Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of The Interior was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--NGWSP BLOCK 2-3 HDD

Awarded
140R4026R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
East Highlands Sanitary Sewer Replacement Phase II
Solicitation # 26-215
The East Highlands Sanitary Sewer Replacement Phase II (Solicitation 26-215) is a public works project for the City of Naperville, Illinois, managed by the Department of Public Utilities. The scope of work involves filling and abandoning existing sanitary sewers and manholes and installing approximately 4,400 linear feet of 8-inch and 1,000 linear feet of 10-inch sanitary sewers, along with manholes and 6-inch sanitary services. Work will be performed across several locations, including E Hillside Rd, Sunset Dr, Thornwood Dr, Pine Ct, Santa Maria Dr, Willow Rd, and Diane Ln. The project also requires extensive restoration, including driveway and roadway pavement patching, curb and gutter replacement, traffic control, and landscape restoration, all performed in accordance with the latest IDOT Standard Specifications and ADA guidelines. The contract will be awarded to the lowest responsible bidder based on factors such as performance history, financial capacity, and technical suitability. Bidders must have completed five similar projects in the last five years and maintain a local office within 70 miles of Naperville. Required submissions include an Affidavit of Compliance, IDOT prequalification certificates, and a bid deposit equal to 10 percent of the total bid. Once awarded, the contractor must provide performance and payment bonds equal to the contract price within ten calendar days. The project is subject to the Illinois Prevailing Wage Act, and failure to meet the final completion date will result in liquidated damages of 1,000 dollars per calendar day.
Public Utilities (Water) | DPU-W

POSTED

about 2 hours ago

DEADLINE

in 24 days
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Navajo-Gallup Water Supply Project Block 2-3 Horizontal Directional Drilling (HDD) contract, identified by solicitation number 140R4026R0002, involves the installation of 42-inch and 36-inch water transmission pipelines via horizontal directional drilling at four critical crossings in San Juan County, New Mexico: Nenahnezad Bluff, Shumway Arroyo, San Juan River, and Chaco River. The project, managed by the Bureau of Reclamation’s Upper Colorado Regional Office, has a performance period spanning from May 20, 2026, to September 21, 2027, with work required to begin within 21 calendar days of the Notice to Proceed and be completed within 469 calendar days. Technical specifications for HDD activities are detailed in revised Section 33 05 22, including precise requirements for pilot bore drilling, conductor casing, pipe installation, reaming step sizes, disposal of drilling fluids, hydro-testing, and the use of protective end caps and sacrificial pipe lengths. Pricing is structured under multiple contract line items covering mobilization, site preparation, drilling, pipe furnishing, testing, and documentation, with payment terms tied to linear foot measurements and compliance with ASTM, AWWA, ISO, SSPC, and NACE standards for materials and coatings. Contractors must adhere to stringent environmental, safety, and cultural resource protections, including restrictions on work hours, noise, and light emissions, as well as compliance with OSHA and Bureau of Reclamation safety standards. The solicitation mandates submission of three distinct electronic proposal volumes—Business, Technical, and Pricing—each with strict page limits and formatting rules, and requires all pricing to be contained exclusively in Volume III. Evaluation for award prioritizes technical approach, staff qualifications, quality control, past performance, and safety record, with non-price factors collectively weighted equally to cost, enabling a best-value trade-off selection under FAR Part 15. The contract includes special provisions for Indian Preference, mandatory participation in the Department of the Interior’s CPARS performance system, and requirements for safeguarding contractor information systems. All proposals must be submitted electronically via Microsoft Teams prior to the February 25, 2026 deadline, with no hard copies accepted, and contractors are expected to comply with detailed packaging, preservation, and labeling requirements for materials and coatings, including temperature controls and protection from environmental exposure. The government retains final

General Info

Firm-fixed price HDD contract for large pipeline crossings in New Mexico with strict quality, environmental, and regulatory compliance.

Contract Value

$75,532,921

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT, USA

Set-Aside

Total Small Business Set-Aside

Award Issued Date

Potential End Date

July 7, 2028

Documents

27
PDF, High priority: read this first46 pages · specifications
High
PDF, High priority: read this first42 pages · specifications
High
PDF, High priority: read this firstpast-performance
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first7 pages · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first18 pages · amendment
High
DOCX, High priority: read this firstexperience-form
High
PDF, High priority: read this first3 pages · drawings
High
PDF, High priority: read this first1 page · drawings
High
PDF, High priority: read this first25 pages · industry-day
High
DOCX, High priority: read this first2 pages · presolicitation
High
PDF, High priority: read this first1 page · q-and-a
High
PDF, High priority: read this first3 pages · q-and-a
High
PDF, High priority: read this first1 page · q-and-a
High
PDF, High priority: read this first278 pages · specifications
High
PDF, High priority: read this first3 pages · ifb
High
PDF, High priority: read this first103 pages · rfp
High
PDF, High priority: read this first70 pages · specifications
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstwage-determination
High
DOCX, Low prioritykey-personnel-form
Low
PDF, Low priority50 pages · other
Low
PDF, Low priority1 page · other
Low
PDF, Low priority15 pages · other
Low
PDF, Low priorityother
Low

Read all 27 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • East Highlands Sanitary Sewer Replacement Phase IIOpen now, due in 24 days
  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
NGWSP BLOCK 2-3 HDD

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
New
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140RR027B0004
The Navajo-Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a firm fixed price construction project issued by the Bureau of Reclamation, Upper Colorado Regional Office. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project has an estimated magnitude between 10 million and 25 million dollars. The scope of work involves the installation of a pre-engineered concrete booster pump station, a secondary regulation tank at Regulation Tank No. 3, SCADA equipment, and necessary erosion and scour restoration. The period of performance is scheduled from April 5, 2027, to May 22, 2028. This total small business set-aside solicitation requires the contractor to provide all necessary equipment, materials, and specialized personnel, including full-time safety and quality control representatives. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA accessibility standards, and environmental regulations such as the Clean Water Act and SWPPP. The contract specifies liquidated damages of 6,001 dollars per calendar day of delay. Award will be granted to the responsible offeror who is compliant with all solicitation terms, provides the appropriate bid guarantee, and submits the lowest priced bid. Invoicing must be processed electronically through the Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 2 months
View Details
NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
The East Canal Efficiency Improvements project, solicitation 140R4026R0025, is a total small business set-aside construction contract issued by the Bureau of Reclamation's Upper Colorado Regional Office. Located in Delta County, Colorado, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically focusing on the installation of HDPE and polypropylene pipelines, concrete hydraulic structures, and metalwork. Key project components include the West Loutsenhizer Arroyo Diversion Pipeline, Double Barrel Siphon, Side Channel Spillway, Ramp Flume, and GK Check Structure. The work encompasses mobilization, earthwork, clearing and grubbing, and the installation of flow measuring equipment, valves, and appurtenances. The period of performance is scheduled from January 25, 2027, to November 1, 2028. Proposals are evaluated based on five factors: technical approach, construction schedule, project team composition, past performance, and price. Contractors must adhere to strict seasonal work restrictions tied to irrigation cycles and comply with environmental regulations, including the Clean Water Act and the implementation of a Storm Water Pollution Prevention Plan. The contract is subject to the Davis-Bacon Act and requires performance and payment bonds to be submitted within 10 calendar days of award. Final acceptance of materials and work will occur exclusively at the jobsite following successful quality control and quality assurance testing.
Water and Sewer Line and Related Structures Construction

POSTED

12 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS