Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

EAST CANAL EFFICIENCY IMPROVEMENTS

Active
140R4026R0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The East Canal Efficiency Improvements project, solicitation 140R4026R0025, is a total small business set-aside construction contract issued by the Department of the Interior, Bureau of Reclamation, Upper Colorado Regional Office. Located in Delta County, Colorado, the project focuses on the construction of water supply facilities with an estimated magnitude between 5 million and 10 million dollars. The scope of work includes mobilization, earthwork, clearing and grubbing, and the installation of HDPE and polypropylene pipelines, concrete hydraulic structures, metalwork, valves, and flow measuring equipment. Key project sites include the West Loutsenhizer Arroyo Diversion Pipeline, Double Barrel Siphon, Side Channel Spillway, Ramp Flume, and GK Check Structure. Performance must begin within 21 days of award and be completed within 1,300 calendar days, with specific seasonal work restrictions tied to irrigation shutdown and startup dates. Award will be based on the Best Value determination using a rational tradeoff between price and four equally weighted non-price factors: technical approach, construction schedule, project team composition, and past performance. Proposals are subject to strict formatting guidelines and must include detailed experience and key personnel forms. The contract is a firm fixed price arrangement and is subject to the Davis-Bacon Act, Buy American requirements, and specific Bureau of Reclamation safety and health standards. Contractors are required to provide bid guarantees, performance and payment bonds within 10 days of award, and written certification of insurance before commencing onsite work. Final inspection and acceptance of all materials will occur exclusively at the jobsite following installation and testing.

General Info

Small business construction contract for Colorado water facilities, valued between 5-10 million dollars.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT

Set-Aside

SBA

Documents

19

140R4026R0025 Attachment 2 - Drawings

PDF, High priority: read this first48 pages · specifications
High

140R4026R0025 Attachment 3 - Wage Determination CO20260003

PDF, High priority: read this firstwage-determination
High

140R4026R0025 Attachment 4 - Wage Determination C020260001

PDF, High priority: read this firstwage-determination
High

140R4026R0025 Attachment 7 - Experience Form

DOCX, High priority: read this firstpast-performance
High

140R4026R0025 Attachment 8 - Key Personnel Form

DOCX, High priority: read this firstpast-performance
High

140R4026R0025 - East Canal Efficiency Improvements Specifications

PDF, High priority: read this first300 pages · specifications
High

140R4026R0025 East Canal Water Efficiency Improvements

PDF, High priority: read this first91 pages · rfp
High

140R4026R0025 - East Canal Water Efficiency Improvements

PDF, High priority: read this first4 pages · rfp
High

140R4026R0025 Price Schedule - East Canal Efficiency Improvements

XLSX, High priority: read this firstspecifications
High

31-417-1088 Diversion Pipeline Inlet Structure Metalwork

PDF, High priority: read this firstspecifications
High

31-417-1088 Diversion Pipeline Inlet Structure Metalwork

PDF, High priority: read this firstspecifications
High

East Canal Efficiency Improvement – Draft Specifications and Price Schedule

PDF, High priority: read this first300 pages · specifications
High

East Canal Efficiency Improvements - Draft Specifications and Price Schedule

PDF, High priority: read this firstspecifications
High

East Canal Efficiency Improvement – Summary of Work

PDF, High priority: read this first4 pages · sow
High

Uncompaghre Project East Canal Efficiency Improvement – Summary of Work

PDF, High priority: read this firstsow
High

140R4026R0025 Attachment 5 - Construction Contract Administration

PDF, Low priority1 page · special-notice
Low

140R4026R0025 Attachment 6 - Past Performance Questionnaire

PDF, Low priority4 pages · past-performance
Low

140R4026R0025 Pre-Solicitation Notice - East Canal Water Efficiency Improvements

PDF, Low prioritypresolicitation
Low

East Canal Water Efficiency Improvement Sources Sought

PDF, Low priority2 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
EAST CANAL EFFICIENCY IMPROVEMENTS

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 22 days
View Details
NAICS: 237990
Federal
RIDGES BASIN GATE HYDRAULICS MOD
Solicitation # 140R4026Q0165
Solicitation 140R4026Q0165 is a firm-fixed-price request for bids issued by the Bureau of Reclamation for the Ridges Basin Dam Gate Hydraulic Modification project located near Durango, Colorado. The primary objective is to replace specific sections of 1.5-inch diameter Schedule 80 steel hydraulic piping with flexible hydraulic hoses to enable the jet flow gate bonnet and cylinder to be lifted 12 inches without disconnecting the system. The scope of work includes isolating and draining the system, welding four adapter fittings, installing two 1.5-inch inner diameter hoses, and refilling the system with ISO VG-46 biodegradable hydraulic fluid cleaned through a 4-micron element. The contractor is also required to provide one assembled spare hose, coat any new or damaged steel piping, and demonstrate the 12-inch movement capability. The project has a performance period of ninety calendar days from the date of award. Bids are due by October 21, 2026, and will be awarded to the responsible offeror with the lowest priced, technically acceptable offer. Technical evaluations will focus on the proposed approach, work schedule, labor and equipment mix, personnel qualifications, and a comprehensive Quality Control Plan. Additionally, contractors must provide past performance data for at least three similar projects. All work must comply with ASME B31.1 welding standards and Davis-Bacon Act prevailing wage rates for heavy construction in Colorado. Required deliverables include a Safety Plan submitted within 30 days of award and invoices processed through the IPP system.
Other Heavy and Civil Engineering Construction

POSTED

16 days ago

DEADLINE

in 13 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Bureau of Reclamation, Upper Colorado Regional Office, is soliciting a firm-fixed-price contract for professional technical support to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The primary objective is to identify and resolve security deficiencies, update system documentation, and reestablish communication links with the NTUA Escrito Mesa data concentrator. The scope of work includes developing a comprehensive System Security Plan, updating the Plan of Action and Milestones, and providing ongoing project management and monthly reporting. An optional task is included for the programming and integration of the new DZ Booster Pump Station, including HMI and PLC modifications. This requirement is designated as a sole source procurement under FAR 6.103-1 and 41 U.S.C. 1901, with Jacobs Engineering identified as uniquely qualified due to their prior design, construction, and operational knowledge of the facility. The base period of performance is scheduled from November 30, 2026, to May 30, 2028, with the optional integration task running from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer, considering both price and technical capability, though price is weighted as significantly more important than technical and past performance factors.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

23 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS