Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Solicitation 36C77626B0026 is a competitive design-bid-build project for the Department of Veterans Affairs to implement EHRM infrastructure upgrades and data center construction at the Malcom Randall VA Medical Center in Gainesville, Florida. The project involves the construction of a new 3,931 square foot data center building, including a dedicated data center room and supporting mechanical, electrical, and HVAC spaces, as well as the replacement of all data infrastructure across 59 telecom rooms campus-wide. The scope includes the demolition of an existing temporary trailer and the installation of a new generator. The contract is a firm-fixed-price award set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with a construction magnitude estimated between 20 million and 50 million dollars. The period of performance is 921 calendar days, with work required to begin within 10 days of the notice to proceed. Award is based on the lowest lump sum bid for the base item. Key requirements include strict adherence to VHA Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA) protocols, compliance with the Davis-Bacon Act for wage rates, and the use of specific brand-name systems for security, fire alarms, and building automation to ensure operational integrity. Contractors must provide a comprehensive Quality Control Plan and maintain a constant CQC presence on-site. Proposals were due by September 24, 2026, with submissions required via email to the designated contract specialist.
General Info
Place of Performance
Gainesville, FL, 32608, USASet-Aside
Timeline
Organization & Contact Information
Full Description
Bid Log - Gainesville - Public
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → Pcac (36C776)
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS