Y--Picayune Strand Restoration Project, Miller Pumping Station, Collier County, Florida

Awarded
W912EP-13-R-0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 15 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Miller Pumping Station is a critical component of the Picayune Strand Restoration Project in southwestern Collier County, Florida, aimed at restoring over 55,000 acres of wetlands by removing subdivision infrastructure and restoring pre-drainage hydrology. The project involves the construction of a 1,250-cfs pumping station featuring six diesel engine-driven pumps and two electric motor-driven pumps, along with tie-back levees, spreader cells, and canal plugs to manage water distribution across the landscape. The scope encompasses comprehensive civil, mechanical, and electrical works, including the installation of power distribution systems, control room workstations, and a radio antenna tower. Beyond the base construction, the contract includes several options for canal plugging, bridge demolition, road degradation, and the restoration of the I-75 access road. The project site is located on land owned by the State of Florida Board of Trustees of the Internal Improvement Trust Fund and is managed by the Florida Forest Service. The total period of performance for the entire project is 1,163 calendar days following the issuance of the Notice to Proceed.

General Info

Contract Value

$79,213,550.26

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 2, 2013 to Jul 9, 2013.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The Miller Pumping Station is part of the Picayune Strand Restoration Project (PSRP). The Picayune Strand Restoration Project will restore more than 55,000 acres of land located in southwestern Collier County, Florida to a healthy and functional wetland system. The plan for the Project is to remove the infrastructure of a subdivision and restore its pre-drainage hydrology and ecology, generating positive effects on the hydrology, vegetation, and wildlife of the project area and surrounding public lands. In addition, the existing road network within PSRP will be taken down to grade with a limited portion of the roads remaining above grade. The work for the Miller Pumping Station includes the construction of a pumping station, tie-back levees, spreader cells, and canal plugs to slow water flowing through existing canals and distribute it across the landscape. The Miller Pumping Station will have six 235-cfs engine-driven pumps and two 75-cfs electric motor-driven pumps. a. Base work includes construction of the 1,250-cfs Miller Pump Station, tie-back levee, spreader berm, and weirs, backfilling of an existing drainage canal, and excavation of a new drainage canal. The construction of the Miller Pump Station and related site features shall include, but not be limited to, dewatering, excavation, station substructure, backfill, clearing, grubbing, placing riprap, seeding, sodding, access bridges, fuel storage areas with containment and associated equipment, sanitary sewer system, fully enclosed buildings for the equipment, approach and discharge canals, access roads, retaining walls, trash racks and rakes, and related civil works. Mechanical work will include, but not be limited to, two 75-cfs electric motor driven pumps and six 235-cfs diesel engine driven pumps (one of each type are redundant), traveling trash rakes, bridge crane, diesel and LP generators, HVAC equipment, cooling water pumps, well pumps, dewatering pumps, water treatment equipment, lubricating water equipment, and other miscellaneous mechanical equipment. Electrical and Instrumentation work will include, but not be limited to, station power distribution systems, station switchgear, motor control centers, programmable logic controllers to control and monitor all ancillary mechanical equipment, grounding and lightning protection systems, lighting, control room workstations, uninterrupted power service equipment, remote terminal units, 80-foot radio antenna tower, and microwave communication links. b. Option A work includes a plug at the spreader berm, standard canal plugs in Miller Canal and along the Faka Union Canal, demolition of the existing bridges on 128th Ave SE/Lynch Blvd and 100th Ave SE/Stewart Blvd, demolition of the existing Miller-1 and Miller-2 Weirs, and incidental related work. c. Option B work includes removing existing tram roads, along with clearing, disposal, burning, and incidental related work. d. Option C work includes degrading roads, backfilling swales, clearing, grubbing, and incidental related work. e. Option D work includes extension of the operational, testing, and monitoring period (OTMP), for a period up to, but not exceeding, six months. f. Option E work includes restoring I-75 access road to pre-project conditions. Option includes demolition of asphalt, relocating fencing, repaving, seeding, and incidental related work. The Miller Pump Station Project is located within the land owned by the State of Florida Board of Trustees of the Internal Improvement Trust Fund and controlled by the Florida Forest Service. The Picayune Strand Restoration Project is located south of I-75, west of Prairie Canal/Basil Road, north of Tamiami Trail, and east of Belle Meade. The Miller Pump Station shall be constructed adjacent to the Miller Canal near 64th Avenue SE. Other earthwork shall be performed west of Miller Canal. The period of performance for the entire project is 1163 calendar days after issuance of the Notice to Proceed.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS