Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Z--Hungry Horse Excitation System Replacement

Awarded
140R1025B0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bureau of Reclamation, Pacific Northwest Region, is soliciting bids for the replacement of the excitation system at the Hungry Horse Powerplant in Montana under solicitation 140R1025B0003. This project is set aside 100 percent for small businesses under NAICS 237990, with an estimated magnitude between 5 million and 15 million dollars. The scope of work includes the construction, installation, testing, and training for the replacement of excitation systems for four generators (G1 through G4), as well as mobilization, preparatory work, and the use of a Contract Document Management System. The project requires strict adherence to safety and technical standards, including NFPA 70, IEEE C37.2, and OSHA construction safety standards. Bids are submitted as sealed proposals, with the award based on a price reasonableness determination, typically following Lowest-Price Technically Acceptable procedures. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Performance involves significant security obligations, including mandatory personnel suitability screenings, government-issued identification, and protection of Controlled Unclassified Information. Invoicing is processed exclusively through the Invoice Processing Platform, and contractor performance will be tracked via the Contractor Performance Assessment Reporting System. Inspection may occur at the point of manufacture or the jobsite, but final acceptance of materials is conducted only at the jobsite following successful installation and testing.

General Info

Contract Value

$8,914,411

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Hungry Horse, ID, USA

Set-Aside

NONE

Award Issued Date

Documents

16

Amendment 0001 to Solicitation 140R1025B0003

PDF, High priority: read this first1 page · amendment
High

Amendment 0002 to Solicitation 140R1025B0003

PDF, High priority: read this first1 page · amendment
High

Amendment 0003 to Solicitation 140R1025B0003

PDF, High priority: read this first1 page · amendment
High

Amendment 0004 to Solicitation 140R1025B0003

PDF, High priority: read this first1 page · amendment
High

Amendment 0005 to Solicitation 140R1025B0003

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140R1025B0003

PDF, High priority: read this firstamendment
High

Clause 52.228-1 Bid Guarantee for Solicitation 140R1025B0003

PDF, High priority: read this first2 pages · clause
High

Clause 52.228-1 Bid Guarantee Instructions

PDF, High priority: read this first1 page · sow
High

FAR 52.214-5 Submission of Bids Clause

PDF, High priority: read this firstsow
High

Hungry Horse Excitation System Q&A Log Government Answers

PDF, High priority: read this first7 pages · q-and-a
High

Hungry Horse Excitation System Replacement Amendment P00004

PDF, High priority: read this first121 pages · amendment
High

Hungry Horse Excitation System Replacement Solicitation 140R1025B0003

PDF, High priority: read this first504 pages · rfp
High

Solicitation 140R1025B0003 Hungry Horse Excitation System Replacement

PDF, High priority: read this first4 pages · ifb
High

Hungry Horse Excitation Q&A Log and Photos

PDF, Low priorityq-and-a
Low

Hungry Horse Excitation Q&A Log and Photos

PDF, Low priorityq-and-a
Low

Pre-bid Site Visit Sign-in Sheet for Solicitation 140R1025B0003

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pacific Nw Region Pn 6615
Contacts1 person available
OfficeBOISE, ID, 83706, USA
Office AddressBOISE, ID, 83706, USA

Full Description

Show more
Hungry Horse Excitation System Replacement, Hungry Horse Powerplant, Montana

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio. With an engineer's estimate of $4,973,490.39, the project focuses on essential infrastructure including roadway extensions, sanitary sewer and water main installation, and comprehensive site electrical work. The electrical scope is a design-build effort encompassing the installation of light poles, fused and non-fused connector kits, and weather-resistant GFI receptacles. Civil requirements include the construction of concrete drive aprons with aggregate bases, pavement markings, and the installation of an irrigation system. All work must adhere to ODOT specifications, the Ohio Building Code, and NFPA Standard 70. This is a unit price contract awarded to the lowest and best bidder, with a project completion deadline of September 30, 2027. Bidders must submit proposals electronically via Bid Express, including a bid bond for the full amount or a 10% certified check. The successful contractor is required to provide a 100% performance bond and maintain liability insurance limits of $2,000,000 per occurrence for CGL and $1,000,000 for auto and workers compensation. Payment is structured as one partial payment per month, subject to a 6% retainer and the submission of certified payroll reports to ensure compliance with Ohio Prevailing Wage laws. Final acceptance is determined by the City and its Construction Manager, Oberer Construction Managers Ltd.
City of Centerville

POSTED

2 days ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of The Interior → Pacific Nw Region Pn 6615

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS