Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on June 29, 2003. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- Pecos Residence Roof Replacements

Awarded
RFQ-R3-03-03-40Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
INDEX ROOF FLUID APPLIED ROOF
Solicitation # 27-350SOS-PHYSE-B-54721
The Illinois Secretary of State is soliciting bids for the installation of a new fluid-applied roof system on the Index Building located at 111 E. Monroe St, Springfield, IL. The project requires the application of a white, cold-applied, single-component silicone elastomer membrane designed for permanent weather and sunlight exposure. Key deliverables include the construction of a 100 square foot mock-up, the performance of a 72-hour flood test to ensure water resistance, and the provision of a 20-year manufacturer full labor and material warranty. The award will be granted to the responsive and responsible bidder who submits the lowest price. Bidders must submit all proposals electronically via BidBuy by November 19, 2026, and must provide a 10% bid bond. The contract requires adherence to strict material storage and delivery standards, including the use of original manufacturer containers and storage in weather-protected environments. Compliance with the State Prompt Payment Act, prevailing wage laws, and the Illinois Department of Human Rights Act is mandatory. Additionally, the total contract term, including all renewals and extensions, cannot exceed ten years. Vendors must provide a Certificate of Insurance naming the State as an additionally insured party and are responsible for all safety barricades and traffic signage during the project.
PHYSERV350 - Physical Services

POSTED

about 17 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Solicitation R3-03-03-40 is a 100 percent small business set-aside request for quotations to perform roof replacements on four wood-framed residences at the Pecos Ranger District Administrative Site in New Mexico. The project requires a licensed contractor to tear off existing asphalt shingles and install a complete metal roof system, including 26 gauge Galvalume panels in Classic Green, rigid board insulation, new gutters, and flashing. The scope of work also includes replacing water-damaged fascia and substrate, with specific estimated replacement percentages provided for each residence. The contract is a firm-fixed price purchase order with a performance period of 45 days from the date of award. Award decisions will be based on a best-value determination weighing price reasonableness and a technical proposal equally. Technical evaluations will focus on the contractor's past performance, personnel experience, and a detailed work plan. The contractor must provide a 20-year manufacturer's warranty on products and a 2-year watertight guarantee on labor. All work must comply with applicable Federal, State, and local building codes, and the contractor is responsible for the disposal of all debris at an approved landfill. Responses must be submitted in writing by July 18, 2003.

General Info

Small business contract for metal roof replacements on four New Mexico residences.

Agency

N/A

Contract Value

$46,829

NAICS

238160 - Roofing Contractors

Place of Performance

Pecos Ranger District Administrative Site, Pecos, NM on the Santa Fe National Forest. Pecos is approximately twenty (20) miles, NM, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Roberta BuskirkContract Specialist

Full Description

Show more
THIS is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. The solicitation documents, incorporated provisions and clauses are those in effect through Federal Acquisition Circular 01-14. Solicitation number R3-03-03-40 is issued as a Request for Quotation (RFQ) in accordance with FAR subpart 13.5. This acquisition is a 100% small business set-aside. The Northern American Industry Classification System (NAICS) code is 238160 and the size standard is 12 million dollars. A firm-fixed price purchase order will be issued under the Test Program for Certain Commercial Items. Period of performance is 45 days from time of award. THE solicitation is for Pecos Residence Roof Replacements with the line items as follows: Item 1, Pecos Residence Roof Replacement, #525 & #526 - 2 each; Item 2, Pecos Residence Roof Replacement, #502 & #500 - 2 each; THE accepted lump sum quantity will be paid for at the contract unit price accepted in this contract. All other items of work necessary to complete the project will be considered subsidiary to the lump sum payment. Payment shall be full compensation for all labor, material, equipment, tools, transportation, and incidentals necessary to complete the work prescribed. SCOPE - This project consists of, but is not limited to, all work and materials necessary for the tear-off and re-roofing of wood framed residences, providing a sound, secure and complete metal roof system. The work includes the tearoff of an existing asphalt shingle roof and the installation of a metal roof system. Included shall be disposal of the existing roof materials, replacement of all water damaged fascia, replacement of any water damaged roof substrate, application of new saturated felt and ice and snow guard, installation of metal drip edges and metal faced fascia, replacement of all gutters with new gutters with covers and downspouts, fastening of a metal roofing system, and installation of new flashing and boots on all roof penetrations, including a chimney and wood stove stack. SAFETY AND CODE COMPLIANCE - 1. Applicable Federal and State laws and regulations shall be adhered to. All construction activities shall meet the latest edition of all applicable Federal, State and local building codes including the following: International Building Code (IBC); International Mechanical Code (IMC); National Electrical Code (NEC); and International Plumbing Code (IPC). 2. The Contracting Officer's Representative (COR) shall be notified when hazardous solvents or materials are utilized and a MSDS shall be supplied for each type of hazardous material on the project site. 3. No asbestos-containing materials shall be used in the construction of the roof system. 4. The District Facility Manager shall notify the occupants of the residences of the schedule of roofing operations after the Contractor submits the construction schedule to the COR. 5. The Contractor shall not remove the existing roofing material if there is a threat of inclement weather. When roofing material is removed, the substrate must be covered to avoid exposure. Roof tear off shall occur on one house at a time, unless approved otherwise by the COR. Each roof shall be substantially complete before work progresses to the next roof, as approved by COR. EXISTING CONDITIONS - 1. The Pecos Residences will be occupied during the re-roofing. 2. The residences were originally constructed in the 1940's with a wood joist roof structure. There are approximately two layers of shingles. 3. On residences #526 & #525, approximately 25% of the fascia will be replaced; approximately 25% of the substrate on Residence #526 and 40% on Residence #525 will be replaced. 4. Approximately 25% of the fascia and 35% of the substrate on Residence #500, and 50% of the fascia and 25% of the substrate on Residence #502 will be replaced. 5. The original roof plan is not available, but the existing roofs on residences #525 & #526 are approximately 2210 square and residences #500 & #502 roof area is approximately 2200 square feet, all at a slope of 2:12. 6. There are five (5) gas appliance penetrations, two (2) fan vents, a chimney, wood stove stack, a square furnace stack with attached TV antenna, and satellite dish per residence. Any equipment removed for roof installation shall be reinstalled. Project requires that all work performed shall be done by a licensed contractor(s). Contractor shall be responsible for any fees required by this project. SUBMITTALS - 1. The Contractor shall submit the manufacturer's current literature, specifications, installation instructions and general recommendations, complete with shop drawings and erection details from the manufacturer. Also provide installation instructions for the rigid insulation board and the EPDM boots installed on roof penetrations. 2. Provide roofing material samples and color chart to COR for approval, and submit alternate manufacturer's specifications when asking approval of an equal preformed metal roof product, certifying that the product is acceptable. The color shall be - Classic Green, or as selected by the COR. MATERIALS AND PRODUCTS: 30 lb. saturated Felt. Ice and Snow Guard four feet (4) up from the fascia. Galvanized steel panel roof system as manufactured by - MBCI, Metal Roof & Wall Systems (+1 (555) 000-0000) P.O. Box 10133, Lubbock, Texas 79408, (FAX +1 (555) 000-0000), or approved equal, designed as follows: (1) for 50 psf wind uplift. (2) 26 gauge 'Galvalume', MBCI - Signature 300 panels with Kynar 500 coating, Classic Green color. (3) "R-Panel" pattern, ribs spaced on 12-inch centers. (4) All exposed flashing shall be of the same material and finish as the panel system. Metal fascia facing shall cover the entire wood fascia of the building. (5) EPDM boots, resistant to ozone and ultraviolet rays, as manufactured by - Portals Plus for all vent and pipe roof penetrations. Portals Plus, INC product distributors can be located @ 800.PPI-5240 or +1 (555) 000-0000, contact@example.gov. (6) Rigid board insulation, - black poly iso, two inches thick, available from - El Sol of New Mexico in Santa Fe @ +1 (555) 000-0000, shall be installed under the panels (7) New gutters shall be a - Box Eave Gutter 5-1/4 X 4-1/2 and shall be of the same material as the panels. TEAROFF - The existing asphalt shingle roofing material shall be removed and disposed of by the Contractor at a State of New Mexico approved landfill. WARRANTY - The contractor shall provide manufacturer's standard 20-year warranty for manufactured products and shall guarantee metal roofing work to be watertight for a period of 2 years. MORE DETAILED SPECIFICATIONS along with two drawings is available for this project. To obtain this information, please send a fax request to Roberta Buskirk/Letty Shindelar at +1 (555) 000-0000. Make sure that the solicitation number, your company name, address, phone number and fax number are on the request. LOCATION is Pecos Ranger District Administrative Site on the Santa Fe National Forest, in T16N R12E, Section 33, NMPM. Administrative Site is on the south side of the community of Pecos, NM. Pecos is approximately twenty (20) miles southeast of Santa Fe, by way of Interstate 25 North and State Highway 50. The Site is restricted to government employees. A show me trip can be arranged after July 9 by contacting Carol Linn, Santa Fe National Forest at +1 (555) 000-0000. FAR 52.212-2, Evaluation--Commercial Items is applicable. The Government will award the contract to the Contractor whose offer represents the best value to the Forest Service on the basis of (1) Price Reasonableness, and (2) Technical Proposal. Price Reasonableness and Technical Proposal are equally important. The evaluation criteria for each category are listed in descending order of importance. PRICE REASONABLENESS - Criteria (1) Price shall be fair market value for materials, labor, and incidentals represented on the drawings and in the specifications necessary to complete this project. In the event - fair market value becomes a point of discussion, the resolution will be determined by the use of documented unit prices from cost guides, suppliers, distributors and completed contracts having similar and/or related work. The following will be evaluated for Price Reasonableness: Total cost of proposal per roof. TECHNICAL PROPOSAL - CRITERIA (1) Past Performance - (a) Provide the general background, experience and qualifications of the organization. (b) Include a list of similar or related type projects awarded to the firm within the last three (3) years. Include the name of the customer, contact number, dollar amount, time of performance (length of contract, date started and date completed) and the name and telephone number of the contracting officer or procurement official. (c) List any defaults or contract performance problems in the last five (5) years. CRITERIA (2) Experience of Project Personnel - (a) include a list of names and responsibilities of the key personnel assigned to the project. With each name, include the role the person will serve on this project and a short description of recent project work accomplished by the individual. CRITERIA (3)(a) Submit a work plan indicating how the job will be accomplished. The technical approach should contain as much detail as the Contractor considers necessary to fully explain the proposed technical approach or method. The technical proposal should reflect a clear understanding of the nature of the work being performed. Include the proposed construction schedule showing start/complete dates for individual portions of the work. Indicate turn around time for delivery and set-up. Include the earliest possible delivery date. (b)The technical proposal must include information on how the project is to be organized, staffed and managed, indicated size of work crew(s) to be assigned to the project. Information should be provided which will demonstrate the Contractor's understanding of the type of work being performed. b1)The technical proposal must include: Quality control and supervision to assure specifications are met and production capability. b2) Roofing Materials used; method of installation. b3)The technical proposal must also include information regarding financial stability. (i.e., is the company capable of covering all financial obligations for the project, including employee payroll, prior to receipt of contract payment?) FAR 52.212-3, Offeror Representations and Certifications--Commercial Items, must be completed and included with offer. These clauses can be accessed through the website http://www.arnet.gov/far/. THE following FAR clauses apply to this acquisition: 52.203-6 Restrictions on Subcontractor Sales to the Government, with Alternate 1, 52.212-1, Instructions to Offerors'Commercial Items, 52.212-4 Contract Terms and Conditions - Commercial Items, 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-- Commercial Items, with the following additional FAR clauses cited in the clause which are applicable to this acquisition. 52.222-26 Equal Opportunity, 52.222-35 Affirmative Action for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans 52.222-36 Affirmative Action for Workers with Disabilities, 52.222-37 Employment Reports on Disabled Veterans and Veterans of the Vietnam Era, 52.225-13 Restriction on Certain Foreign 52.232-34 Payment by Electronic Funds Transfer -- Other than Central Contractor Registration 52.222-6 Davis-Bacon Act 52.222-13 Compliance with Davis-Bacon and Related Act Regulations 52.222-27 Affirmative Action Compliance Requirements for Construction 52.225-9 Buy American Act--Balance of Payments Program--Construction Materials. 52.225-10 Notice of Buy American Act Requirement - Construction Materials 52.246-12 Inspection of Construction 52.246-21 Warranty of Construction FOR INFORMATION regarding this solicitation, contact Roberta Buskirk at +1 (555) 000-0000 with any contractual questions or Carol Linn at +1 (555) 000-0000 for any technical questions. Once again, a more detailed specification along with two drawings is available for this project. To obtain this information, please send a fax request to Roberta Buskirk/Letty Shindelar at +1 (555) 000-0000. Make sure that the solicitation number, your company name, address, phone number, and fax number are on the request. VENDORS wishing to respond to this solicitation should send their responses to Cibola National Forest, 2113 Osuna Road NE, Suite A, Albuquerque, NM 87113; be sure to reference the solicitation number listed above. Offers must be in writing accompanied by the completed representations and certifications or they will be rejected. Facsimile and telegraphic offers will not be accepted. Offers are due no later than July 18, 2003 at 4:45 pm Local Time.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS