Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Veterans Affairs was posted on January 19, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--Hines Finance Center Renovation

Awarded
Federal
Submission Closed
Solicitation #
36C10E21R0009

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new plumbing fixtures and partitions, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and plumbing. The project is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total completion timeframe of 425 calendar days. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Required deliverables include preconstruction submittals such as quality control and safety plans, shop drawings, and product data. The contract is subject to the Davis-Bacon Act and requires the provision of both payment and performance bonds. Proposals must be submitted electronically in PDF format, with the bid schedule provided in Excel via Exhibit A, by the deadline of December 02, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year no dollar limit warranty, and exterior wall systems. Interior improvements involve reconfiguration, new finishes including epoxy mortar flooring, and the installation of overhead coiling doors. The project also requires comprehensive system upgrades, including updated HVAC systems with rooftop air-handling units and water chillers, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Site improvements encompass paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project has an estimated cost between 10 million and 25 million dollars with a completion period of 730 days. Award is based on the lowest price, and bidders must provide pricing for two specific line items: building renovation and paving removal and replacement. The proposal deadline is December 2, 2026. Bonding requirements vary by proposal value, with those over 150 thousand dollars requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act and Buy American requirements. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, managed by NAVFAC Northwest ROICC Kitsap, involves repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work includes addressing a Risk Assessment Code Level 4 (RAC-4) deficiency by extending sprinklers to the loading dock, ensuring elevator pit sprinkler control valves are locked open and monitored by the fire alarm system, and installing missing backflow preventers on the north and south 6-inch wet pipe sprinkler system risers. The contractor is responsible for all final design documentation per FC 1-300-09N, construction materials, labor, supervision, and performance testing. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm Fixed-Price structure and an estimated value between $1 million and $5 million. The period of performance is 440 days from the date of award. Proposals must be submitted via the PIEE portal by December 16, 2026. Award is based on price and MACC past performance, with a bid guarantee required at 20 percent of the bid price or $3 million, whichever is less. The contract mandates strict adherence to safety and environmental standards, including EM 385-1-1 and UFC 4-010-06 cybersecurity standards, and requires compliance with Davis-Bacon wage rates and the Buy American requirement.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 involves a design-build project for the renovation and modernization of Facility 6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between 10 million and 25 million dollars. The scope of work includes a two-phase renovation to expand mission capabilities, featuring the construction of a 400 square foot addition for forklift battery charging, the installation of a prefabricated paint booth with a dry chemical system, and the replacement of a 40-ton bridge crane. A critical requirement is that the facility must remain operational and mission-capable between Phase 1 and Phase 2, which necessitates strict scheduling, multiple mobilization and demobilization cycles, and the completion of all design documents for both phases during the first phase. The project must comply with various standards, including Unified Facilities Criteria (UFC), NFPA 13 and 33, and Puget Sound Clean Air Agency regulations. Award is based on price and MACC past performance, with proposals submitted via the PIEE portal. The contractor is required to provide a bid bond and subsequent performance and payment bonds. Quality control is managed through a three-phase control process, and the contractor must adhere to strict cybersecurity and Controlled Unclassified Information (CUI) standards. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of Building #1963 LBJ Dorm at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks and requires the contractor to perform a visual inspection to determine the necessary replacement. This is a Small Business set-aside opportunity, open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. A mandatory site visit is scheduled for December 3, 2026, at 11 AM, and proposals must be submitted by December 14, 2026. The contract will be awarded based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum bid including a detailed cost breakdown, a timeline for substantial completion, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must provide a one-year workmanship guarantee and a two-year manufacturer's product warranty. All work must adhere to EPA, OSHA, and local Indiana building codes. Required insurance includes automobile liability and workers compensation, with Adams & Associates named as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is a subcontracting opportunity for the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project involves the removal and replacement of damaged fire-rated doors and frames at the center's cafeteria, requiring the installation of new fire-rated doors while reusing existing push bars and closure systems. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). All work must comply with EPA and OSHA regulations, as well as Davis Bacon Act wage rate decisions, and the contractor must hold a valid State of Indiana contractor's license. The award will be based on Best Value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on December 1, 2026, and submit a typed proposal on official company letterhead by December 11, 2026. Proposals must include a single lump sum bid with a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. The contract includes a one-year guarantee of workmanship and manufacturer warranties, with payment terms set at Net 30. Required insurance includes automobile liability and workers compensation, with Adams and Associates, Inc. named as an additional insured.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
International
Taber and District Housing Foundation - Request for Proposal - Clearview Lodge Development at the Meadows
Solicitation # AB-2026-07781
The Taber and District Housing Foundation is seeking an experienced Construction Manager to lead the development of a new senior housing facility in Taber, Alberta, located within the Meadows Development. The project involves the construction of a building of approximately 68,000 square feet on 4.05 acres of serviced land, featuring 88 units including studio suites, bariatric units, and one-bedroom units. The project is currently in the preliminary design stage with a construction budget of $26 million. The contract will be executed using the CCDC 5B – 2025 Construction Management Contract for Services and Construction, and the Owner intends to preserve opportunities for future building expansion on the site. The selected Construction Manager will be responsible for the entire project lifecycle, including pre-construction services, construction execution, and closeout. Key responsibilities include establishing project control systems for budget and risk tracking, providing site supervision, and coordinating all subcontractors and inspections. Mandatory requirements for proponents include proof of Alberta business registration, Commercial General Liability insurance, and a WCB Alberta Certificate of Clearance. Award selection is based on the best overall value, evaluating the proponent's approach, capabilities, and schedule, alongside a price score. Required security measures include a performance bond of at least 50% of the budgeted capital costs and a labor and material payment bond.
Taber and District Housing Foundation

POSTED

about 6 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Veteran's Benefits Administration project involves the renovation of approximately 7,651 square feet within the Hines Finance Center at the Edward Hines Jr. VA Medical Center Campus in Hines, Illinois. The scope includes 7,052 square feet of office space and a 600 square foot shared break room. Key architectural updates involve the demolition of non-load bearing interior walls, replacement of the access flooring system, and the installation of new floor finishes, wall finishes, and casework. The design emphasizes an open-air layout with private offices featuring gypsum board walls and sliding glass doors to maximize natural light, utilizing a blue and gray color palette with Herman Miller furniture configurations. Technical upgrades include a comprehensive overhaul of electrical and mechanical systems. The project requires the replacement of obsolete Westinghouse electrical panels and the installation of energy-efficient LED lighting compatible with Lutron controls. Mechanical work involves relocating existing heat pumps and installing new ductwork and diffusers while reusing the air handling unit and exhaust fans. Technology enhancements include replacing data cabling with Plenum-rated Category 6A and updating security and fire alarm systems. Awarded to Troop Contracting, Inc. on January 21, 2022, for $1,288,241.00, this SDVOSB set-aside project has a period of performance of 180 days after the Notice To Proceed.

General Info

Contract Value

$1,719,551.86

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

DC, USA

Set-Aside

SDVOSBC

Award Issued Date

Potential End Date

November 30, 2022

Documents

1
DOCX, Low priority3 pages · award
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Nov 8, 2021 to Nov 19, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Nov 19, 2021 to Nov 24, 2021.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Vba Field Contracting (36C10E)
Contacts1 person available
OfficeWASHINGTON, DC, 20006, USA

Full Description

Show more
THIS IS A SYNOPSIS ONLY AND NOT A SOLICITATION. THE BELOW STATEMENT OF WORK IS A DRAFT. A SOLICITATION IS PLANNED TO BE RELEASED WITHIN THE NEXT 60 DAYS The Veteran's Benefits Administration is proposing a project that would renovate approximately 7,651 square feet of scope area. This includes 7,052 square feet of existing office space, and 600 square feet of an existing shared break room. The office space is leased by the Hines Finance Center and located in Suite 200X on Level 2 of Building 215 at the Edward Hines Jr. VA Medical Center Campus in Hines, Illinois. The renovation will include demolition of all non-load bearing interior walls within the office space. The existing ceilings, along with all associated ceiling-mounted mechanical and electrical equipment will be reconfigured in entirety. The existing access flooring system is reaching the end of its useful life and is slated to be demolished and replaced with a new access flooring system. Directly adjacent to the office space is Break Room 200Q. The extent of the renovation for this 600 square foot room does not include any alternation to the existing access flooring. New floor finishes, wall finishes, and casework are to be provided as indicated in drawings and specifications. All associated plumbing and accessories to accommodate for an ice maker and a double compartment sink in this space are to be provided. The designs outlined in the provided documents display various elements of renovation design intent that have been coordinated directly with user-groups occupying the Hines Finance Center. The Basis of Design used as reference for furniture and workstation configurations is Herman Miller. All new mechanical and electrical fixtures and equipment will be designed in accordance with Chicago Construction Code, VA Guidelines, and all Building Facility Standard requirements. INTERIOR DESIGN Gypsum board walls are utilized where acoustic privacy is needed between offices while walls between offices and corridor will feature a sliding glass door. This area of glass will allow light from exterior windows to flow into the corridor and open office area of the project. Ceilings in the project will be primarily suspended acoustic ceiling tile with gypsum soffits used strategically throughout for wayfinding and aesthetic accent. Acoustic ceiling tile will be selected with great attention to acoustic properties to control overall office noise and privacy in private offices. Commercial carpet tile will be used throughout the private offices and open office area. Carpet tile will allow for functionality of the access flooring system below while also helping to absorb office noise and general sound from the surrounding environment. Luxury vinyl tile will be incorporated in the break room areas to provide a more cleanable flooring. Tones of blue and gray will be used in this project to create a light, airy, and open feel throughout the space. MECHANICAL The scope of this project is the renovation of the Hines VBA Finance Center located on the second floor of building 215. The work will include redesigned office spaces, meeting and conference rooms, and open-air office space. EXISTING CONDITIONS The AHU provides 3560 CFM of outdoor air to the heat pumps throughout the space. It is located in the equipment room on the second floor. A roof-mounted condensing unit provides refrigerant to the air handling unit for cooling and medium-pressure steam is provided from a mechanical room on the floor below to the steam heating coil within the air handling unit. There is a steam humidifier that is connected to the main supply duct before it leaves the mechanical room. The hydronic system includes loop water that is provided to the heat pumps and with condensate from the heat pumps piped to either floor drains or a mop sink. The loop water is heated by a heat exchanger located in a mechanical room on the floor below. There are fifteen (15) heat pumps located within the area of scope. Each heat pump serves one to two diffusers. The heat pumps are Johnson Controls RG series, with a R-41OA refrigerant internal heat exchanger that is fed via the water loop. The heat pumps have all been replaced within the last two years. The heat pumps are controlled by Alerton Controls, and each has its own thermostat placed in the area they serve. These controls are outdated and are currently being replaced with a new controls system from Johnson Controls. There is one roof-mounted exhaust fan that serves the area. DEMOLITION AND NEW WORK The renovated area is expected to have the same number of employees and equipment as before. The new layout will have several enclosed offices along the exterior with a large and small break room. The interior area will include a conference room, but the majority of the layout will be open-air office space. No additional load is anticipated for the area of scope, allowing the reuse of the AHU and heat pumps. All existing diffusers are to be demolished. Existing ductwork will be demolished back to the main ducts. The majority of the heat pumps are to be disconnected and prepared for possible relocation. The water loop piping is to be demolished back to the main piping when its heat pump is relocated and the condensate drain piping to be removed. The air handling unit, exhaust fans, and other associated equipment are to be reused. New diffusers will be installed, including linear diffusers that will be installed near the windows. New ductwork will tie from the new diffusers to the existing heat pumps. The existing heat pumps will be relocated as necessary throughout the area to better match the new building layout. The relocated heat pumps will be reconnected to the main duct and piping. New exhaust grilles that serve the two exhaust fans will also be provided. ELECTRICAL DESIGN All power and data for the project scope areas are sourced from Electrical Room 200K and Intermediate Distribution Frame Room 200L off Corridor 201. No emergency power distribution exists within the building. Existing branch panels in Electrical Room 200K are all aged and of brands that are no longer in production. Existing 208/120V 30 225A 2-section 78-circuit "2XPA", 480/277V 30 400A 42-circuit "2XDP" and 480/277V 30 100A 24-circuit "2XL" are all obsolete Westinghouse Panels and are recommended to be replaced in place. The panels serve loads over the entire 2nd floor and will cause downtime in out of scope areas. The building uses a VOiP system and has termination switches for phone and data located in Intermediate Distribution Frame Closet 200L. Security Systems include a monitored intrusion detection system, a single camera to the stairwell exit door, and a PACS system. No existing security control stations are located in the area of scope. The security camera feeds back to the building CCTV system for monitoring. The Fire Alarm system is a Simplex 41DOES and is located on the first floor in the Security Office. POWER I Existing Panel I New / Replacement Panel Panel Bus AmpsNoltage Sections/ Poles Bus AmpsNoltage Sections/Poles Comments 2XPA 225A , 208Y/120V 2-section, 78 poles 1225A, 208Y/120V 2-section, 84 poles Panel poles increase from 78 to 84 2XDA 400A, 480Y/277V 1-section, 42 poles 1400A, 480Y/277V 1-section, 42 poles -- 2XL 100A, 480Y/277V 1-section, 24 poles 100A, 480Y/277V 1-section, 42 poles Panel poles increase from 24 to 42 As part of this project, existing panels 2XPA, 2XDP and 2XL will be replaced with new. The table below identifies the existing panels and their replacements. I I Existing electrical loads on the 2nd floor outside project scope area will need to be disconnected and reconnected during this project. Associated downtime during disconnection and reconnection of electrical loads outside the project area will be coordinated to take place over weekends and evenings to minimize disruption. Existing circuits feeding areas outside of the scope area will disconnect and reconnect in place. A 75kVA step-down transformer serving the 2-section panel "2XPA" is in good condition and sized appropriately and will remain. All wall plates for new and existing devices shall be white in color. All conductors will be copper and routed within raceways with a copper ground conductor. Receptacles will be NEMA 5-20R grounding type and white in color. Mechanical heat pump power feeds will require disconnection and reconnection in a new location. LIGHTING All existing light fixtures will be removed and returned to owner's stock. All lighting will be new energy efficient LED direct/indirect troffers, cans, undercabinet, and cove strip light fixtures and compatible with the recently installed Lutron lighting control system. All new lighting control devices provided for all new area layouts will also be compatible with the existing Lutron controls system. Lighting layout plans will be submitted to the local Lutron representative for device layout and commissioning during construction. Dual level dimmable LED fixtures and controls will be provided in the new conference room. LOW VOLTAGE SYSTEMS Security Systems within the new scope include a monitored intrusion detection system, a single camera to the stairwell exit door, and a PACS system. Existing motion detectors on walls and ceiling will be disconnected and preserved for reinstallation in new work. Termination panels for the existing intrusion detection system are located in IDF Closet 200L and appear to have sufficient capacity to serve the renovated project area. Existing fire alarm devices will be removed and reused in work and new devices will be added to adjust to the new layout. All new and existing devices will terminate at the existing Simplex 4100 ES Fire Alarm Control Panel located in the first floor Security Office off the Lobby Area. TECHNOLOGY All existing data cable runs and patch cables terminating in the IDF Closet 200L shall be replaced with new Plenum-rated Category 6A cables. Existing switches and patch panels within the IDF closet are compatible with current and future needs up to 5-10 years. Contractor is responsible for all data drops, cable connections and necessary devices to provide a complete and working system. Contractor will install new Plenum-Rated CAT-6A cabling to each new and existing drop for both phone and data within and routing from IDF Room 200L. All VOiP phone drop will route to the termination switches located in Intermediate Distribution Frame Closet 200L. Existing white noise system speakers will be removed and preserved for the duration of construction and reinstalled in the new work area. All remaining unused cable, devices, raceway, and boxes will be removed by the contractor. PERIOD OF PERFORMANCE The period of performance for this project is 180 days after Notice To Proceed (NTP).

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS