Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on December 20, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- SW Piping Replacement ~ DD4, DD5, & DD6, PSNS & IMF, Bremerton, WA

Closed
N44255-07-R-3004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$7,236,814.41

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Naval Station BremertonBremerton, WA 98314, WA

Set-Aside

8A

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 2, 2007 to Jan 31, 2007. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Northwest
Contacts2 people available
OfficeSILVERDALE, WA, 98315-1101, USA
Office AddressSILVERDALE, WA, 98315-1101, USA
Contacts

Full Description

Show more
THIS PRE-SOLICITATION NOTICE IS BEING ADVERTISED ON AN SMALL BUSINESS SET-ASIDE, 8(a) COMPETITIVE CONTRACT. The Request for Proposal will be issued on or about December 19, 2006. A pre-proposal conference and site visit is scheduled for January 10, 2007. The proposal due date is scheduled for January 31, 2007. The NAICS Code for the solicitation is 237110. The size standard is $31,000,000.00. This is a design build project with a maximum funding limitation of $3,887,000.00. The estimate performance period for design and construction is 810 days from contract award. 1. PROJECT TITLE: SW Piping Replacement ~ DD4, DD5, & DD6, PSNS & IMF, Bremerton, WA 2. PROJECT DESCRIPTION: This project will provide all labor, materials, and equipment and associated costs to design and construct to replace portions of the salt-water (SW) piping at and between Drydock?s 4 and 5 (DD4, DD5) and at Drydock 6 (DD6), and minor incidental work. The salt-water piping to be replaced runs under Pier 3 and in the mechanical tunnel on each side of DD4 & DD5, and on each side and the north end of DD6. The existing line to be removed is cast iron or ductile iron with mostly mechanical joints and flanged valves and fittings. The lines have numerous taps of various sizes supplying salt-water to valve stations in the service galleries of DD4, DD5 and DD6. 3. SITE ANALYSIS: The site is located on Naval Station Bremerton, Bremerton, Washington. The Contractor is responsible for identifying and obtaining all permits and complying with all Federal, State, and local regulatory requirements associated with this work. 4. PROPOSAL SUBMISSION & BASIS OF EVALUATION: The Government will award one Firm-Fixed Price design-build contract resulting from this solicitation to the responsible, responsive small business proposer whose proposal conforms to the solicitation considered to be the ?best value? to the Government, price and technical factors considered. Proposers will be evaluated on: Factor I: Relevant Experience; Factor II: Past Performance; Sub-factor A: Construction & Design, Sub-factor B: Safety; Factor III: Basis of Design; Factor IV: Price. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiated with any or all proposers; use of tradeoff processes when it may be in the best interest of the Government; to consider award to other than the lowest priced proposers or other than the highest technically rated proposer; and to award to the proposer submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. Proposers should be advised THE GOVERNMENT INTENDS TO EVALUATE PROPOSALS AND AWARD WITHOUT DISCUSSION OR ANY CONTACT CONCERNING THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable terms. The solicitation, including plans and specifications, will be available for viewing and downloading at http://esol.navfac.navy.mil, upon issuance. Prospective Offerors must and should immediately register themselves on the web site. Amendments will be posted on the web site. This will normally be the only method of amendment distribution; therefore, it is the OFFEROR?S RESPONSIBILITY TO CHECK THE WEB SITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Offeror?s must also be registered in the Contractors Central Registration (CCR) in order to participate in this procurement at http://www.ccr2000.com. All inquiries should be submitted to Ms Mona Carlson (360) 476-0680 or via email mona.carlson@navy.mil.

More opportunities from Department Of Defense → Navfacsyscom Northwest

Same awarding agency

NAICS: 237990
Federal
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Solicitation # N4425526R0005
The Naval Facilities Engineering Systems Command (NAVFAC) is soliciting proposals for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD). The project primarily involves heavy and civil engineering waterfront facilities, as well as commercial and institutional construction, located at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) at Naval Base Kitsap in Bremerton, Washington. The contract has a maximum aggregate estimated value of 15 billion dollars over a potential 10-year period, consisting of a five-year base period and one five-year option. Major task orders are expected to range from 2 billion to 6 billion dollars, though smaller task orders for Early Contractor Involvement and Alternative Technical Concepts may be issued. Each MACC holder is guaranteed a minimum of 1 million dollars. The solicitation is unrestricted and open to full competition, though large businesses must provide an acceptable small business subcontracting plan. Evaluation factors include experience, price, and small business utilization and participation. A key initial component is a seed project task order for Alternative Technical Concepts (ATC) Package 1 Marine, which focuses on innovative strategies to improve cost, schedule, and constructability. This specific effort includes the delivery of an ATC report and a facilitated panel discussion led by the contractor's key personnel. Offerors must be registered in the System for Award Management (SAM) and provide comprehensive documentation, including bonding capacity via a surety form, financial questionnaires, and historical small business utilization data. All work is subject to Davis-Bacon Act wage determinations for Kitsap County, Washington.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS