to be performed within Bridgewater, Virginia. The project is open to qualified contractors without set-aside restrictions and is managed by the Town of Bridgewater under the oversight of the Virginia state agency. Alex Wilmer serves as the point of contact for the solicitation, reachable via email at amwilmer@bridgewater.town or by phone at 540-908-4212. All relevant documentation and submission details can be accessed through the online portal linked in the posting. Contractors are expected to adhere to the technical and regulatory requirements associated with transportation-related infrastructure projects and must be prepared to deliver a durable, accessible, and environmentally responsible path that integrates seamlessly with existing public trails. The use of permeable pavers signifies an emphasis on sustainable stormwater management practices as part of the design and construction process.
Town of Bridgewater

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--KNRI 257081¿ Knife River Indian Village National HThe contract solicitation for Knife River Indian Village National Historic Site - Elbee Bend Bank Stabilization, identified as KNRI 257081 and solicitation number 140P2026R0086, seeks a contractor to execute riverbank stabilization work at a federally designated national historic site. The project requires comprehensive earthwork, riprap installation, erosion control, site restoration, and archaeological protection measures, all governed by strict construction specifications and environmental compliance protocols. The scope includes clearing and grubbing, excavation support, drainage installation, topsoil application, seeding, and the construction of temporary access roads and river crossings as bid alternates. The work must adhere to federal standards, utilize materials with high recycled content as defined by ASTM and EPA guidelines, and follow sustainability requirements emphasizing minimal packaging and recyclable materials. Proposals must be submitted via email by August 6, 2026, in two electronic volumes addressing technical approach, project and personnel experience, management systems, past performance, and small business participation, with separate pricing documents in compliance with FAR requirements. The evaluation follows a best value continuum tradeoff process where technical merit and price are approximately equally weighted, favoring balanced, well-documented proposals that demonstrate realistic scheduling, risk mitigation, and qualified key personnel including a project manager, safety manager, and quality control manager. The contract imposes stringent administrative conditions, including mandatory use of the Invoice Processing Platform (IPP) for payment requests, with draft invoices required seven days in advance and a signed COR cover letter needed for final submission. Failure to receive the cover letter within seven days allows submission with the draft review email to meet Prompt Payment Act timelines. Contractors must have an active SAM registration with a Unique Entity ID and provide full representations regarding small business status, WOSB eligibility, and joint venture structure if applicable. The project must commence within ten days of notice to proceed and be completed within 365 days, with liquidated damages enforceable for delays and suspension of work governed by applicable FAR clauses. All materials require manufacturer certification, ISO 9000 compliance, or an equivalent inspection system, with off-site components subject to pre-fabrication inspection. The contracting officer holds sole authority to modify terms, while a designated Contracting Officer’s Representative will handle technical oversight. Performance is tied to detailed geotechnical recommendations, permit conditions, and archaeological protection protocols, ensuring preservation of cultural resources while achieving durable bank stabilization. Subcontractor payments must be certified, final payment requires a DI-13
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
Federal
Y--HAFE 242454, Pavement Preservation Project The Department of the Interior’s National Park Service, through its Denver Service Center’s Contracting Services Division, is conducting market research for a pavement preservation project at Harpers Ferry National Historical Park in West Virginia under solicitation number HAFE 242454. This effort is a Sources Sought Notice, not a solicitation for proposals, and is intended to gather information from small businesses to shape a future procurement. The project scope involves comprehensive road and bridge preservation services including asphalt pavement treatments such as street sweeping, crack sealing, chip sealing, surface sealing, and deep patching, along with pavement marking removal and installation, drainage improvements, earthwork, traffic control, and tree protection. Work must be carefully scheduled between 9:00 a.m. and 3:30 p.m. with no more than one lane closed at a time to minimize disruption to park visitors, and seasonal closures will be enforced. Protective measures are required to preserve the historical and natural environment. The estimated contract value ranges from $1 million to $5 million, and the anticipated performance period is 140 calendar days, accounting for weather-related delays. The acquisition is structured as a total small business set-aside under NAICS code 237310, with a small business size standard of $45 million in annual revenue. Interested firms must submit their company information, including UEI number, point of contact, business size status, bonding capacity statement, and evidence of relevant past experience on similar projects by May 8, 2026, via email to Contracting Officer Rachel Dyer. Formal performance and payment bonds will be required upon contract award, but not at this stage. A formal request for proposals is expected to be issued in late summer or fall of 2026, at which time detailed specifications, evaluation criteria, and submission guidelines will be provided.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
Federal
Y--DEWA 310424 - Safety and Pavement Improvements to The contract pertains to safety and pavement improvements along Route 209 and McDade Trail within the Delaware Water Gap National Recreation Area, identified by PMIS numbers 310424, 325752, and 324741, with an estimated value exceeding $10 million and a performance period of 544 calendar days following the notice to proceed. The scope encompasses pavement preservation, slope stabilization using percussion-driven earth anchors, culvert repairs, guardrail replacement with Natina-coated materials, boardwalk construction featuring steel H-piles and concrete structures, erosion and sedimentation control, stormwater management via HDPE piping and regenerative conveyance systems, and installation of wayfinding signage not compliant with MUTCD standards. The project requires strict adherence to construction standards across multiple divisions including earthwork, concrete, transportation, utilities, and pollution control, with all work subject to visual inspection and testing per AASHTO, ASTM, or designated agency procedures, and results must be reported to the Contracting Officer within 24 hours of sampling. The solicitation is structured as a negotiated Request for Proposal under FAR Part 15, utilizing the Best Value Continuum Tradeoff Process, where non-price factors—project experience, technical approach, key personnel, and other criteria—are significantly more important than price, and the government may select a higher-priced proposal based on superior technical merit. All proposals must be submitted via email to specified NPS addresses with strict formatting rules, including separate technical and business volumes with specific naming conventions and file size limits not exceeding 38 MB per attachment or 100 MB per email. Compliance with SAM registration, UEI, and small business representation requirements is mandatory, with the procurement designated as a Small Business Set-Aside. Key personnel including a Project Manager, Safety Manager, Environmental Specialist, and others must be assigned with restrictions on substitutions during the first 30 days of performance. The contractor is required to use the Invoice Processing Platform (IPP) for payment submissions, following a two-step process requiring a draft package sent to the COR and CMR at least seven days in advance, with final invoice upload contingent upon a signed cover letter, or alternatively upon confirmation of the draft email if the letter is not received within the timeframe. Materials must be delivered undamaged in original manufacturer packaging with full labeling, including lot numbers, expiration dates, and safety information for pavement marking products, and must utilize biodegradable or recyclable packaging to the greatest extent possible. The
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Federal
Y--GRCA 318719_Temporary WWTP at North RimThe U.S. Department of the Interior, through its Denver Service Center Contracting Services Division, is preparing to procure the installation of a temporary wastewater treatment plant at the North Rim of Grand Canyon National Park under solicitation number 140P2026R0075. This project, identified as GRCA 318719, is designed to provide interim wastewater treatment capacity for campgrounds and visitor facilities while the permanent system undergoes upgrades. The work is to be performed at the North Rim, Arizona, a remote, high-elevation location with seasonal access limited to May through October and restricted road and staging areas. The facility must meet effluent standards set by the Arizona Department of Environmental Quality and will be constructed without requiring helicopter transport of materials or equipment. The estimated contract value exceeds $10 million, with a projected performance period of 420 calendar days following notice to proceed. The requirement is currently unfunded but has a high expectation of future funding availability. This procurement is structured as a total small business set aside under NAICS code 237110, which carries a size standard of $45 million in annual revenue, with the government actively seeking to maximize participation by small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses. Prospective offerors must hold an active registration in the System for Award Management and possess a DUNS number to be eligible. The solicitation is scheduled to be issued in June 2026, with proposals due by July 29, 2026. While the pre-solicitation notice outlines the overall scope, performance requirements, and set-aside status, detailed specifications, drawings, evaluation criteria, contract clauses, and submission instructions will be provided in the official solicitation documents, which have not yet been released. All award-related information and contract administration details remain pending the formal release of the solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
SC Multi Parks (CONG, COWP, KIMO, NISI) - PavementThe Department of the Interior, through its DSC Contracting Services Division, is conducting market research for a pavement preservation project encompassing four national park sites in South Carolina: Congeree National Park, Cowpens National Battlefield, Kings Mountain National Military Park, and Ninety Six National Historic Site. This presolicitation action, identified by solicitation number 140P2026R0054 and classified under NAICS code 237310, aims to gather industry input to determine the feasibility of a potential small business or socio-economic set-aside and to inform the structure of a future competitive Request for Proposals expected to be issued in fall 2026. The project will involve pavement preservation activities across 11.48 roadway miles and 0.71 parking miles, with the goal of extending pavement life and deferring more costly rehabilitation. The anticipated contract, if solicited, will be awarded as a Firm-Fixed-Price (FFP) with an estimated performance period of 132 calendar days following the Notice to Proceed, inclusive of weather-related delays. Critical performance constraints require that all parks remain fully operational during construction, with particular emphasis on maintaining public access to roads and parking areas during the week of July 4th. Construction at Kings Mountain National Military Park must conclude before October 1, while no work is permitted at Congeree National Park during the Synchronized Firefly Festival (mid-May to early-June) or between October 15 and 18. Winter construction may be necessary, and staging areas are limited, requiring approval from the Contracting Officer’s Representative. Bonding and insurance requirements are anticipated to include bid, performance, and payment bonds. Respondents are asked to provide company details including UEI, contact information, and socio-economic certifications such as HUBZone, WOSB, SDVOSB, or other veteran- or Native American-owned business status to assist the government in determining appropriate set-aside options. No technical specifications, drawings, or formal proposal packages are available at this stage, as this is strictly a market research tool with no proposals being accepted.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details