Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of The Interior was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--GRCA 318719, Construct Temporary Wastewater Treatment Plant at North Rim, Grand

Closed
Federal
Submission Closed
Solicitation #
140P2026R0046

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an invitation to bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A (Contract K-27-2470-DBB-3-C) for the City of San Diego. This project is funded by CASRF and the EPA and is subject to a Project Labor Agreement. The scope of work encompasses a wide range of civil and infrastructure services, including aggregate and pipe supply, asphalt paving, electrical work, fencing, geotextile supply, hydroseding, landscape and irrigation, minor concrete, QC testing, ready mix concrete supply, street sweeping, striping, survey, and water truck services. The contract is set aside for SBA certified Women-Owned Small Businesses (WOSB) and Disadvantaged Business Enterprises (DBE) through the Department of Transportation. Subcontractors must possess a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. Bids must remain valid for 120 days from the submission date. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100% of the contract value, with bond premium reimbursement capped at 3%. Interested parties should submit quotes via email to Veronica Garcia at [email hidden] or via fax. The response deadline is December 3, 2026.
Flatiron Dragados Constructors, Inc.

POSTED

about 2 hours ago

DEADLINE

in 6 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstsources-sought
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 8 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA

Full Description

Show more
GRCA 318719, Construct Temporary Wastewater Treatment Plant at North Rim, Grand Canyon National Park

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price procurement for the rehabilitation of the Rainshed and Water Treatment System at Hawaii Volcanoes National Park in Volcano, Hawaii. The project scope includes the rehabilitation of the park's rainwater catchment system, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air structure and CMU building. Additional optional components include the replacement of the 241 SAR Building, improvements to the water treatment system, replacement of the perimeter fence, and replacement of ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with a requirement to begin work within 10 days of award. The government will utilize a best value continuum tradeoff process to select a contractor, evaluating technical and management capabilities, past performance, and price. Key technical requirements include adherence to Davis-Bacon Act wage determinations, NETA Level II ETT certified electrical testing, and strict hydrostatic testing for wastewater treatment. The contractor is responsible for the procurement and placement of temporary storage containers, while the National Park Service handles the inventory and relocation of contents. This procurement is designated as no set-aside. Bid, performance, and payment bonds are required, and all payment requests must be processed electronically through the Invoice Processing Platform System.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted, full and open competition for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the installation of a new GD Membrane Bio-Reactor treatment facility with a capacity of 0-65 million gallons per day, including the construction of administrative and support buildings, process systems, and improvements to the facility access road. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, and a 12-month operational support period following construction. The project is estimated to have a construction magnitude exceeding $100 million. The period of performance is scheduled from February 1, 2027, to February 1, 2030, with a total duration of 1095 calendar days after the notice to proceed. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and past performance, with non-price factors being approximately equal in importance to price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Specialist, Safety Specialist, and Historic Preservation Treatment Specialist. The contract requires performance and payment bonds, adherence to union prevailing wage rates, and compliance with Department of the Interior cybersecurity and accessibility standards.
Sewage Treatment Facilities

POSTED

10 days ago

DEADLINE

in 22 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS