This Solicitation opportunity from Department Of The Interior was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--LAKE - EXTEND RAMP AT PEARCE FERRY

Awarded
140P8126B0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Department of the Interior, through the National Park Service’s PWR-LAKE MABO office in Boulder City, Nevada, is soliciting sealed bids for the extension and reconstruction of the boat launch ramp at Pearce Ferry within Lake Mead National Recreation Area, Arizona, under solicitation number 140P8126B0007. This is a Firm Fixed Price contract awarded as a Total Small Business Set-Aside under NAICS code 237990, requiring all bidders to be active in SAM with a valid UEI and CAGE code, and to represent their size status accurately for this code. The project involves resetting 1,800 square feet of precast concrete panels to extend the existing ramp 55 feet toward the Colorado River, widening it by 40 feet, and constructing an 8,400 square foot concrete staging area at the top of the ramp. Additional work includes removing and reusing 66 existing precast panels, hauling away the existing pipe mat, and performing site preparation, excavation, grading, aggregate base placement, cast-in-place concrete work, riprap installation, ditching, and installing 4-inch leveling pipe. Bidders must verify all existing site conditions prior to pricing and adhere to strict environmental and noise mitigation standards to preserve the park’s soundscape. The government will furnish certain items, but the contractor is responsible for receiving, unloading, and handling them, with deliveries scheduled to avoid overcrowding and long-term storage. The contract mandates compliance with extensive regulatory requirements including the Copeland Act, Buy American provisions, and prevailing wage rates as outlined in Wage Determination AZ20260058, with enforcement through 29 CFR Part 3. The contractor must furnish both a bid bond and, upon award, performance and payment bonds in accordance with the Miller Act, maintaining security until the warranty period ends or one year after final payment, whichever is later. All work must meet OSHA standards, comply with NFPA 241 for construction safeguarding, and include PPE requirements for all personnel and visitors, with at least six hard hats provided for public use. The contractor must maintain on-site MSDS for all hazardous materials, report spills immediately, and ensure employees are trained in first aid and hazardous material handling. The period of performance is 85 calendar days from the Notice to Proceed, with full completion including final cleanup required within 150 days. The project will be managed under

General Info

Contract for extending Pearce Ferry boat ramp, including excavation, concrete, and riprap, small business set-aside.

Contract Value

$1,477,860

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NV, USA

Set-Aside

SBA

Award Issued Date

Documents

8

Amendment 0001 to Solicitation 140P8126B0007

PDF, High priority: read this firstamendment
High

IFB 140P8126B0007 - LAKE Extend Ramp at Pearce Ferry

PDF, High priority: read this firstifb
High

Limitation on Subcontracting Report Template v1 Dec 15 2016

XLSX, High priority: read this first6 pages · template
High

Pearce Ferry Takeout Ramp Plans - Civil Engineering Drawings

PDF, High priority: read this firstspecifications
High

Pearce Ferry Takeout Ramp Project Specifications August 2023

PDF, High priority: read this firstspecifications
High

Wage Determination AZ20260058 for Heavy Construction in Mohave County, AZ

PDF, High priority: read this firstwage-determination
High

Wage Determination AZ20260058 for Mohave County, Arizona Heavy Construction

PDF, High priority: read this firstwage-determination
High

Construction Contract Administration Guidance

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr LAME(81000)
Contacts1 person available
OfficeBOULDER CITY, NV, 89005, USA
Office AddressBOULDER CITY, NV, 89005, USA
Contacts

Full Description

Show more
LAKE - EXTEND RAMP AT PEARCE FERRY

More opportunities from Department Of The Interior → Pwr LAME(81000)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS