Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Veterans Affairs was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1AZ--Renovate SPD Phase IV Project 526-25-100

Awarded
Federal
Solicitation #
36C24226B0013

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
This Design-Build Major Maintenance and Repair (M&R) project for US Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin, is a firm fixed-price task order issued under the NMACC III IDIQ. The project is estimated between $5 million and $10 million with a projected period of performance of 350 calendar days. The scope of work includes base requirements for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional work items for roof and boiler replacement at the Station/UPH Building. Technical requirements encompass architectural remodels of the first and second floors, electrical power and lighting updates, fire alarm system installation, and mechanical demolition and installation compliant with International Building and Plumbing Codes. The contract is awarded to the lowest total priced responsive offeror, with proposals due by December 17, 2026. Key administrative requirements include the submission of performance and payment bonds within ten business days of award and adherence to the Davis-Bacon Act wage determinations for the Milwaukee area. Due to the nature of the facility, contractors must comply with strict physical security and force protection programs, including valid security clearances for personnel handling classified information and restrictions on portable electronic devices in classified work spaces. All invoicing must be processed through the Invoice Processing Platform.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with composite modular materials and carpet tiles, fully renovating restrooms with new lavatories and vanities, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation equipment, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting interior surfaces and installing new signage throughout the facility. This solicitation, number 70LGLY27RSSB00001, is a total small business set-aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by December 2, 2026, and must be submitted electronically to the Contracting Officer. Award evaluation is based on price, past performance, and corporate relevant experience, with non-cost factors holding equal importance to price. The contractor is required to provide performance and payment bonds and must adhere to the Davis-Bacon Act and ADA accessibility guidelines.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope repairs, new roofing, exterior wall systems, and interior reconfiguration. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project involves site improvements such as paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The estimated contract value is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary line items: ELIN 0001 for building renovation and ELIN 0002 for the removal and replacement of paving. Proposals are due by December 2, 2026, and the award will be based on the lowest price. Bond requirements vary by proposal value, with those exceeding $150,000 requiring bid, payment, and performance bonds. Key personnel requirements include a stand-alone Quality Control Manager, while the Superintendent and Site Safety and Health Officer roles may be combined if the individual is qualified for both. The contract mandates compliance with ADA/ABA accessibility guidelines, OSHA safety requirements, and the Davis-Bacon Act. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work involves addressing Risk Assessment Code Level 4 (RAC-4) deficiencies, specifically extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials, labor, supervision, and performance testing for a complete and usable system. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm-Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the award of the task order. Award selection is based on price and MACC past performance. Key requirements include adherence to Unified Facilities Guide Specifications (UFGS), cybersecurity standards per UFC 4-010-06, and strict hazardous material labeling and disposal protocols. Proposals must be submitted via the PIEE portal, with a final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between $10 million and $25 million. The scope involves a critical two-phase execution where the facility must remain operational and mission-capable between phases, requiring strict scheduling and multiple mobilization and demobilization cycles. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of all design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. Additional work includes demolition, HVAC, fire protection, electrical upgrades, and the construction of a 400 square foot addition for forklift battery charging. The contract is awarded based on price and MACC past performance. Key requirements include compliance with EM 385-1-1 safety standards, International Building Code, and various cybersecurity and CMMC Level 1 requirements. The contractor must utilize the Wide Area Workflow (WAWF) system for invoicing and provide electronic Davis-Bacon Act certified payrolls. Performance and payment bonds are required, and the project involves a multi-stage inspection process including preliminary, acceptance, and final inspections. Proposals are to be submitted via the PIEE portal, with the final deadline for submission specified as December 7, 2026, at 11:00 am local time.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is designated as a Small Business set-aside, including SBA certified VOSB, SDVOSB, WOSB, and HUBZone SB. The scope involves replacing a roof with persistent leaks, requiring the contractor to perform a visual inspection and adhere to national, state, and local building codes, as well as EPA and OSHA regulations. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM, and proposals must be submitted to Tammy Swallows by December 14, 2026. The contract is a single lump sum award based on best value, evaluated through a 100-point system focusing on price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include a valid Indiana Contractor's License, Davis-Bacon Act wage rate certification, and specific insurance coverages, including automobile liability and workers' compensation. Once a Notice to Proceed is issued, the contractor must provide a sequenced construction schedule within 10 days and begin work within 14 days. The project includes a one-year workmanship guarantee and a two-year manufacturer's product warranty, with payment terms set at Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for a single lump sum contract to remove and replace damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with local, state, and federal building codes, while reusing existing push bars and closure systems. All work must adhere to current EPA and OSHA regulations, and the contractor must provide a one-year guarantee of workmanship and manufacturer product warranties. The contract is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is required on December 1, 2026, and proposals are due by December 11, 2026. Award will be based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must provide a detailed cost breakdown, a timeline for substantial completion, proof of a valid Indiana Contractor's License, and a W9. Insurance requirements include automobile liability and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must start work within 14 days of proposal acceptance.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Department of Veterans Affairs is awarding a construction contract under solicitation number 36C24226B0013 to renovate the Sterile Processing Department (SPD) Phase IV at the James J. Peters VA Medical Center in Bronx, New York, with a focus on upgrading mechanical, architectural, electrical, plumbing, and fire protection systems to improve workflow, infection control, and patient care. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract with a NAICS code of 236220 and an estimated value between $1 million and $5 million, requiring performance and payment bonds, compliance with federal and VA construction codes, and adherence to stringent technical specifications outlined in comprehensive 100% submission drawings and master specifications. The project includes demolition, new interstitial framing, HVAC system modifications, upgraded ventilation, electrical enhancements, installation of an Avigilon video surveillance system, and specialized flooring using Stonclad GS epoxy mortar and Stonseal SK6 sealer, all subject to precise material standards and manufacturer guidelines. The contract mandates a 270-calendar-day performance period from notice to proceed, with a mandatory pre-bid site visit held on January 6, 2026, and bids due by 2:00 PM EST on February 5, 2026, submitted only in hard copy to the contracting office in Bronx, NY; electronic submissions are explicitly prohibited. All submissions must include stamped and sealed drawings from licensed professionals covering architectural, structural, mechanical, electrical, plumbing, fire protection, and life safety systems, along with certified product data sheets for coatings and sealants referenced in the specification. Contractors must comply with Davis-Bacon wage determinations for Bronx County, maintain materials in sealed, climate-controlled storage, and adhere to VA’s electronic invoicing system (EIPP). The Contracting Officer, Patricia Cordero, and Contracting Officer’s Representative, Antonino Sacchetti, oversee administration, with inspections and acceptance occurring on-site following technical verification against ASTM, NFPA, IBC, and other referenced standards, ensuring all systems operate independently and integrate seamlessly with existing building infrastructure.

General Info

Renovation of SPD logistics at Bronx VA, SDVOSB set-aside, $1-$5M, 700-day performance period.

Contract Value

$3,486,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

NY, USA

Set-Aside

SDVOSBC

Award Issued Date

Potential End Date

December 30, 2027

Documents

30
DOCX, High priority: read this first2 pages · sow
High
DOCX, High priority: read this firstifb
High
DOCX, High priority: read this first2 pages · amendment
High
DOCX, High priority: read this first7 pages · amendment
High
PDF, High priority: read this first3 pages · specifications
High
DOCX, High priority: read this first78 pages · ifb
High
DOCX, High priority: read this first74 pages · ifb
High
DOCX, High priority: read this first13 pages · presolicitation
High
PDF, High priority: read this first1 page · drawings
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first16 pages · specifications
High
PDF, High priority: read this first16 pages · specifications
High
PDF, High priority: read this first9 pages · specifications
High
PDF, High priority: read this first12 pages · specifications
High
PDF, High priority: read this first8 pages · specifications
High
PDF, High priority: read this first798 pages · specifications
High
PDF, High priority: read this first795 pages · specifications
High
DOCX, High priority: read this first2 pages · certification
High
PDF, High priority: read this first22 pages · wage-determination
High
DOCX, Low priorityaward
Low
PDF, Low priority1 page · certificate
Low
PDF, Low prioritysite-visit-sign-in-sheet
Low
PDF, Low priority1 page · other
Low
PDF, Low priority2 pages · product-data-sheet
Low
PDF, Low priority4 pages · product-data
Low
PDF, Low priority4 pages · product-data
Low
PDF, Low priority9 pages · other
Low
PDF, Low priority3 pages · other
Low
PDF, Low priority12 pages · other
Low
PDF, Low priority8 pages · other
Low

Read all 30 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jan 29, 2026 to Feb 5, 2026. The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Contacts1 person available
OfficeALBANY, NY, 12208, USA
Office AddressALBANY, NY, 12208, USA

Full Description

Show more
Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY
Project No. 526-25-100; Renovate SPD Phase IV at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES GENERAL SCOPE/Statement of Work. This is a construction contract for the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 to furnish all supervision, labor, equipment, and material necessary to renovate our Sterile Processing Department logistic area and its surrounding spaces in building 100 of the James J. Peters VA Medical Center. All work shall be completed in accordance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, specifications, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. Contractors are required to visit the site and meet with the Contracting Officer s Representative (COR) prior to bidding. The goal is to enhance patient care by improving workflow efficiency, sterilization processes, and infection control within the SPD Department. The work will also include design and system upgrades to support mechanical and HVAC requirements in alignment with current VA standards. All work shall be executed in accordance with the architectural drawings, design narratives, and specifications prepared by the architectural firm.
All trade work must be done by a certified master plumber, master electrician, etc. and work must be completed in 8-hour increments to ensure fire safety standards. FDNY fire safety protocols must be followed. Work is not considered complete unless a sanitation ticket is provided for the construction debris.
No wiring, pipes, equipment or construction debris is to be left abandoned. Contractor will be responsible to remove any wiring, pipes, and equipment causing an obstruction to the area and/or project. Scope of Work: SPD Logistics Consolidation and Workflow Improvements Develop a consolidated layout of the SPD Logistics area and adjacent spaces in accordance with AE firm 100% stamped drawings. Create mechanical modifications to improve processing flow of sterile medical instruments as per design guide/TIL. Enhance environmental controls to maintain a sterile environment and high-level infection control.
Mechanical and Architectural Renovations Redesign room configurations as needed to accommodate new equipment and functions. Follow the AE drawings and specs for guidance. Perform wall demolition, install new doors, windows, louvers, and equipment support pads as required. Bulk Supply, clean supply, bulk receiving, OR Clean storage, clean equipment and Anteroom Spaces will receive new Stonhard flooring. Contractor will prep the floor, grind/sand it down, level and repair the floor as needed to receive the new flooring. Walls for the same spaces will receive diamond stainless steel plates to protect the walls from damage. Install ventilation systems, grated walkway installation, and restoration painting of all affected walls, ceilings, and floors. Provide electrical upgrades necessary to support new mechanical and medical equipment as per drawings.
HVAC System Adjustments and Upgrades Modify the existing HVAC system serving the SPD to support the new room layout and equipment. Provide new exhaust ventilation per equipment manufacturer specifications and the VA HVAC Design Manual and TIL. Provide two new air handling units York brand custom made. These units should be mounted in the interstitial as high in the beam pocket as possible using new steel supports and hanger rods as required per manufacture installation recommendations. Ensure proper room pressurization to meet VA infection control requirements. Install room temperature controls, humidification systems, and alarm integration in accordance with VA HVAC Design Manual standards. All control shall to be done by ITC to ensure full compatibility
Electrical All equipment shall be provided with a disconnect switch as per NEC requirements, and the disconnect shall be installed in an accessible location. 7 cameras in total should be installed as directed by the VA COR. Provide a new Network Video Recorder (NVR) in the Security Equipment Room of the existing facility. The new NVR shall be connected to the existing security system network. NVR shall have 90-day recording capacity. The SSTV shall be monitored/controlled by the centralized SCC in Building 16. Ensure the NVR is connected to the main security control center. All wiring should be in conduits as per NEC and VA design guides. SSTV shall be able to be fully integrated with the PACS. Cameras should be Avigilon; SSTV system should be Avigilon control center 7 software to be compatible with our system. PACS should be HID. Equipment provided as part of this project will be compatible with the VA Security Project.  The VA Security Project will utilize C-Cure 9000 for the PACS software which will require iSTAR Access Controllers. The Contractor shall furnish, install, configure, test, and commission a complete Avigilon video surveillance system for Building 100. The system shall be comprised of Avigilon-manufactured components and fully compliant with:
VA Master Specifications Division 28 23 00 Video Surveillance VA IT Design Manual (latest edition) ANSI/TIA-568-D (Structured Cabling Standards) ANSI/TIA-606-B (Administration and Labeling Standards) NFPA 70 (NEC) and applicable NFPA codes
System Requirements
The CCTV system shall include, but not be limited to, the following components and services:
Head-End Equipment
Avigilon HD NVR4 Premium network video recorder, configured with RAID storage and redundant power. Dedicated Rack. Storage sized to provide a minimum of 30 days continuous recording at full resolution for all installed cameras. Uninterruptible Power Supply (UPS) sized to support all CCTV head-end components for a minimum of 30 minutes under full load. Network switches, PoE media converters, patch panels, and all related accessories should be installed in the nearest telecom room.
Cabling Infrastructure
CAT6A copper cabling for all camera drops, tested and certified per TIA-568-D. Fiber optic cabling (singlemode or multimode as required) with LC terminations, tested per TIA-568.3-D. Complete labeling and administration per TIA-606-B and VA standards.
Cameras & Software
Avigilon IP cameras as shown on contract drawings, including lenses, mounts, housings, and environmental enclosures. Avigilon Control Center (ACC) software licensing, configured for VA Police user access and system administration.
Location of Head-End
The CCTV head-end, including NVR, UPS, switches, and all related components, shall be installed in the Police Station, Building 100, First Floor, in a dedicated secure, rack-mounted configuration.
Submittals & Approvals
The Contractor shall prepare and submit shop drawings for approval by the VA prior to procurement or installation. Shop drawings shall include:
Camera locations and schedules Cable routing and riser diagrams One-line diagrams and rack elevations Storage calculations and system architecture
Written VA approval is required before work may proceed.
Testing, Commissioning & Training
The Contractor shall test and certify all cabling. Perform full functional testing of all cameras, recording, playback, failover, and UPS backup. Provide final as-built drawings and test documentation. Conduct training for VA Police personnel on system operation, user administration, and maintenance.
Deliverable The Contractor shall provide a fully operational, VA-approved Avigilon CCTV system meeting all performance, reliability, and compliance requirements, and shall deliver all required documentation and training prior to project closeout.
Phasing and Continuity of Operations Develop and provide a phasing plan for construction activities, if necessary. The plan must minimize disruption to ongoing SPD operations and maintain continuity of service throughout the project duration.
Design Standards and Compliance
All design and construction activities must comply with: VA Design Criteria, including the VA HVAC Design Manual and the TIL Applicable infection control, safety, and facility engineering guidelines (ICRA) Federal building codes and regulations Place of performance
The site for the work to be performed will be the Main building (Building 100) Wing GA in the James J Peters Veterans Affairs Medical Center.
Inspection
If inspection services are required for equipment or a performed task, then an inspection shall be done by the VA COR/POC upon completion. Upon completion of the maintenance service, the COR/POC will perform the inspection in the presence of the contractor personnel, prior to the contractor personnel leaving the facility. This inspection will ensure that all equipment is returned to full-functioning conditions. No invoices will be processed for payment prior to the completion of POC inspection. If the service is routine and/or performance based, then inspections may not occur for every service date but may occur periodically as part of a Quality Assurance Surveillance Plan (QASP). If this is the case, then a QASP will need to be provided as a separate document.
Drawings, and Other Attachments
To be provided with solicitation posted. Safety/Site Control: The contractor must install ICRA hard barriers and Anteroom with level 4 paint finish for dust and/or infection control prior to start of construction. Furnish and install temporary construction barrier walls with secure 45-minute rated construction access door and hardware. The construction barrier walls shall be 1-hour rated, extend to the underside of deck above and all penetrations are fire stopped. Supply, install and maintain walk-off tacky mats. Shall replace tacky mats in a timely fashion when they are soiled. Maintain negative pressure machine in the project site and vent to outside of the Contractors abide with all in-house policies such as safety, ID badges, security, etc. Alternate entrance is always secured and never to be left open while contractor is off site. The Contracting Officer or his/her designee will notify the contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work and hold the Contractor in default. Quality Control/Assurance: Follow the manufacturer s instructions for inspecting and installing new equipment and fixtures. Provide submittal log of all material and applicable equipment, procedures, and certifications to the COR for approval, prior to starting construction. Any drawings provided may not be up to date and must be field verified by contractor for accuracy. Provide updated MS project schedule upon request by Engineering Services withing 2 working days. Maintenance: Provide a critical spare parts list with pricing and warranty information for all installed fixtures. Coordination Plan: If any utilities need to be shut off for demolition or installation, a coordination plan shall be provided to the COR for approval, at least 72 hours prior to work being performed. Cleanup and Disposal: Housekeeping The contractor should maintain a clean work environment, keeping the surfaces in the area free of dust and debris. Dry sweeping or compressed air for cleanup is not authorized. At the end of each work period (not longer than 8 hours), the contractor shall use a HEPA vacuum to ensure all dust and debris have been properly collected and contained for disposal. If the COR and/or designated representative finds the area unacceptable, the contractor, at his/her own cost, shall re-clean until acceptance is gained. The contractor is to perform the necessary corrective action immediately without exception. Disposal of Trash and Hazardous Waste: The contractor shall be responsible for the cleanup and removal of all trash and debris from VA property after the Government s final acceptance of work. The contractor shall comply with local/state/federal/national, OSHA, EPA, and all other applicable codes, ordinances, and regulations governing the proper handling, disposal, and removal of all waste and debris. Deliverables: Project deliverables include the following: MS project scheduled within 45 days of NTP. Include procurement of materials and critical path activities. Testing and Acceptance All equipment shall be tested prior to the Government s final acceptance. All testing reports and specification documents must be provided to the Contracting Officer Representative, if applicable. General:
All work is to be coordinated with the VA COR to allow for minimum disruption to the building occupants. All rigging, hoisting, lifting and moving of materials and equipment necessary to perform the work is to be provided by the Contractor. Damage to any existing surfaces caused by the contractor are to be repaired to the original condition and at the contractor s expense. All materials, installation practices, debris disposal, and work performed as part of these specifications are to meet all applicable codes including but not limited to, USEPA and OSHA. At the completion of the project, all rubbish, tools and surplus materials are to be removed, and the work area is left completely clean. Any work, material or supplies which have not been specifically mentioned but are reasonably implied and is necessary for the safe and satisfactory completion of the entire project are to be included and installed by the Contractor. All materials are to be installed and completed in a first-class workman like manner and in accordance with the best industry standards. Any materials installed which are not in an orderly and neat workman like appearance are to be removed and replaced when so directed by the VA COR at the contractor s expense. All workers and staff of the Contractor working on site shall be required to have VA issued identification badges for all of his/her personnel working on VA property. Anyone observed without VA identification will be asked to leave VA property. No VA identification, no work, no exception. 13. No work or the ordering of materials outside of the scope of work is to be done without approval of change order.
Site Conditions: 1. All work is to be coordinated with VA COR. 2. This is an occupied facility. 3. A material and equipment staging area is to be coordinated and confirmed with the VA COR. The staging area is considered unsafe. 4. The contractor is to leave no area unsafe at the end of the working day. 5. It is the contractor s responsibility to verify all existing conditions and dimensions prior to submitting the bid. 6. It is the contractor s responsibility to address unforeseen conditions and dimensions.
Submittals: 1. Submit, for review and approval to the VA COR, the manufacturers / supplier s spec sheets, shop drawings (if requested), and any other requested information for all materials to be used as part of this project. 2. Submit only materials which are known to be fully compatible with the actual installation conditions.

Cost Liability: The James J. Peters VA Medical Center does not assume responsibility and does not bear any liability for the cost incurred by a bidder in the preparation and submittal of a bid proposal in response to this request for proposals. The contractor shall be responsible for the actions of all individuals provided to work for the VA under this contract. If damages arise for work performed by contractor provided personnel, the contractor shall be responsible for all the necessary resources to remedy the incident. The Contractor shall be responsible for ensuring all provided personnel are properly licensed to operate a motor vehicle if operating a motor vehicle on VA property is required. 7. Protection of Work and Property 7.1. The contractor shall continuously maintain adequate protection of all his work from damage and shall protect the James J. Peters VA Medical Center property from injury or loss arising out of this contract. The contractor shall make good any such damage, injury, or loss, except such as may be directly caused by agents or employees of the James J. Peters VA Medical Center. 7.2. The contractor will erect barricades and railings, give warnings, display lights, screens or signs and exercise precautions as may be reasonably necessary to prevent injury or damage. Additional Work Should additional work be required, which is beyond the scope of this request for proposal but is related to the overall contract, the vendor will be requested to submit a written proposal and upon approval, a purchase order will be issued to authorize the work. Warranty:
1. The contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation will provide the capacities and characteristics specified. The contract further guarantees that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects will be repaired by the contractor at his own cost. 2. Final inspection is to be done by the Contractor, VA COR, Using Agency, and end users onsite.
Estimated Completion Time: 400 Calendar Days. PERMITS AND RESPONSIBILITIES: The Contractor shall, without additional expense to the Government after award of the contract, be responsible for all damages to persons or property. The Contractor shall take proper safety precautions to protect the worksite, the workers, the public and the property of others. Contractor shall also be responsible for all materials delivered and work per-formed until completion and acceptance of the entire work. PROJECT MANAGEMENT: Contractor shall assign a dedicated full-time site superintendent for the duration of the project in its entirety. The site superintendent and Project Manager must have a minimum of 5 years of experience directly related to project requirement. The Project Manager shall have the necessary training, knowledge, and experience required to help ensure the timely and successful completion of the project and all related duties. The Contractor will submit qualifications of their Project Manager to the Contracting Officer s Representative within 10-days of contract award and have to be approved by the VA COR. The Project Manager shall be the on-site representative of the Contractor and shall oversee all aspects of day-to-day project operations and shall serve as the Contractor s primary point of contact, including the ability to meet with the Contracting Officer, at the Government s convenience, for meetings to discuss project status and/or contractual issues as necessary.
Autodesk Build Construction management platform:
Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts.  There is no user, license, or subscription fee to the contractor for using this cloud-based platform. The contractor shall accomplish and complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Upon granting access, staff shall complete the required ACC training through ProductivityNOW platform within 12 Calendar days. Upon successful completion of the training, the contractor shall submit certificates of completion to COR NLT 2 business days. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in the contract amount provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. The contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor s ability to maintain the required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.
ADMINISTRATION: Accident Reporting: In the event an accident occurs of Government personnel or property, the Contractor shall provide a report to the Contracting Officer and COR in writing that shall include the following: (1) the time and date of occurrence; (2) the place of occurrence; (3) a list of personnel directly involved; and (4) a narrative or description of the accident to include chronological order of the accident and circumstances; (5) corrective action to prevent future occurrences.
Federal Holidays: Federal law (5 U.S.C. 6103) establishes the public holidays. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday). Federal holidays include: New Year s Day, Martin Luther King Jr. Day, President s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran s Day, Thanksgiving, and Christmas. Invoice: Payment will be made upon receipt of a properly prepared, itemized invoice, validated by the COR, and submitted through the Tungsten Network. A properly prepared invoice will resemble the contract line items reflected in the Price/Cost Schedule and contain: Invoice Number and Date Contractor s Name and Address Accurate Purchase Order Number Dates service performed. Location of service performed. Total amount due
Estimated Completion Time: 400 Calendar Days. PERMITS AND RESPONSIBILITIES: The Contractor shall, without additional expense to the Government after award of the contract, be responsible for all damages to persons or property. The Contractor shall take proper safety precautions to protect the worksite, the workers, the public and the property of others. Contractor shall also be responsible for all materials delivered and work per-formed until completion and acceptance of the entire work. PROJECT MANAGEMENT: Contractor shall assign a full-time site superintendent for the duration of the project in its entirety. The site superintendent and Project Manager must have a minimum of 5 years of experience directly related to electrical trade and work on electrical distribution systems. The Project Manager shall have the necessary training, knowledge, and experience required to help ensure the timely and successful completion of the project and all related duties. The Contractor will submit qualifications of their Project Manager to the Contracting Officer s Representative within 10-days of contract award. The Project Manager shall be the on-site representative of the Contractor and shall oversee all aspects of day-to-day project operations and shall serve as the Contractor s primary point of contact, including the ability to meet with the Contracting Officer, at the Government s convenience, for meetings to discuss project status and/or contractual issues as necessary. AUTODESK CONSTRUCTION CLOUD (ACC) ACCESS REQUIREMENT Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR). at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts.  There is no user, license, or subscription fee to the contractor for using this cloud-based platform.
Contractor shall complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days from contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Upon granting access, staff shall complete required ACC training through ProductivityNOW platform within 12 Calendar days. Upon successful completion of training, contractor shall submit certificates of completion to COR NLT 2 business days. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. Contractor shall complete ACC training within that period. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.
ADMINISTRATION: Accident Reporting: In the event an accident occurs of Government personnel or property, the Contractor shall provide a report to the Contracting Officer and COR in writing that shall include the following: (1) the time and date of occurrence; (2) the place of occurrence; (3) a list of personnel directly involved; and (4) a narrative or description of the accident to include chronological order of the accident and circumstances; (5) corrective action to prevent future occurrences.
d. Federal Holidays: Federal law (5 U.S.C. 6103) establishes the public holidays. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday). Federal holidays include: New Year s Day, Martin Luther King Jr. Day, President s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran s Day, Thanksgiving, and Christmas. e. Invoice: Payment will be made upon receipt of a properly prepared, itemized invoice, validated by the COR, and submitted through the Tungsten Network. A properly prepared invoice will resemble the contract line items reflected in the Price/Cost Schedule and contain: Invoice Number and Date Contractor s Name and Address Accurate Purchase Order Number Dates service performed. Location of service performed. Total amount due
SAFETY REQUIREMENTS Contractor shall comply with VA Guidelines, and OSHA safety standards.
PERIOD OF PERFORMANCE All work must be completed within 700 calendar days of notice to proceed. This period of performance includes reasonable durations for all submittals to be approved prior to beginning construction. Contractor is required to notify the COR/CO prior to any approved work to be performed at the JJP VAMC. WARRANTY The contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation will provide the capacities and characteristics specified. The contractor further guarantees that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects will be repaired by the contractor at their own cost. INSPECTION A final inspection for quality assurance shall take place by VA personnel prior to acceptance of the work. Applicable NAICS Code: 236220. Estimated Completion Time: 400 Calendar Days from receipt of NTP. Award will depend on availability of funds at time of award. This procurement is a 100% set-aside for a Service-Disabled Veteran-Owned Small Business (SDVOSB). Prospective contractors must be registered with the SBA Small Business Administration at https://search.certifications.sba.gov/ prior to submitting a bid: Prospective contractors must be registered and current in the System for Award Management (SAM) database prior to contract award: https://www.sam.gov/portal/public/SAM/ Bids will only be accepted from SDVOSBs that are determined to be responsible and responsive contractors. Prospective contractors must be approved under NAICS Code 236220, with a Size Standard of $45.0 Million. The NAICS Code selected has been approved as the most appropriate for the project related tasks and SOW. This NAICS Code will not be subject for discussion or change. The Magnitude of Construction/ construction cost range for this project is between $1-5 Million. A bid bond will be required, and performance and payment bonds will be required upon award of contract. The solicitation will be released on or around December 8, 2025. The bid submittal address, date and time will be included in the solicitation. Specifications and plans will be available for download from the Sam website at https://www.sam.gov Amendments to this solicitation will be posted on the Sam.gov website as well. Bidders are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time of bid opening. All bid submissions shall be in hardcopies; faxed or e-mailed bids will not be accepted. E-mail questions concerning the solicitation to Patricia Cordero at Sign up to see this detail. Interested responses and Capability Statements to this Pre-Solicitation notice must include your firm s capability statement in writing (email) and must be received no later than December 3, 2025, at 4pm Noon EST. Email: Sign up to see this detail. No telephone inquiries will be accepted.

More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)

Same awarding agency

NAICS: 811310
New
Federal
J030--Diesel Generator Service
Solicitation # 36C24227Q0163
The Department of Veterans Affairs, Network Contracting Office 02, has issued a Sources Sought Notice for diesel generator service at the James J. Peters VA Medical Center in Bronx, New York. This market research effort aims to identify capable contractors to inspect, test, maintain, and repair nine diesel generators. The scope of work includes annual and semi-annual preventive maintenance, fuel-quality testing and analysis, and emergency repair services. All work must adhere to strict safety and technical standards, including NFPA 110, NFPA 70, NFPA 99, NFPA 101, VHA Directive 1028, and OSHA 29 CFR 1910 regulations. The period of performance is designated as one six-month period, with annual maintenance required within 30 days of award and semi-annual maintenance occurring in the final 30 days of the term. The requirement is classified under NAICS code 811310 with a size standard of $12.5 million. There is currently no specified set-aside status for this requirement. Interested parties must submit a comprehensive response to Chris Weider, including a capability statement, SAM UEID numbers, proof of certifications, and examples of similar work performed. The government is using this process to determine the viability of potential set-asides for various socio-economic categories, such as service-disabled veteran-owned, veteran-owned, women-owned, HUBZone, or 8(a) small businesses. This notice is for information-gathering purposes only and does not constitute a solicitation for a contract award.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
Federal
R425--FY 27 Service (Base+4) | NYH Energy Control Procedures/LOTO Services | 630
Solicitation # 36C24227Q0091
The New York Harbor VA Healthcare System is seeking a contractor to implement a comprehensive Energy Control Procedure (ECP) and Lockout Tagout (LOTO) program across three facilities: the Manhattan, Brooklyn, and St. Albans VA Medical Centers. The scope of work includes the development and installation of up to 1,600 equipment-specific procedures during the base year, integration into the ISIQ safety management system, the provision of laminated full-color procedures on flip-chart baseplates, and the installation of aluminum energy source identification labels. The contractor is also required to provide initial training for at least 30 VA employees and conduct annual audits to ensure compliance with OSHA 29 CFR 1910.147 and ANSI/ASSE Z244.1 standards. This procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 541330. The contract structure consists of one base year running from October 31, 2026, to October 30, 2027, with four subsequent option years extending through October 30, 2031. Award will be based on a comparative evaluation of quotes, considering technical capability, past performance, total price including options, and a signed Limitations on Subcontracting Certification. Interested offerors must submit a capability statement, a completed pricing worksheet, and the signed certification to the contracting officer by December 4, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
Federal
Z1DA--528A8-22-814 Consolidate Primary Care Reception
Solicitation # 36C24227B0006
The Department of Veterans Affairs Network Contracting Office 02 is soliciting bids for the consolidation of Primary Care Reception at the Samuel S. Stratton VA Medical Center in Albany, New York. This construction project, identified as Project 528A8-22-814, involves the first-floor scope of work to consolidate primary care units and relocate the Agent Cashiers office, including the creation of a new reception area and waiting lobby. The procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated contract magnitude between $1 million and $5 million. The performance period is 295 calendar days, and the project is governed by NAICS code 236220. The scope of work encompasses general construction, plumbing, HVAC, electrical, and fire suppression commissioning, requiring strict adherence to architectural drawings and manufacturer specifications. Key requirements include the submission of a Quality Control Plan and an Environmental Protection Plan. Bidders must certify their SDVOSB status, provide their current Experience Modification Rate (EMR), and demonstrate a clean safety record with no more than three serious OSHA or EPA violations in the past three years. The contract is subject to the Davis-Bacon Act for prevailing wage rates and includes Buy American requirements for construction materials. Bids are due by December 8, 2026, and must be held firm for 60 calendar days.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 11 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS