Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 3, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- RENOVATE SYNTHESIS LAB, BLDG 1777, CCAFS

Closed
FA2521-07-R-0080Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 236210
New
Federal
Sources Sought - POST TEST LITHIUM BATTERY STORAGE
Solicitation # N00167-27-RFPREQ-CD-102-0002
The Naval Sea Systems Command Naval Surface Warfare Center Carderock Division is conducting a sources sought effort for the construction of a Post-Test Lithium Battery Storage Facility in West Bethesda, Maryland. This project, classified under NAICS code 236210 for Industrial Building Construction, involves the creation of a storage area featuring a non-flammable single-pitch sloped roof, a perimeter fence with a gate, 3-hour rated firewalls, and concrete walls for large battery storage. Additional requirements include low-voltage outlets, pole-mounted LED flood lighting, and a dedicated forklift access road. The effort must be completed within 210 days of the award and adhere to Unified Facilities Guide Specifications and other stringent technical criteria. This notice is not a request for proposal, and no award will be made directly from this notice. Interested small and large businesses must submit a capability statement and a Rough Order of Magnitude by 1700 EST on 18 November 2026 to Heather Valiga. The government will use these responses to determine the future acquisition strategy. Because the project is located on a secure military installation, all personnel must obtain proper clearances and credentials. Key deliverables include an Activity Hazard Analysis and a detailed schedule due within five days of the pre-construction meeting, as well as a personnel list provided seven days before the start date.
Nswc Carderock

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 236210
New
SLED
Arrowhead Regional Medical Center Lot 1 Parking Structure
Solicitation # 2026010330
The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.
San Bernardino County

POSTED

1 day ago

DEADLINE

N/A

General Info

Contract Value

$90,000

NAICS

236210 - Industrial Building Construction

Place of Performance

45th Contracting Squadron14640 Hangar Rd Cape Canaveral AFS, FL 32925, FL

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2521 45 Cons Pk
Contacts1 person available
OfficePATRICK SFB, FL, 32925-3237, USA
Office AddressPATRICK SFB, FL, 32925-3237, USA
Contacts
John R PollardContract Specialist

Full Description

Show more
A. The contractor shall provide all labor, materials, equipment, transportation, and supervision to accomplish the following statement of work. All work shall be done in accordance with National Electrical Code, National Fire Protection Agency, Life Safety Codes, all local building codes, and any attached drawings. Contractor to perform site visit prior to submittal of cost proposal. B. Contractor work hours to be 0730 to 1630, Monday through Friday, excluding federal holidays. Should it become necessary for work to be accomplished during weekends and holidays, the contractor is to provide written notification 72 hours prior to the desired days. C. Building 1777 is a controlled area under the protection of the base security contractor. The Contractor shall comply with all security regulations imposed by this activity. The Contractor, subcontractors, and all of their employees shall have access only to those areas required for execution of this work. Contractor shall provide a list of employees scheduled to work on this project. The list shall include any subcontractor?s necessary to complete this project and submitted to the Contracting Officer for review and approval in order to access building 1777 for the contract work. D. Escorts will accompany the Contractor at all times due to the security requirements of the areas affected by this renovation. Contractor is required to notify AFTAC/XPC 48 hours in advance as to which areas the contractor will require access. This advance notice is required so that the Facility Management Office can arrange the necessary number of escorts and the times their presence is required. E. Badges: All Contractor personnel shall display assigned visitor badges while working in the area. Badges will be issued by the assigned escort at the beginning of each work day and returned to the assigned escort prior to exiting the facility. Contractor should expect to incur minor delays for daily badge processing. Contractor is to perform the following to accommodate isolating the north portion of the existing Synthesis lab, room 130C per the attached schematic. The new room will be designated as an Extraction room, room 130K. 1. Modify existing doors, walls, and cabinets per the attached schematic. A. Install new dividing wall at location shown in existing Synthesis room. 1. Isolate space above the ceiling. 2. Seal new wall panels to deck frames. 3. Remove corner base cabinet, cut epoxy top to accommodate new layout. 4. Furnish and install trim and base molding. B. Relocate existing door from Change Out Room (130D) to new Extraction room from the hallway. C. Replace existing Change Out Room door with new door, opposite swing. D. Add new wall section with new door in north/south hall. 2. Existing air handling systems currently serving the Synthesis lab will need to be modified to enable isolation of the newly formed Extraction room from the remaining portion of Synthesis Lab. A. Air handler #1B (southernmost unit) will continue to serve the east/west hallway; both change out/gowning rooms, Master Mix A and Master Mix B, Storage Support room, and the south portion of Synthesis Lab. 1. Replace motor/blower assembly in AHU #1B to accommodate increased air flow. 2. Furnish and install a new VFD for #1B to allow for increased air flow. B. Existing Air Handler #2 will continue to service PCR and Gel Labs. C. Existing air handler 1A will be modified and will serve the new Extraction room and north/south hallway area. Since the new Extraction room needs to be maintained at negative 0.1? pressure, a new exhaust fan will be added to the exterior mechanical space along the east side of the building. 1. Install new exhaust blower, exhaust ductwork and support rail along building exterior at location shown on attached schematic. 2. Install new ceiling exhaust diffuser. 3. Furnish and install a bag-in/bag-out filter housing on the discharge of the new exhaust duct from the Extraction room. 4. Add control wiring as necessary to the new exhaust fan and AHU #1A. D. A new monitor/control panel is to be furnished and supplied adjacent to the two existing panels within the east/west hallway. This panel is required to allow for pressure, temperature and relative humidity control and measurement in the new Extraction room. E. Existing ductwork above ceiling to be modified as necessary to supply appropriate HEPA filters. F. Adjust air flow upon completion of installation. G. Contractor provide testing and re-certification after completion. 3. Contractor responsible for any and all electrical modifications required to accommodate the installation of the wall and creation of the new Extraction Room. A. Modify (remove or relocate) existing electrical as necessary within the Synthesis Room to accommodate installation of new wall panels. B. Power for new AHU #1B motor and new Extraction Room exhaust fan to be provided by existing electrical panel located within the Autoclave Room adjacent to the new Extraction Room. C. Contractor to annotate existing panel schedules and tag equipment/outlets as to power sources. 4. Contractor to provide as-builts and new sequence of operations upon completion of work. A. As-builts to be furnished in AutoCAD format, release 2000 or newer. 5. Unless otherwise specified in this Statement of Work all demoed materials are to be properly disposed of by the contractor. 6. Contractor will clean the renovation area daily. 7. Contractor shall perform final clean up of site. 8. Contractor shall protect equipment and work areas close to the construction area. 9. Contractor to provide a schedule of work for review and approval.

More opportunities from Department Of Defense → FA2521 45 Cons Pk

Same awarding agency

NAICS: 561990
New
Federal
Lifeguard Services at Patrick Space Force Base
Solicitation # FA252127QB013
Solicitation FA252127QB013 is a single-award, firm-fixed price, indefinite-delivery indefinite-quantity contract for non-personal aquatics management and lifeguard services at Patrick Space Force Base, Florida. This 100 percent small business set-aside requires the contractor to provide all personnel, uniforms, and supervision for the Fitness Center Mission Training Pool and the Outdoor Recreation Community Recreation Pool. The period of performance spans five years, consisting of a base year from November 1, 2026, to October 31, 2027, followed by four one-year option periods. The scope of work includes providing lifeguard services for community recreation, mission training, and water survival skills tests, while ensuring strict adherence to safety standards such as the Florida Administrative Code, Model Aquatic Health Code, and OSHA regulations. The contractor must ensure all lifeguards maintain current certifications in lifeguarding, CPR/AED, and First Aid from approved agencies like the ARC or YMCA. Key operational requirements include maintaining specific surveillance ratios, limiting continuous patron surveillance to 50 minutes, and conducting safety inspections at least three times per week. Extensive documentation is required through various Contract Data Requirements Lists, including daily rotation logs, training logs, incident reports, and verified employment records for lead lifeguards. Additionally, personnel must undergo rigorous background checks and installation records checks, particularly those working with minors. Award will be based on the best value to the government, considering technical acceptability, price, and schedule.
All Other Support Services

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS