Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Y--N191 VOYA 335009 REHAB RAINY AND ASH PAVEMENT PRESERVATION PROJECT AT VOYAGEURS NATIONAL PARK IN MINNESOTA.

Awarded
140P2026R0045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, solicited under number 140P2026R0045 and issued by the National Park Service’s DSC Contracting Services Division under the Department of the Interior, is a sole-source Small Business Set-Aside for pavement preservation services at Voyageurs National Park under PMIS number 335009, specifically targeting the Rainy and Ash Road Rehabilitation project. The work includes asphalt parking lot restoration and restriping for two lots, mill and overlay for six additional lots with ABA-compliant signage, removal and replacement of approximately 1,200 square feet of concrete walkway, and associated demolition, earthwork, and utility improvements, all governed by Minnesota Department of Transportation standards and structured around Division 01 through 33 specifications. The contract is awarded as a firm fixed-price agreement with a proposed period of performance from August 3, 2026, to May 18, 2027, and includes five optional line items for additional locations, which the government may exercise unilaterally within 30 days after award. The NAICS code 237310 applies, with a small business size standard of $45 million, and only small business offerors may compete. All materials must be delivered in manufacturer’s original sealed packaging, using biodegradable or recyclable materials per ASTM D5834, and paint must arrive in 5-gallon containers with batch certificates. Performance is subject to stringent quality control protocols requiring the contractor to conduct all inspections, testing, and documentation, including Structural Tests and Special Inspections, with weekly site inspections conducted jointly with the Contracting Officer. The evaluation will be conducted under the Best Value Continuum Tradeoff Process, where non-price factors—project experience and key personnel, past performance, and project schedule—are jointly considered approximately equal in importance to price, with priority given to proposals demonstrating strong small business participation. Offerors must submit two electronic volumes: one technical proposal detailing personnel qualifications and project approach, and one business proposal containing the SF 1442, SF 24 bid guarantee, pricing schedule, representations, subcontracting worksheet, and general references. Key personnel—including a project manager, superintendent, quality control manager, and safety manager—must be identified and cannot be substituted during the first 45 days except under exceptional circumstances, with notifications required within 15 days for any changes. All payments must be processed electronically through the U.S. Treasury’s Invoice Processing Platform

General Info

Rehabilitation of park roads with asphalt, ADA compliance, small business set-aside, August 2026-May 2027.

Agency

Department Of The Interior → Dsc Contracting Services DivisionView Agency

Contract Value

$5,140,158.26

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO

Set-Aside

NONE

Awardee

YORKSHIRE INDUSTRIES LLCView Profile

Award Issued Date

Documents

(15)

Solicitation 140P2026R0045 for Rehab Rainy and Ash Pavement Preservation Project

PDFifb

Amendment 0005 to Solicitation 140P2026R0045

PDFamendment

B08 Attachment 3 Drawings VOYA Pavement Restoration

PDFdrawings

P-0037313 VOYA Pavement Preservation Geotechnical Report

PDFgeotechnical-report

Wage Determination MN20260231 for Heavy and Highway Construction in Minnesota

PDFwage-determination

Contract Price Schedule for Solicitation 140P2026R0045 Pavement Preservation

PDFcontract-price-schedule

Solicitation 140P2026R0045 for Rehab Rainy and Ash Pavement Preservation Project

PDFifb

Solicitation 140P2026R0045 Past Performance Questionnaire

DOCXpast-performance

Amendment 0003 to Solicitation 140P2026R0045

PDFamendment

Amendment 0004 to Solicitation 140P2026R0045

PDFamendment

Amendment 0002 to Solicitation 140P2026R0045

PDFamendment

VOYA PMIS 335009 Pavement Preservation Project Specifications

PDFspecifications

Report on Limitations on Subcontracting for Contract 140P2026R0045

XLSXsubcontract-percentage-worksheet

Amendment 0001 to Solicitation 140P2026R0045 - Site Visit Information

PDFamendment

General References Form for Offerors

PDFgeneral-references

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
View Agency Profile
Office AddressDenver, CO, 80225, USA

Full Description

Show more
N191 VOYA 335009 REHAB RAINY AND ASH PAVEMENT PRESERVATION PROJECT AT VOYAGEURS NATIONAL PARK IN
MINNESOTA.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--Rehabilitation of Water and Wastewater System
Solicitation # 140P2026B0003
Solicitation 140P2026B0003 is a sealed bid invitation for bid issued by the National Park Service Denver Service Center for the rehabilitation of water and wastewater systems at the Curecanti National Recreation Area in Colorado. This total small business set-aside project focuses on replacing and upgrading critical infrastructure at Elk Creek and Lake Fork, including primary and secondary water distribution, wastewater collection, septic tanks, leach fields, and lift stations. The scope also encompasses electrical and mechanical upgrades, the installation of a supervisory control and data acquisition (SCADA) system for remote monitoring, and the creation of a potable water truck filling station. The estimated project value ranges from 5 million to 15 million dollars, with a performance period extending from July 20, 2026, to October 31, 2028. The contract will be awarded to the lowest responsible bidder based on a proposal consisting of five base line items and four optional line items. Key requirements include the submission of original bid bonds, the maintenance of comprehensive liability and workers compensation insurance, and the implementation of a written accident prevention plan compliant with OSHA standards. Technical specifications mandate adherence to various regulatory standards, including ADA compliance for entry ramps and specific cybersecurity protocols for facility equipment. Administrative requirements include electronic invoicing via the Treasury's Invoice Processing Platform and strict limitations on the substitution of key personnel during the first 120 days of performance. Bids must be submitted by 1400 local time on September 29, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
Federal
Z--Yellowstone - Mammoth Water Line Replacement
Solicitation # 140P2026B0005
Solicitation 140P2026B0005 is a construction project for the National Park Service, Department of the Interior, to replace the water line in the Mammoth Housing Area of Yellowstone National Park, Wyoming. The project aims to re-establish a looped water system and ensure year-round water service to apartments. The scope of work includes installing approximately 750 linear feet of 6-inch HDPE water main and new water services to apartments, reconnecting and relocating fire hydrants, and rehabilitating or replacing faulty pressure-regulating valves. The estimated contract value ranges from 250,000 to 500,000 dollars, though it is currently noted as an unfunded requirement with a high expectation that funds will become available. This procurement is set aside for SBA Certified Women-Owned Small Businesses under NAICS code 237110, with a size standard of 45 million dollars. The estimated period of performance is 120 calendar days, which may include winter construction and weather-related shutdowns. Due to the rural location and the fact that the park remains open, contractors must implement unique material delivery logistics and schedule activities to minimize visitor impact. Bids are to be submitted via sam.gov by September 15, 2026, and will be opened and read according to FAR Part 14 procedures. The primary point of contact for this effort is Vicki Freese-Supler.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS