10--Miami Harbor Construction Dredging Phase 3, 50-Foot Project, Cut-1, Cut-2, Cut-3, Fisher Island Turning Basin, Fisherman's Channel, Lummis Island Turning Basin and Local Sponsor Berthing Areas, Miami-Dade County

Awarded
W912EP-12-R-0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project involves Phase 3 construction dredging for the Miami Harbor in Florida to improve Federally authorized project areas and Local Sponsor Berthing Areas. The scope includes dredging seven specific features, including Cut-1, Cut-2, Cut-3, the Fisher Island Turning Basin, Fisherman's Channel, the Lummus Island Turning Basin, and Port of Miami Berthing Areas, to depths ranging from 50 to 52 feet MLLW. Approximately 5 million cubic yards will be removed from the Federal Channel and 200,000 cubic yards from the Berthing Areas, with materials placed in designated offshore disposal sites, seagrass mitigation areas, and artificial reef areas. The contract is structured with a Base award and two optional items, covering different dredging reaches and the construction of mitigation areas. Beyond dredging, the work requires specialized activities such as drilling and blasting, coral relocation, and extensive environmental monitoring for turbidity, sedimentation, and protected species. The total magnitude of construction is estimated between 100 million and 250 million dollars, with a total period of performance spanning 757 calendar days.

General Info

Contract Value

$215,820,210.32

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

17

Miami Harbor Deepening Project - Core Borings and Laboratory Testing Final Report

PDF, Low priorityfinal-report
Low

10-142_XYZ.zip

ZIP

11-006_XYZ.zip

ZIP

12R13_Amendment0001.pdf

PDF

12R13_Amendment0003.pdf

PDF

12R13_Amendment0004.pdf

PDF

12R13_Amendment0005.pdf

PDF

12R13_Amendment0006.pdf

PDF

12R13_PLANS.pdf

PDF

12R13_SPECS%28Vol_1%29.pdf

PDF

12R13_SPECS%28Vol_2%29.pdf

PDF

hor.dwg

DWG

map.dwg

DWG

PROF.dwg

DWG

RFP_12-R-13_MIAMI_--_Added_by_Am2_--_CHALLENGE_Summary_Table_%26_Compression_Testing_Photos_Taken_From_--Corps_Borings_and_Lab_Testing_Final_Report--.pdf

PDF

RFP_12-R-13_MIAMI_--_Added_by_Am2_--_Mactec_Summary_Table_Graphs_%26__Compression_Testing_Results_and_Photos_Test_Results.pdf

PDF

RFP_12-R-13_MIAMI_Am2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 30, 2012 to Jan 3, 2013. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 9:00 PM UTC on Jan 3, 2013. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jan 3, 2013 to Jan 10, 2013. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The project work consists of construction dredging to provide for the Federally authorized project improvements and Local Sponsor Berthing Areas of Miami Harbor, Florida. To facilitate the authorized project, the Phase 3 deepening contract will dredge the following features: (1) Cut-1 to a depth of 52 feet MLLW plus one foot allowable overdepth, including the widening of the outer portion of the cut from 500 feet to 800 feet; (2) Cut-2 to a depth of 52 feet MLLW plus one foot allowable overdepth; (3) Cut-3 to a depth of 50 feet MLLW plus one foot allowable overdepth, including a new turn widener at the intersection of Cut-3 and the Fisher Island Turning Basin; (4) Fisher Island Turning Basin to a depth of 50 feet MLLW plus one foot allowable overdepth, including an expansion of the turning basin from 1200 feet to approximately 1500 feet; (5) Fisherman's Channel to a depth of 50 feet MLLW plus one foot allowable overdepth, including a shift of the channel by 60 feet to the south and the widening of the channel by 40 feet to south from 400 feet to 440 feet; (6) Lummus Island Turning Basin to a depth of 50 feet MLLW plus one foot allowable overdepth, including a reduction of the turning basin from 1600 feet to approximately 1500 feet; and (7) Port of Miami Berthing Areas along Fisherman's Channel to a depth of 50 feet MLLW plus one foot allowable overdepth, including an expansion of the berthing areas by 60 feet south into the existing Federal channel. Total quantity to be dredged from the Federal Channel is approximately 5 million cubic yards (cy) and from the Berthing Areas is approximately 200,000 cy. All dredged material will be placed in the ODMDS located an average of 4.5 statute miles from the dredging location, the Julia Tuttle Seagrass Mitigation Area located an average of 7.0 statute miles from the dredging location, and the two Offshore Artificial Reef Areas located an average of 2.4 statute miles from the dredging location. The contract will be divided into a Base and Two Optional Items. The Base work includes dredging of Cut-1 and Cut-2 as well as the construction of the Seagrass and Artificial Reef construction; Option A covers the dredging of Cut-3 Station 0+00 to Station 12+00 and Fisherman's Channel from Station 17+00 to the end of the Lummus Island Turning Basin as well as the dredging of the berthing areas adjacent to these reaches where present; Option B covers the dredging of Cut-3 Station 12+00 to Fisherman's Channel Station 17+00 as well as the dredging of the berthing areas adjacent to these reaches where present. In addition to dredging, the work involves drilling and blasting (includes protected species observers, fish-kill monitoring, protected species watch plan activities, and vibration monitoring/control activities), turbidity/sedimentation monitoring (includes pre- and during construction environmental monitoring of adjacent seagrass beds and hardbottom communities for direct and indirect impacts associated with construction activities), endangered species observers (hopper dredges only), dedicated manatee observers (clamshell dredges only), coral relocation, and seagrass and artificial reef mitigation areas construction. Magnitude of construction is between $100,000,000.00 and $250,000,000.00. The total Period of Performance is 757 calendar days.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS