Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on February 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--EHRM Infrastructure Upgrades - Construction - Togus, ME (402-22-700)

Closed
36C77626Q0100Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Togus VA Medical Center 1 VA Center, Augusta, OH, 04330-6795, USA

Set-Aside

SDVOSBC

Documents

1

Sources Sought Notice for EHRM Infrastructure Upgrades Construction Togus ME 36C77626Q0100

DOCX, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Zachary E. PenhollowContract Specialist

Full Description

Show more
SYNOPSIS:
INTRODUCTION: This Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is conducting a market survey and is seeking potential sources for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades Construction project at the Togus VA Medical Center (VAMC) located at 1 VA Center, Augusta, Maine 04330-6795. PROJECT DESCRIPTION: The Department of Veteran Affairs is in the process of migrating from its existing Computerized Patient Record System (CPRS) to the new EHRM platform. The scope of the project includes, but is not limited to, the following infrastructure improvements: The architectural demolition, reconfiguration, expansion, and renovation of existing spaces. The architectural construction of new finished spaces, doors, and flooring systems. The structural alteration of existing structural components, and construction of new structural equipment support, Electrical upgrades including electrical panels, normal and critical power distribution, bonding, Uninterrupted Power Supplies (UPS), lighting, and new power outlets. The installation and programming of Building Automation System (BAS) equipment and interfaces, Upgrades to existing HVAC, reprogramming of existing controls, and the installation of new HVAC and new controls. The modification of existing plumbing to avoid Telecommunication Rooms, and the installation of new plumbing to support new mechanical systems, and interior drainage. Upgrades to data communication infrastructure including new data outlets, patch panels, seismic rated IT racks, cable management, in building as necessary. This includes the re-cabling of all existing data cabling within the entire campus to CAT 6A. Upgrade of the fiber infrastructure backbone, campus wide both within buildings and between buildings and all associated civil site construction and landscaping. Civil site work, including the installation of concrete duct banks, installation of new pre-cast manholes, the excavation and repair of existing building waterproofing, and the restoration of site conditions. The abatement of asbestos and lead based paint, including the preparation of an abatement plan in accordance with the requirements of the Maine Department of Environmental Protection. The installation of a radon mitigation system, including the preparation of detailed working drawings that are signed by a radon mitigation contractor registered with the State of Maine. Fire Suppression Upgrades including new gaseous suppression systems, and the modification of existing fire sprinkler systems. New fire sprinkler system for the new MCR Building. Fire Alarm Upgrades. Firestopping and fire caulking for all wall and floor penetrations within the project scope. Physical security upgrades including Physical Access Control, intrusion detection, and security cameras, as shown on the contract drawings. The project buildings include: 200, 200E, 201, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, 221, 232, 235, 238, 240, 248, 255, 300, BQ1, BQ3, BQ4, BQ27, BQ32, BQ69, 248, MRI, and site. PROCUREMENT INFORMATION: The proposed project will be a competitive, firm-fixed-price contract utilizing the Design-Bid-Build approach (Final Specifications and Drawings will be provided). The anticipated solicitation will be issued either as a Request for Proposal (RFP) in accordance with FAR Part 15, considering Technical Approach, Project Challenges/Phasing & Schedule and Price factors. The results and analysis of the market research will finalize the determination of the procurement method. The type of socio-economic set-aside, if any, will depend upon the responses to this notice and any other information gathered during the market research process. This project is planned for advertising in April 2026. In accordance with Veteran Affairs Acquisition Regulation (VAAR) 836.204, the magnitude of construction is between $50,000,000.00 and $100,000,000.00 (Note that the VAAR magnitude of construction is closer to the lower end of this range). The North American Industry Classification System (NAICS) code 236220 (size standard $45.0 million) applies to this procurement. The duration of the project is currently estimated at 730 calendar days from the issuance of a Notice to Proceed. The services for this project will include providing all construction related services such as: providing labor, materials and equipment required to complete the project as per contract documents prepared by an independent Architect-Engineer firm. CAPABILITY STATEMENT: Respondents shall provide a general capabilities statement to include the following information: Section 1: Provide company name, Unique Entity Identifier (UEI), company address, Point-of-Contact name, phone number and email. Section 2: Provide company business size based on NAICS code 236220. Also, provide business type (i.e., Large Business, Small Business, Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-Owned Small Business, Hub Zone Small Business, etc.). Section 3: Provide a Statement of Interest in the project. Section 4: Provide the prime contractor s available bonding capacity in the form of a letter of intent from your bonding company with this submission. *Please ensure that the individual bonding capacity is in line with the VAAR Magnitude of Construction listed above. Section 5: Provide the type of work your company has performed in the past in support of the same or similar requirement. This section is IMPORTANT as it will help to determine the type of socio-economic set-aside, if any. Please provide the following in your response: No more than three (3) contracts that your company has performed within the last seven (7) years that are of comparable size, complexity, and scope to this requirement. Include the project name, project owner and contact information as this person may be contacted for further information, project scope, project size (Example: square footage), building use (Example: Medical Facility, Office Building, etc.), project dollar value, start and completion dates. Provide specific examples that relate aspects of previous projects to the proposed project. Describe specific technical skills and key personnel your company possess to perform the requirements described under description of work. Describe your Self-Performed** effort (as either a Prime or Subcontractor). Describe Self-Performed work in terms of dollar value and description. **Self-Performed means work performed by the offeror themselves, NOT work performed by another company for them for any of the project examples provided. Section 6: Project Labor Agreement (PLA) - A PLA is defined as a pre-hire Collective Bargaining Agreement with one (01) or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). The PLA questionnaire must be filled out and returned with the Sources Sought response. The questionnaire can be found at the end of this document. In accordance with Federal Acquisition Regulation (FAR) 22.5 - Labor Agreements for Federal Construction Projects, Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will- (1) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. (c) Agencies may also consider the following factors in deciding whether the use of a project labor agreement is appropriate for the construction project: (1) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. (2) There is a shortage of skilled labor in the region in which the construction project will be sited. (3) Completion of the project will require an extended period of time. (4) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. (5) A project labor agreement will promote the agency s long term program interests, such as facilitating the training of a skilled workforce to meet the agency s future construction needs. (6) Any other factors that the agency decides are appropriate. See FAR Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and FAR Clause 52.222-34 Project Labor Agreement for further details. It is requested that interested contractors submit a response (electronic submission) of no more than nine (9) single sided pages, single-spaced, 12-point font minimum that addresses the above information (this is inclusive of the PLA questionnaire). This response must be submitted as a single application-generated (not scanned) PDF document that is less than or equal to 4MB in size. Please note that hard copies will not be accepted. Please also include a cover page, which includes, at a minimum: the company s name, address, Unique Entity Identifier (if available), socio-economic status, point-of-contact name, phone number, and e-mail address. Responses must include the Sources Sought number and project title in the subject line of their e-mail response. Submissions (responses) shall be submitted via email to the primary point of contact Contract Specialist Zachary E. Penhollow (zachary.penhollow@va.gov) and Contracting Officer Joelle Mascarenas (joelle.mascarenas@va.gov) listed below by 24 February 2026 at 13:00 Hours EST. The Capabilities Statement submitted in response to this Sources Sought shall not be considered to be a bid or proposal. This notice is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. No evaluation letters and/or results will be issued to the respondents. After completing its analyses, the Government will determine whether to limit competition among the small business categories listed above or proceed with full and open competition as other than small business. At this time no solicitation exists; therefore, please do not request a copy of the solicitation. If a solicitation is released it will be synopsized in Contract Opportunities at https://sam.gov/. It is the potential offeror's responsibility to monitor this site for the release of any solicitation or synopsis. Contracting Office Address: VHA Program Contracting Activity Central (VHA-PCAC) 6100 Oak Tree Blvd. Suite 300 Independence, OH 44131
Primary Point of Contact: Zachary E. Penhollow Contract Specialist zachary.penhollow@va.gov
Secondary Point of Contract: Joelle Mascarenas Contracting Officer joelle.mascarenas@va.gov

PROJECT LABOR AGREEMENT (PLA) QUESTIONNAIRE (Please respond to the questions below)
1. Is your company familiar with Project Labor Agreement (PLA) and its use on construction projects?
Yes/No
Comments:
2. Would your company likely submit a proposal for the VA construction solicitation that requires the use of a PLA?
Yes/No
Comments:
3. If VA requires a PLA, would your proposed construction cost likely to increase or decrease and what is the likely percentage of cost increase or decrease?
Comments:
4. Does the VA requirement to use of a PLA on a construction project restrict competition?
Yes/No
Comments:
5. Do you expect subcontractor resistance should VA requires the use of a PLA on this construction solicitation?
Yes/No
Comments:
6. Do you have additional comments regarding the use of a PLA for this project?
Comments:
7. Has your Firm participated in projects with PLA agreements?
Yes/No   a. Were there cost increases, labor shortages, or other issues experienced on contracts that had the labor union clauses? If so, please provide more details.   b. Did pricing remain as expected? If not, did it increase or decrease as a result?
c. Was the project completed on time?   d. Was craftsmanship acceptable (or better) than a level typically seen on other non-union projects.

--- End of PLA Questionnaire ---

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS