Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Y--YELL 310402 Grant Wastewater Treatment Plant and Collections and Canyon Collections

Awarded
140P2025R0102Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The YELL 310402 Grant Wastewater Treatment Plant and Collections and Canyon Collections project is a sealed bid solicitation under contract number 140P2025R0102 issued by the Department of the Interior’s National Park Service via the Denver Service Center Contracting Services Division. The project involves the complete replacement of the Grant Village Wastewater Treatment Plant and the rehabilitation of the Grant and Canyon Village wastewater collection systems within Yellowstone National Park, with a total estimated construction value exceeding $10 million. Performance is scheduled to begin on August 4, 2025, and must be completed by November 30, 2028, inclusive of winter shutdowns and final cleanup, with work to commence within ten calendar days after receipt of the Notice to Proceed. The solicitation, originally issued on September 26, 2025, has undergone multiple amendments refining construction specifications, design drawings, evaluation criteria, and submission procedures, with the most recent amendments dated January 2026 updating chemical resistant coatings, blower and pump specifications, diesel generator sets, and evaluation factors for award, particularly emphasizing management approach, safety protocols, and risk mitigation. The proposal submission deadline was extended to January 29, 2026, at 2:00 p.m. Mountain Time, and proposals must be submitted electronically in two volumes—Technical and Business/Price—with each submission adhering to strict formatting, file size, and naming conventions, and sent to designated email addresses with a required subject line format. The technical scope includes compliance with numerous federal, state, and industry standards such as ASTM, ANSI, NFPA, and ISO 9001, with detailed requirements for materials including ductile iron pipe, stainless steel passivation per ASTM A380, concrete work, and UV disinfection systems. Contractors must reference and adhere to over 70 engineering drawings and specifications covering process systems, structural components, landscape restoration, geotechnical data, and regulated building materials, including asbestos and lead paint assessments conducted in 2021. Compliance with environmental regulations is mandated through prior aquatic resource delineations identifying wetlands and waters of the United States, with all work subject to inspection under FAR 52.246-12 and acceptance at the site by the Government’s Contracting Officer. Key personnel including Project Manager, Superintendent, Quality Control Manager, and Safety Manager must be assigned, with substitutions restricted for the first 1

General Info

Replacement and rehabilitation of Yellowstone wastewater systems, $10M+, 975-day schedule, strict environmental compliance.

Contract Value

$109,487,800

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

39

140P2025R0102 Project Experience Questionnaire

DOCX, High priority: read this firstpast-performance
High

Amendment 0001 to Solicitation 140P2025R0102

PDF, High priority: read this first1 page · amendment
High

Amendment 0002 to Solicitation 140P2025R0102

PDF, High priority: read this first1 page · amendment
High

Amendment 0003 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 to Solicitation 140P2025R0102

PDF, High priority: read this first1 page · amendment
High

Amendment 0005 to Solicitation 140P2025R0102

PDF, High priority: read this first1 page · amendment
High

Amendment 0006 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0007 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0008 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0009 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0010 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0010 to Solicitation 140P2025R0102 for Grant Wastewater Treatment Plant

PDF, High priority: read this first80 pages · amendment
High

Amendment 0011 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 0012 to Solicitation 140P2025R0102

PDF, High priority: read this first2 pages · amendment
High

Amendment 11 to Solicitation 140P2025R0102 for Grant Wastewater Treatment Plant

PDF, High priority: read this first15 pages · amendment
High

B08 Section J Attachment 10 Geotechnical Data Report Part 3

PDF, High priority: read this first53 pages · geotechnical-data-report
High

Geotechnical Data Report for Yellowstone WWTP Replacement and Rehabilitation

PDF, High priority: read this first90 pages · geotechnical-data-report
High

Grant Bid Question Tracker 0006

PDF, High priority: read this first144 pages · q-and-a
High

Small Business Subcontracting Plan for Contract 140P202xxxxxxxx

DOCX, High priority: read this firstsubcontracting-plan
High

Solicitation 140P2025C0040 Grant Wastewater Treatment Plant Q&A

PDF, High priority: read this first70 pages · q-and-a
High

Solicitation 140P2025R0102 Amendment 07 Q&A Attachment

PDF, High priority: read this first91 pages · amendment
High

Solicitation 140P2025R0102 for Grant Wastewater Treatment Plant Construction

PDF, High priority: read this first3 pages · ifb
High

Solicitation 140P2025R0102 for Grant Wastewater Treatment Plant Construction

PDF, High priority: read this first113 pages · ifb
High

Solicitation 140P2025R0102 Q&A Amendment 08 Attachment 0008

PDF, High priority: read this first99 pages · q-and-a
High

YELL 310402 Specifications for Grant Village Wastewater Treatment Plant Replacement and Collection Systems Rehabilitation

PDF, High priority: read this first2800 pages · specifications
High

Yellowstone National Park WWTP Geotechnical Data Report Part 2

PDF, High priority: read this first39 pages · geotechnical-data-report
High

310402 - Grant WWTP Prebid Meeting Sign-In Sheet 10-22-25

PDF, Low priorityprebid-sign-in-sheet
Low

Aquatic Resources Delineation Report for Yellowstone Wastewater and Water Treatment Projects August 2022

PDF, Low priority521 pages · other
Low

Attachment 5 General References Form

DOCX, Low prioritygeneral-references
Low

B08 Section J Attachment 2 Drawings 1A Grant Village WWTP

PDF, Low priority149 pages · other
Low

B08 Section J Attachment 2 Drawings 1B Grant Village WWTP

PDF, Low priority148 pages · other
Low

B08 Section J Attachment 2 Drawings 1C Grant Village WWTP

PDF, Low priority292 pages · other
Low

B08 Section J Attachment 2 Drawings Canyon Collections System

PDF, Low priority94 pages · other
Low

B08 Section J Attachment 2 Drawings Grant Collections

PDF, Low priority73 pages · other
Low

Geophysical Letter Report for Yellowstone Canyon Village Seismic Investigation

PDF, Low priority97 pages · other
Low

Regulated Building Materials Survey for Grant Village WWTP Project

PDF, Low priority98 pages · other
Low

Solicitation 140P2025R0102 - Past Performance Questionnaire

DOCX, Low prioritypast-performance
Low

image_0002.png

PNG

image_%281%29_0002.png

PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

10 updates
PhaseAwarded
Posted

Solicitation

Deadline changed

Response deadline time changed from 8:00 PM UTC to 9:00 PM UTC on Dec 18, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Dec 18, 2025 to Jan 7, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 7, 2026 to Jan 29, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts

Full Description

Show more
YELL 310402 Grant Wastewater Treatment Plant and Collections and Canyon Collections

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

about 24 hours ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 24 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS