Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Y--MI-SENEY NWR-DC DAM DECOMMISIONING

Awarded
140FGA26R0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the decommissioning of the Delta Creek Pool Low Hazard Dam and associated Driggs River Culverts at the Seney National Wildlife Refuge in Michigan, under the authority of the U.S. Department of the Interior’s Fish and Wildlife Service. The procurement is administered as a Total Small Business Set-Aside under NAICS Code 237990, with all proposals required to be submitted electronically by June 30, 2026, at 0800 EST to the designated point of contact. The work must commence within ten calendar days of receiving notice to proceed and be completed within 180 calendar days, with a specific performance window for the dam decommissioning set from July 29, 2026, to January 25, 2027. The contractor is responsible for furnishing all labor, materials, equipment, and supervision necessary to execute the project in full compliance with the Project Manual (93 pages), engineering drawings (17 pages), and wage rate determinations (7 pages), with specifications taking precedence over drawings in the event of conflict. All work must adhere to OSHA standards, including 29 CFR 1910, 1926, and 1928, and comply with the Copeland Act, Davis-Bacon Act, and Buy American provisions for construction materials. Earth slopes must be cut at a 3:1 ratio or flatter unless otherwise specified, and the contractor must verify the exact location of all utilities on site. The contract imposes strict requirements for quality control, testing, and documentation, with the contractor bearing full responsibility for performing and paying for all Quality Control testing, submitting material and equipment test reports, gradation tests, and visual inspection records. Final acceptance requires a written request for inspection at least ten days prior to anticipated completion, with the contractor’s project supervisor present during the inspection. All installed equipment must undergo operational testing to ensure compliance, and final payment is contingent upon submission of corrected red-lined drawings, full test reports, warranties, certificates, and a Contractor’s Release of Claims. A 100% warranty covering one full year post-final acceptance is mandatory. Invoicing must be submitted electronically through the U.S. Treasury’s Invoice Processing Platform, requiring certified payrolls, line-item details, and narrative progress summaries for lump-sum billing; final invoices must be explicitly marked “FINAL.” Bonding requirements include Performance and Payment Bonds, and compliance with labor laws such as equal opportunity

General Info

Decommission Delta Creek Dam contract, small business set aside, $500K-$1M, 180-day completion.

Contract Value

$902,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Amendment 0001 to Solicitation 140FGA26R0021

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140FGA26R0021

PDF, High priority: read this firstamendment
High

Solicitation 140FGA26R0021 for Delta Creek Dam Decommissioning

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from Jul 6, 2026 to Jul 13, 2026.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA
Contacts

Full Description

Show more
The U.S. Fish and Wildlife Service has a requirement for the Decommissioning of the Delta Creek Dam located at the Seney National Wildlife Refuge, Seney, Michigan. This requirement will be conducted in accordance with FAR Part 15, Contracting by Negotiation. The resulting award will be a Firm-Fixed-Price contract, with selection made using a best value trade-off evaluation method. This requirement is set aside for Total Small Business concerns.

The complete Solicitation will be posted on www.sam.gov under Contract Opportunities on or about June 3, 2026.

Interested contractors must be actively registered in the System for Award Management (SAM) at www.sam.gov and must have current Online Representations and Certifications.
A preproposal site visit will be announced in the Solicitation, along with all required instructions for participation.

The applicable NAICS code is 237990 ¿ Other Heavy and Civil Engineering Construction, with a small business size standard of $45.0 million. The estimated magnitude of this project is between $500,000 and $1,000,000.
Work shall commence within 15 calendar days after issuance of the Notice to Proceed and shall be completed within 180 calendar days.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of The Interior → Gaoa Fws

Same awarding agency

NAICS: 238160
Federal
Standing Seam Metal Roof InstallationThe contract entails the supply and installation of a new standing seam metal roof system, complete with all necessary underlayment, flashing, fasteners, and accessories, all to be executed in strict compliance with the manufacturer’s specifications. This work is structured as a subcontract under NAICS code 238160 and is associated with the Department of the Interior, through its agency Gaoa Fws, with the solicitation posted on May 6, 2026. The project requires full adherence to technical standards for durability, weather resistance, and longevity, ensuring the roof system meets industry best practices and performance benchmarks. All materials and labor must align with the defined scope without deviation, and the installation must be performed by qualified personnel familiar with standing seam systems. The place of performance and specific location are not detailed in the provided data, nor are there details on the point of contact, set-aside status, or funding source. The contract is not linked to a specific solicitation number and lacks address information for the agency or performace site. Despite these gaps, the focus remains on delivering a high-quality, code-compliant metal roofing solution designed for long-term structural integrity and environmental resilience. Contractors must be prepared to meet all manufacturer requirements and assume responsibility for inspection, testing, and documentation to validate compliance throughout the installation process.
Roofing Contractors

POSTED

6 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS