This Government Contract opportunity from Department Of Defense was posted on September 22, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Lower Monumental JBS Outfall Pipe Relocation

Awarded
W912EF-11-R-0024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 12 hours ago

DEADLINE

in 25 days

General Info

Contract Value

$7,507,395

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

WA

Set-Aside

NONE

Award Issued Date

Documents

12
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecial-notice
High
PDF, Low prioritysite-visit-log
Low
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 9, 2011 to Aug 11, 2011. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 11, 2011 to Aug 13, 2011. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 13, 2011 to Aug 19, 2011.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
ContactsNo contacts available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
ContactsNo contact information available

Full Description

Show more
Project objective is to improve survival of bypassed fish returned to the river by relocating the juvenile bypass outfall pipe to a location with improved hydraulic conditions and thus reducing predation opportunity. Generally, the project will consist of connecting a 36" pipe (variable materials) to the existing bypass system line and extending it approximately 2100' downstream and 500' into the river. There are several connections and rerouting required. A good portion of the pipe will be buried HDPE, but some portion will be supported steel pipe over ground and over water. Specifically, work consists of replacing or extending the following; a primary 36 inch pipe for fish by-passed around the Juvenile Fish Facility (JFF), a 12 inch pipe connection to the 36 inch primary line for fish routed through the facility and released back to the river, a 16 inch adult line connection to the 36 inch primary line at the facility, and a 24 inch supply line connection, again to the 36 inch primary pipe, near the facility. Structural support of the pipe system includes the following: 1. Support approximately 200 feet at an average elevation of approximately 15 feet above grade of the 36 inch primary diversion steel pipe filled with water for fish transport. These supports will be a combination of some new steel structures and some existing structure. Steel supports for the 36 inch line will occur at approximately 50 feet on center. The supports will be founded on concrete footings. Shallow excavations will be required to set the concrete footings. 2. The Steel pipe will transition to buried HDPE. Support of a 36 inch diameter HDPE pipe for a distance of approximately 2400 feet by burial at a base of pipe elevation averaging 8 feet below grade. In some instances the pipe is at 0 ft deep and will require earthen berms. Excavation, backfill, compaction, grade preparation and laying of the pipe will meet Corps criteria and specifications. 3. The Primary line will transition back to a 36" steel pipe, turn 90 degrees and route toward the river. Support of the 36" inch diameter steel pipe will be approximately 500 feet over water on steel supports. The steel supports will consist of single, cased, reinforced concrete shafts - spaced approximately 50 - 55 feet on center. Each shaft will be on average 80' long and extend to bedrock. Initially, the 48 inch diameter steel casings will be drilled through a silt layer and driven to a depth of ten feet into the bedrock. Drilling will proceed approximately ten feet beyond the base of the casing. A rebar cage will be placed down into the casing. Tremie concrete will be placed into the casing from the base of the hole drilled into the bedrock continuing all the way up, filling the voids within the rebar cage and between the cage and the wall of the casing. 4. In addition to the Primary 36 inch line the work will require supports for 520 feet of a 12-inch pvc pipe connection to the 36 inch primary line for fish routed through the facility and released back to the river. Steel supports for the 12 inch line will occur at approximately 50 feet on center. The supports will be founded on concrete footings. Shallow excavations will be required to set the concrete footings. 5. An existing 14 inch adult fish line at the facility will be replaced with a 16 inch adult fish line and will require no additional supports 6. Finally, approximately 200 feet of a 24-inch supply line will be rerouted and connected to the 36 inch primary outfall. Steel supports for the 24 inch line will occur at approximately 50 feet on center. The supports will be founded on concrete footings. Shallow excavations will be required to set the concrete footings. General: 1. The total length of pipe is approximately 3100 feet. The pipe must closely follow a defined slope and horizontal alignment from the tie-in points at the Juvenile Fish Facility to the outfall point some 500 feet from shore. 2. All pipes supported above grade will have ring girder type saddle supports. Expansion joints will be provided in the piping and thermal forces will be accommodated in the structures. 3. All structural steel will meet Corps criteria and AISC guidelines, specifications and standard practices. Shop drawings will be required. 4. All concrete work will meet Corps criteria and ACI guidelines, specifications and standard practices. Reinforcing shop drawings will be required. 5. All welding shall be done by certified welders meeting AWS D1.1 and Corps criteria. 6. All piling will meet Corps criteria and specifications. 7. Location of all existing structures and utilities which may be affected by the work will be verified by the contractor. All known information on these items will be supplied by the Corps. 8. Existing sod and irrigation lines impacted by pipeline installation will be repaired to restore Lower Monumental Dam Park area to conditions similar to pre-construction conditions. 9. The construction period is anticipated to begin in October 2011. The contract will contain strict schedule requirements to complete the work by March 2012. Work conditions include elevated work and work over water. Work will probably also require support of a barge-mounted crane. Contractor must have a past performance history of work similar to the work required. 10. Contractor is required to follow the procedures in the Army Corps of Engineers Safety Manual, at http://www.usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf Solicitation No. W912EF-11-R-0024 will be posted to the FBO website on or about July 8, 2011. Proposals will be due no sooner than 30 calendar days after actual solicitation issuance date. The proposal due date will be contained in the solicitation and any solicitation amendments that may be issued. A site visit will be offered approximately two weeks after the solicitation is made available to offerors. See solicitation for details about the site visit. Solicitation is open to both Large and small business concerns. NAICS code for this project is 237990, and the small business size standard is $33,500,000 average annual receipts. Estimated magnitude of construction is between $5,000,000 and $10,000,000. When available, the solicitation documents for this project will be posted on FedBizOpps.gov https://www.fbo.gov. Important Note: The FedBizOpps Response Date listed elsewhere in this synopsis is for FedBizOpps archive purposes only. It has no relationship to the actual bid opening date. NO CDs OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the referenced site for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to FedBizOpps.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on FedBizOpps.gov.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332312
New
Federal
Lower Monumental Diffuser Grating
Solicitation # W912EF27QA011
Solicitation W912EF27QA011 is a firm fixed price contract issued by the US Army Engineer District Walla Walla for the procurement of materials for the Lower Monumental Adult Collection Channel N Entrance Diffuser Grating. This total small business set-aside requires the supply and delivery of aluminum grating, structural steel I-beams and angles, various fasteners, and isolation kits to the Lower Monumental Lock and Dam in Kahlotus, Washington. All materials must be new and meet specific technical standards, including ASTM requirements for tensile strength and water absorption, and ACI standards for anchor design and testing. The delivery deadline is January 8, 2027, with the contractor responsible for all transportation costs under FOB Destination terms. The contract emphasizes strict adherence to quality control and marking standards, requiring items to be identified per MIL-STD-130 and shipments labeled according to MIL-STD-129. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Evaluation of offers will be conducted in accordance with DFARS Part 225 regarding Buy American compliance. Additionally, the contractor must comply with USACE EM 385-1-1 safety manuals and cybersecurity regulations under DFARS 252.204-7012. Inspection and acceptance will occur at the destination in Kahlotus, Washington.
Fabricated Structural Metal Manufacturing

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

9 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS