Y--HI-MIDWAY ATOLL NWR-SEWER SYS-REPAIRS
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Fish and Wildlife Service is conducting market research to gather industry input for a future design-build contract to repair and replace critical infrastructure at Midway Atoll National Wildlife Refuge, with a primary focus on the aging sanitary sewer system and harbor facilities. The project, estimated to exceed $10 million, will be awarded as a Firm Fixed Price contract under NAICS code 237990, with a small business size standard of $45 million. The sewer system replacement, based on 100% design documents, is the top priority with a 730-day performance period from Notice to Proceed, followed by a longer 1,825-day period for harbor infrastructure repairs including the tug pier, harbor seawall, finger piers, and south seawall, which are designated as options. All construction activities are tightly constrained by environmental protections: terrestrial work is restricted to July 15 through October 31 annually to avoid disturbing nesting albatrosses, and material deliveries are limited to May 30 through November 15. The contractor must be fully self-sufficient, transporting all personnel, equipment, and materials to the remote atoll without reliance on government-provided utilities, fuel, or lodging, and must comply with stringent biosecurity protocols to prevent the introduction of invasive species. Performance is on-site at Midway Atoll, with no government support for logistics, and contractors must coordinate closely with refuge management for scheduling and cultural resource protection. Submissions for this sources sought notice must include company details, business size and socioeconomic certifications, capability statements, CAGE and UEI codes, joint venture information if applicable, and a clear statement of interest in future proposals, all submitted via email by 3:00 PM PT on May 18, 2026, with the specified reference number and project title in the subject line. The notice explicitly states no proposals are being accepted and no contract will result from this action; it is purely for market research to inform the development of a future solicitation.
General Info
Agency
NAICS
Place of Performance
VASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This is a Sources Sought Notice for the purpose of conducting market research and obtaining industry information ONLY. Proposals are NOT being requested, nor accepted at this time. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2 and no contract shall be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow-up information requests. No Solicitation is currently available. The purpose of this notice is to obtain information from businesses that are interested and capable of providing the types of services noted below. The United States Fish and Wildlife Service (USFWS) will use information obtained through this notice as well as other market research to develop an acquisition strategy.
A. SUMMARY OF REQUIREMENT (REFER TO ATTACHMENTS FOR FURTHER INFORMATION):
The USFWS anticipates soliciting and awarding one Firm Fixed Price (FFP) contract for design build services to complete needed improvements to the sanitary sewer system and to harbor infrastructure at Midway Atoll National Wildlife Refuge (NWR). Much of the island¿s infrastructure was built in the World War II era and is well beyond its useful life. The US Fish and Wildlife Service (Service) operates and maintains the NWR as well as Henderson Airfield with Service staff and contractor staff residing on the island year-round. To maintain operations and keep staff on-island, significant repairs to the sewer system and inner harbor are needed.
The scope of this effort includes replacement of major components of the existing sewer system including piping, lift stations, manholes, etc.as well as other associated work. It also includes planning, design, permitting, and construction activities to repair or replace infrastructure within the inner harbor and the south seawall.
The objectives of this project are to repair infrastructure on Midway Atoll NWR that are critical to continued operations. This project has three main objectives, listed below in order of priority:
1. Replacement of sewer system per 100% design documents.
2. Design Build: Replace or repair critical harbor infrastructure to allow for continued harbor operations.
a. Tug Pier (Base)
b. Harbor Seawall (Option)
c. Finger Piers (small vessel docks; Option)
3. Repair South Seawall (Option)
The period of performance for Task 1, Replacement of Sewer System is 730 days from the Notice to Proceed (NTP). The period of performance for NEPA documents and compliance is 730 days from the NTP. The period of performance for all other tasks is 1,825 days from the NTP.
The magnitude of the construction project is more than $10,000,000.
The primary North American Industry Classification System (NAICS) code will be 237990 - Other Heavy and Civil Engineering Construction. The small business size standard is $45.0 million.
B. SOURCES SOUGHT RESPONSE REQUIREMENTS
All business categories are invited to respond.
Response Information: Interested firms should submit a capabilities package and include the following:
1) Firm's name, address (mailing and URL), point of contact, phone number, email address, business category, business size, and business type.
2) Business classification: i.e. Large Business, Small Business (SB), Indian Small Business Economic Enterprise (ISBEE), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone (HUBZone), Small Business, 8(a) Program, or Other.
3) Provide information of your qualifications, capabilities and ability to perform the required type of work at Midway Atoll National Wildlife Refuge (NWR).
4) Responders should demonstrate they have the capacity to perform the work as described in this synopsis, either by their in-house capabilities or through their teaming and/or subcontractors capabilities.
5) Cage code and UEI number of your firm.
6) Firm's Joint Venture Information (if applicable).
7) Statement that your firm is interested in submitting a proposal for this project if it is formally advertised.
Responses to this Sources Sought will only be shared with the Government project team and held in strict confidence.
RESPONSE DATE/TIME: No later than 3:00 PM PT, May 18, 2026
EMAIL RESPONSES TO: Shanen Fox at shanen_fox@ios.doi.gov. Include the reference number (140FGA26R0020) and title of project (Midway Consolidated Sewer Sys and Harbor Repairs) in the subject line of your email.
More opportunities from Department Of The Interior → Gaoa Fws
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS