Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on January 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS

Closed
36C77624B0026_1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract titled Y1DA--589A5-21-700 pertains to the upgrade of the Electronic Health Record Modernization (EHRM) infrastructure in Topeka, Kansas, under solicitation number 36C77624B0026_1. It is a Service-Disabled Veteran-Owned Small Business (SDVOSBC) set-aside opportunity, emphasizing the participation of small businesses owned by service-disabled veterans. The project is managed by the VA's Office of the Pittsburgh VA Medical Center (Pcac) located in Independence, Ohio. The contract aims to enhance the existing EHR infrastructure, supporting the VA’s ongoing efforts to modernize healthcare delivery systems. The solicitation was posted on December 12, 2024, with a response deadline set for January 7, 2025. Interested vendors are encouraged to review the opportunity through the provided link on SAM.gov. The primary point of contact for inquiries is Richard Webb, a Contract Specialist at the VA, reachable via email or phone. The contract scope and size are not specified, but the project underscores the VA’s commitment to improving healthcare technology infrastructure through targeted upgrades, with a focus on engaging small businesses within the veteran community.

General Info

EHRM infrastructure upgrades contract for Veterans Affairs in Topeka, Kansas, for SDVOSB.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

OH, USA

Set-Aside

SDVOSBC

Documents

50

21-116 EHR Infrastructure Upgrades - Plumbing Drawings

PDF, High priority: read this firstspecifications
High

367C77622C0043 - EHRM Infrastructure Upgrades - Specifications Attachment A

PDF, High priority: read this first27 pages · specifications
High

36C77624B0026 0001 Amendment - Site Visit Sign in Sheet

DOCX, High priority: read this first2 pages · amendment
High

36C77624B0026 Amendment 0002 - EHRM Infrastructure Upgrades

DOCX, High priority: read this firstamendment
High

36C77624B0026 Amendment 0003

DOCX, High priority: read this first2 pages · amendment
High

36C77624B0026 Amendment 0004

DOCX, High priority: read this first2 pages · amendment
High

36C77624B0026 Amendment 0006

DOCX, High priority: read this first2 pages · amendment
High

36C77624B0026 Amendment 0007

DOCX, High priority: read this firstamendment
High

36C77624B0026 - EHRM Infrastructure Upgrades Construction

DOCX, High priority: read this first70 pages · ifb
High

589A5-21-700 Colmery-O'Neil VA Medical Center EHRM Infrastructure Upgrades - Specifications

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka EHRM Basis of Design - Blast IFB

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka EHRM IFB R2 Drawings Vol 3

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka EHRM IFB R2 Drawings Vol 3

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka EHRM Infrastructure Upgrades - Specifications Vol 2

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka EHRM Survey Locations Markup

PDF, High priority: read this firstspecifications
High

589A5-21-700 Topeka KS EHRM Contractor Technical Questions 2

DOCX, High priority: read this first22 pages · q-and-a
High

589A5-21-700 Topeka KS EHRM Technical Questions 1

DOCX, High priority: read this first17 pages · q-and-a
High

89A5-21-700 Colmery-O'Neil VA Medical Center EHRM Infrastructure Upgrades

PDF, High priority: read this firstspecifications
High

Addendum 1 Vol 2 - General Notes and Floor Plan Legend

PDF, High priority: read this firstamendment
High

Addendum1_Vol3_2of3_20241209

PDF, High priority: read this firstamendment
High

Addendum 1 Vol 3 (3 of 3) - 20241209

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 36C77624B0026

DOCX, High priority: read this first2 pages · amendment
High

Colmery-O'Neil VA Medical Center - Asbestos and Lead Survey Report

PDF, High priority: read this firstspecifications
High

Drawing M503 - Mechanical Details (Bancroft Project)

PDF, High priority: read this first1 page · specifications
High

EHR Infrastructure Upgrades - Building 19 Data Center

PDF, High priority: read this firstspecifications
High

EHRM Contractor Parking and Laydown Map/List

PDF, High priority: read this firstspecifications
High

EHRM Infrastructure Upgrades - Addendum 1

PDF, High priority: read this firstamendment
High

General Decision Number KS20240058 - Wage Determination Topeka, KS

PDF, High priority: read this firstwage-determination
High

PEC Project 230415-000: Topeka VA Geotechnical Engineering Services Report

PDF, High priority: read this firstspecifications
High

Project 21-116 EHRM Infrastructure - Drawings Vol 2-7

PDF, High priority: read this firstspecifications
High

Project 21-116 EHRM Infrastructure Upgrades - Addendum #1

PDF, High priority: read this firstamendment
High

Project 21-116 EHRM Infrastructure Upgrades - Drawings Vol 2-8

PDF, High priority: read this firstspecifications
High

Project 21-116 EHRM Infrastructure Upgrades - Rack Elevations Drawings

PDF, High priority: read this firstspecifications
High

Project 589A5-21-700 - Section 23 21 13 Hydronic Piping

PDF, High priority: read this first12 pages · specifications
High

Project 589A5-21-700 Topeka EHRM SOW

DOCX, High priority: read this first1 page · sow
High

Submittal 024: Pipe, Valve & Fittings - VA VISN 15 ECM-02

PDF, High priority: read this firstspecifications
High

Topeka EHRM IFB R2 Drawings Vol 2

PDF, High priority: read this firstspecifications
High

Topeka EHRM IFB R2 Drawings Vol 2

PDF, High priority: read this firstspecifications
High

Topeka EHRM Infrastructure Upgrades - Drawings Vol 1

PDF, High priority: read this firstspecifications
High

VAAR 852.219-75 Limitations on Subcontracting - Construction

DOCX, High priority: read this firstcertification
High

VA VISN 15 ECM-02 Submittal 23 - Perma Pipe Fittings

PDF, High priority: read this firstspecifications
High

36C77624B0026 EHRM Infrastructure Upgrades Construction - Site Visit Sign-in Sheet

PDF, Low priorityspecial-notice
Low

589A5-21-700_19550421_Steam Distro Plot Plan

PDF, Low priorityother
Low

Government Answers to Contractor Questions

DOCX, Low priority1 page · q-and-a
Low

Topeka EHRM Infrastructure Upgrades - Site Visit Instructions

DOCX, Low priority2 pages · special-notice
Low

Attachment+10+-589A5-21-700_Topeka+EHRM_IFB+R2+Drawings_Vol+91-129.pdf

PDF

Attachment+17+-589A5-21-700_Topeka+EHRM_IFB+R2+Drawings_Vol+1_19-133.pdf

PDF

Attachment+18+-589A5-21-700_Topeka+EHRM_IFB+R2+Drawings_Vol+2_1-110.pdf

PDF

Attachment+5+-589A5-21-700_Topeka+EHRM_IFB+R2+Drawings_Vol+2_181-240.pdf

PDF

Attachment+8+-589A5-21-700_Topeka+EHRM_IFB+R2+Drawings_Vol+3_1-90.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Nov 15, 2024 to Dec 3, 2024.

Deadline changed

Response deadline changed from Dec 3, 2024 to Dec 20, 2024.

Deadline changed

Response deadline changed from Dec 20, 2024 to Jan 7, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 7, 2025 to Jan 10, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Richard WebbContract Specialist

Full Description

Show more
Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
542-22-700 | EHRM Construct Infrastructure Upgrade | Coatesville, PA |
Solicitation # 36C77626Q0138
The Department of Veterans Affairs, Veterans Health Administration, is conducting market research via a Sources Sought Notice for the EHRM Infrastructure Upgrades Construction project at the Coatesville VA Medical Center in Pennsylvania. This project involves site preparation, demolition of existing structures, and the installation of critical telecommunications infrastructure, specifically plenum rated OM4 and OS2-10GB fiber and CAT 6A copper cabling. The scope requires all cables to be terminated, labeled, and documented, with an additional 20 percent capacity provided as specified in the project drawings. The anticipated procurement will be a competitive, firm-fixed-price contract using a design-bid-build approach, with solicitation expected in late December 2026. The magnitude of construction is estimated between 20 million and 50 million dollars, falling under NAICS code 236220. The estimated period of performance is 770 calendar days from the Notice to Proceed. The project is currently designated as a Service-Disabled Veteran-Owned Small Business set-aside. Interested respondents must submit a capabilities statement by October 26, 2026, including company details, a statement of interest, and a letter of intent regarding bonding capacity. Technical qualifications must demonstrate experience with projects of at least 20 million dollars in occupied medical facilities, including work with uninterrupted service lines, infection control, and off-hours execution. Additionally, the government is evaluating the use of Project Labor Agreements in accordance with FAR 22.5, requiring respondents to complete a PLA questionnaire.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 5 days
View Details
NAICS: 541611
New
Federal
Bronx EUL Development Opportunity Sources Sought
Solicitation # 36C77626Q0277
The Department of Veterans Affairs is seeking expressions of interest from qualified developers for an Enhanced-Use Lease opportunity at the James J. Peters VA Medical Center in the Bronx, New York. The project involves the redevelopment of an approximately 1.6-acre parcel to construct, finance, operate, and maintain a parking structure with at least 900 spaces to alleviate significant on-campus parking shortages. Under the terms of the potential lease, which can extend up to 99 years, the developer must provide free parking for Veterans and their families during standard weekday business hours. The government has clarified that due to land and density constraints, mixed-use developments including housing are not anticipated for this specific site. This Sources Sought Notice is intended for market research to determine the best acquisition strategy and is not a formal solicitation for proposals. The VA is particularly interested in the capabilities of Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses, specifically those capable of performing at least 51 percent of the development. Interested respondents must demonstrate a proven track record in real estate development, property management of parking facilities, and the ability to secure non-VA financing. Responses, including company business information, qualification summaries, and answers to a government questionnaire, are due by November 10, 2026.
Administrative Management and General Management Consulting Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
Solicitation 36C77626B0011 is a sealed bid invitation for the Community Living Center (CLC) Phase III Minor Construction project at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and involves the construction of a new 10-bed CLC Cottage (Building 28). The facility will be a single-story building of approximately 7,500 square feet featuring steel framing with a brick veneer. The estimated contract value ranges between 10 million and 20 million dollars, with a target cost limit of 12 million dollars. Award will be granted to the responsible bidder offering the most advantageous price for the base bid, with several deductive alternates available to reduce scope if the base bid exceeds available funding. The scope of work includes all labor, materials, and equipment for general construction and associated site work, including specific requirements for medical gas systems, resinous urethane flooring, and standardized brand-name systems for security cameras (Motorola Avigilon), physical access control (HID), and fire alarms (Siemens Desigo). Contractors must adhere to strict safety and quality protocols, including Pre-Construction Risk Assessments (PCRA) and VHA Infection Control Risk Assessments (ICRA). The project is subject to Davis-Bacon Act wage determinations for Howard County, Texas, and requires performance and payment bonds. Bids must be submitted electronically, and the final deadline for receipt of offers was extended to October 22, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS