Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--EHRM Infrastructure Upgrades Tier 1 Construction 695-21-700 Milwaukee

Closed
36C77626R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract for Project #695-21-700 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin, is a service-disabled veteran-owned small business (SDVOSB) set-aside under NAICS code 236220 with a total estimated value between $50 million and $100 million, targeting comprehensive infrastructure upgrades across the entire VA campus. The procurement is a design-bid-build approach requiring a firm fixed price for both design and construction components, submitted as lump sum amounts in whole dollars, with an expected performance period of 1,460 calendar days starting upon notice to proceed. Offerors must be certified by the SBA as an SDVOSB at time of submission and award, and proposals must be submitted via email in three separate volumes—Technical, Price, and Administrative—each constrained to 25 pages with strict formatting requirements including Times New Roman 12-point font, single spacing, and searchable PDF format with page numbers and company name in headers or footers. The solicitation prohibits hard copies and limits emails, including attachments, to under 5MB. The scope of work includes electrical and HVAC upgrades, communication infrastructure improvements, fiber network deployment, physical security enhancements, hazardous material abatement, demolition of structures and debris, and installation of a fully functional controls system capable of stand-alone operation for each mechanical system. Contractors must coordinate closely with VA OIT personnel, the Construction Period Services Architect/Engineer, Commissioning Agent, and VA Shops staff, while adhering to strict phasing requirements, shift scheduling for evening and overnight work in sensitive areas, and detailed site-specific documentation. All materials must be delivered in original sealed manufacturer packaging with clear markings indicating brand, type, color, manufacture date, batch number, and safety instructions. Quality assurance mandates inspections by qualified personnel meeting ASTM E699 criteria, with system demonstrations, leak testing, and electrical certifications required prior to final acceptance. Payment is governed by monthly AIA G702/G703 forms submitted electronically via VA’s EIPP system or X12 EDI standards, contingent on submission of photographic milestones, safety reports, waste manifests, progress reports, and updated schedules. Contractors must comply with extensive federal and VA-specific clauses covering ethical conduct, anti-kickback provisions, information security protocols, IT accessibility, and mandatory annual cybersecurity training, with violations potentially leading to payment withholding or contract termination. Bonding and insurance requirements are mandatory, and all personnel must

General Info

Veterans Health Administration seeks SDVOSB for $50-100M EHRM infrastructure upgrades at Milwaukee VA Medical Center.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Milwaukee, WI, 53295, USA

Set-Aside

SDVOSBC

Documents

62

36C77626R0002 EHRM Infrastructure Upgrades Tier 1 Milwaukee - Technical Question Tracking Sheet

PDF, High priority: read this firstq-and-a
High

695-21-700 EHRM Infrastructure Upgrades - Technology Demolition Plans

PDF, High priority: read this firstspecifications
High

695-21-700 Mechanical Demolition Plans

PDF, High priority: read this firstspecifications
High

695-21-700 Specs Part 3 HVAC Ductwork Specifications

PDF, High priority: read this firstspecifications
High

Amendment 0001 to Solicitation 36C77626R0002

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 36C77626R0002

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 36C77626R0002

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 36C77626R0002

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 36C77626R0002

DOCX, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 36C77626R0002

PDF, High priority: read this firstamendment
High

Amendment 4 to Milwaukee VAMC EHRM Infrastructure Upgrades Bid Documents

PDF, High priority: read this firstamendment
High

Amendment 5 to Milwaukee VAMC EHRM Infrastructure Upgrades Bid Documents

PDF, High priority: read this firstamendment
High

Amendment 5 to Project 695-21-700 EHRM Infrastructure Upgrades Milwaukee WI

PDF, High priority: read this firstamendment
High

DBA Rates Milwaukee County Construction 2026

PDF, High priority: read this firstwage-determination
High

FP&C Project 1751.74 Architectural and Technology Drawings

PDF, High priority: read this firstspecifications
High

Milwaukee VAMC 695-21-700 Interior Wood Doors Specifications Part 2

PDF, High priority: read this firstspecifications
High

Past Performance Questionnaire (PPQ) for Proposal Submission

DOCX, High priority: read this firstpast-performance
High

Project Information Sheet for Contractors - Attachment 35

DOCX, High priority: read this firstsow
High

RFP 36C77626R0002 EHRM Infrastructure Upgrades Construction

PDF, High priority: read this firstrfp
High

RFP 36C77626R0002 EHRM Infrastructure Upgrades Tier 1 Construction Milwaukee

DOCX, High priority: read this first3 pages · presolicitation
High

RFP Attachment 12 - Drawings 695-21-700 Part 5

PDF, High priority: read this firstdrawings
High

RFP Attachment 18 - Drawings 695-21-700 Part 11

PDF, High priority: read this firstdrawings
High

RFP Attachment 19 - Drawings 695-21-700 Part 12 - Storm Plan and Profile

PDF, High priority: read this firstdrawings
High

RFP Attachment 20 - Drawings 695-21-700 Part 13

PDF, High priority: read this firstspecifications
High

RFP Attachment 21 - Fire Protection Demolition Drawings 695-21-700 Part 14

PDF, High priority: read this firstdrawings
High

RFP Attachment 23 - Drawings 695-21-700 Part 16

PDF, High priority: read this firstspecifications
High

RFP Attachment 29 - Drawings 695-21-700 Part 22 - Building Demolition Plans

PDF, High priority: read this firstspecifications
High

RFP Attachment 30 - Drawings 695-21-700 Part 23

PDF, High priority: read this firstdrawings
High

RFP Attachment 31 - Building 111 Demolition Plans 695-21-700

PDF, High priority: read this firstspecifications
High

RFP Attachment 32 - Drawings 695-21-700 Part 25

PDF, High priority: read this firstspecifications
High

RFP Attachment 33 - Drawings 695-21-700 Part 26 - Building Demolition Plans

PDF, High priority: read this firstspecifications
High

RFP Attachment 34 - Building 144 First Floor Demolition Plan Drawings

PDF, High priority: read this firstspecifications
High

RFP Attachment 3 - Division Cost Breakdown - Milwaukee

XLSX, High priority: read this firstcost-breakdown
High

RFP Attachment 4 - Limitations on Subcontracting - Milwaukee

DOCX, High priority: read this firstcertification
High

RFP Attachment 5 - Specifications 695-21-700 Part 1

PDF, High priority: read this firstspecifications
High

RFP Attachment 6 - Interior Wood Doors Specifications 695-21-700 Part 2

PDF, High priority: read this firstspecifications
High

RFP Attachment 7 - HVAC Duct Specifications 695-21-700 Part 3

PDF, High priority: read this firstspecifications
High

RFP Attachment 8 - Drawings 695-21-700 Part 1

PDF, High priority: read this firstdrawings
High

VA Milwaukee EHRM Infrastructure Upgrades Specifications Part 1

PDF, High priority: read this firstspecifications
High

VA Milwaukee EHRM Technical Questions Tracking Sheet FINAL 7-15-26

PDF, High priority: read this firstq-and-a
High

36C77626R0002 Site Visit Sign-In Sheet for EHRM Infrastructure Upgrades

PDF, Low prioritysite-visit-sign-in-sheet
Low

695-21-700 Civil Full 7-10-26

PDF, Low priorityother
Low

695-21-700 ELEC Full 7-10-26

PDF, Low priorityother
Low

695-21-700 Fire Protection Enlarged Plans and Demolition Floor Plans

PDF, Low priorityspecifications
Low

695-21-700 Plumbing Enlarged Plan

PDF, Low priorityspecifications
Low

Amended RFP Attachment 2 Site Visit Milwaukee

PDF, Low prioritysite-visit
Low

RFP Attachment 11 - Drawings 695-21-700 Part 4

PDF, Low priorityother
Low

RFP Attachment 13 - Drawings 695-21-700 Part 6

PDF, Low priorityother
Low

RFP Attachment 14 - Drawings 695-21-700 Part 7

PDF, Low priorityother
Low

RFP Attachment 15 - Drawings 695-21-700 Part 8

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Jun 17, 2026 to Jun 24, 2026.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 24, 2026 to Jul 28, 2026. The notice description changed.

Notice updated

Response deadline changed from Jul 28, 2026 to Jul 30, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts2 people available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Bailey DonatoContract Specialist

Full Description

Show more

RFP 36C77626R0002 Project #695-21-700 EHRM Infrastructure Tier 1 Construction Project at the Clement J Zablocki VA Medical Center in Milwaukee, WI

Amendment 0001 issued 4-27-26
Amendment 0002 issued 5-6-26
Amendment 0003 issued 6-10-26
Amendment 0004 issued 7-16-26


Amendment 0005 issued 7-17-26
Amendment 0006 issued 7-22-26


More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
542-22-700 | EHRM Construct Infrastructure Upgrade | Coatesville, PA |
Solicitation # 36C77626Q0138
The Department of Veterans Affairs, Veterans Health Administration, is conducting market research via a Sources Sought Notice for the EHRM Infrastructure Upgrades Construction project at the Coatesville VA Medical Center in Pennsylvania. This project involves site preparation, demolition of existing structures, and the installation of critical telecommunications infrastructure, specifically plenum rated OM4 and OS2-10GB fiber and CAT 6A copper cabling. The scope requires all cables to be terminated, labeled, and documented, with an additional 20 percent capacity provided as specified in the project drawings. The anticipated procurement will be a competitive, firm-fixed-price contract using a design-bid-build approach, with solicitation expected in late December 2026. The magnitude of construction is estimated between 20 million and 50 million dollars, falling under NAICS code 236220. The estimated period of performance is 770 calendar days from the Notice to Proceed. The project is currently designated as a Service-Disabled Veteran-Owned Small Business set-aside. Interested respondents must submit a capabilities statement by October 26, 2026, including company details, a statement of interest, and a letter of intent regarding bonding capacity. Technical qualifications must demonstrate experience with projects of at least 20 million dollars in occupied medical facilities, including work with uninterrupted service lines, infection control, and off-hours execution. Additionally, the government is evaluating the use of Project Labor Agreements in accordance with FAR 22.5, requiring respondents to complete a PLA questionnaire.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 5 days
View Details
NAICS: 541611
New
Federal
Bronx EUL Development Opportunity Sources Sought
Solicitation # 36C77626Q0277
The Department of Veterans Affairs is seeking expressions of interest from qualified developers for an Enhanced-Use Lease opportunity at the James J. Peters VA Medical Center in the Bronx, New York. The project involves the redevelopment of an approximately 1.6-acre parcel to construct, finance, operate, and maintain a parking structure with at least 900 spaces to alleviate significant on-campus parking shortages. Under the terms of the potential lease, which can extend up to 99 years, the developer must provide free parking for Veterans and their families during standard weekday business hours. The government has clarified that due to land and density constraints, mixed-use developments including housing are not anticipated for this specific site. This Sources Sought Notice is intended for market research to determine the best acquisition strategy and is not a formal solicitation for proposals. The VA is particularly interested in the capabilities of Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses, specifically those capable of performing at least 51 percent of the development. Interested respondents must demonstrate a proven track record in real estate development, property management of parking facilities, and the ability to secure non-VA financing. Responses, including company business information, qualification summaries, and answers to a government questionnaire, are due by November 10, 2026.
Administrative Management and General Management Consulting Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
Solicitation 36C77626B0011 is a sealed bid invitation for the Community Living Center (CLC) Phase III Minor Construction project at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and involves the construction of a new 10-bed CLC Cottage (Building 28). The facility will be a single-story building of approximately 7,500 square feet featuring steel framing with a brick veneer. The estimated contract value ranges between 10 million and 20 million dollars, with a target cost limit of 12 million dollars. Award will be granted to the responsible bidder offering the most advantageous price for the base bid, with several deductive alternates available to reduce scope if the base bid exceeds available funding. The scope of work includes all labor, materials, and equipment for general construction and associated site work, including specific requirements for medical gas systems, resinous urethane flooring, and standardized brand-name systems for security cameras (Motorola Avigilon), physical access control (HID), and fire alarms (Siemens Desigo). Contractors must adhere to strict safety and quality protocols, including Pre-Construction Risk Assessments (PCRA) and VHA Infection Control Risk Assessments (ICRA). The project is subject to Davis-Bacon Act wage determinations for Howard County, Texas, and requires performance and payment bonds. Bids must be submitted electronically, and the final deadline for receipt of offers was extended to October 22, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS