Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1EZ--Correct FCA Deficiencies Construction

Closed
36C77026R0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Department of Veterans Affairs is soliciting a firm-fixed-price construction contract, designated as a Service-Disabled Veteran-Owned Small Business set-aside, to correct deficiencies identified in a 2022 Facility Condition Assessment and a 2021 Physical Security Risk Assessment at the Tucson Consolidated Mail Outpatient Pharmacy (CMOP) in Arizona. The project, estimated between 2 million and 5 million dollars, has a performance period of 365 calendar days. The scope of work includes creating a two-hour fire-rated secure room for the Emergency Electrical System, modifying the system to provide 100 percent backup for the facility, increasing fuel storage capacity to support a 48-hour supply, and providing N+1 redundant electrical systems. Additional requirements include installing HVAC under the mezzanine, and optional tasks involve connecting the fire line to a backflow preventer and replacing the roof with a TPO membrane system. The government will utilize the Lowest Price Technically Acceptable source selection process, evaluating proposals based on price and five non-price factors: relevant construction experience, project execution, staffing qualifications, past performance, and the contractor's safety plan. Contractors must comply with Davis-Bacon prevailing wage rates and provide required performance and payment bonds. Key personnel requirements include the use of qualified journeyman painters and BICSI-certified cabling installers. Proposals must be submitted in three separate PDF volumes covering the technical proposal, price proposal, and bid bond. Final acceptance is contingent upon a five-day VA inspection period at the end of each phase and adherence to NETA acceptance testing specifications for electrical equipment.

General Info

Contract for FCA corrections by contractor in Tucson, Arizona, requiring VA approval at milestones.

Contract Value

$6,170,241

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Tucson, AZ, 85706, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

16

36C77026R0006 Amendment 006

DOCX, High priority: read this first2 pages · amendment
High

762-24-101 Correct FCA & Physical Security Systems Specifications

PDF, High priority: read this firstspecifications
High

762-24-101 FCA Topographic Survey

PDF, High priority: read this firstsow
High

Addendum No. 2 to Geotechnical Evaluation for Southern Arizona VA Medical Center CMOP

PDF, High priority: read this firstaddendum
High

Amendment 000115 to Solicitation 36C77026R0006

DOCX, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 36C77026R0006

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 36C77026R0006

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 36C77026R0006

DOCX, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 36C77026R0006 for Correct FCA Deficiencies Construction Project

DOCX, High priority: read this first11 pages · amendment
High

Attachment 1 - Past Performance for Solicitation 36C77026R0006

DOCX, High priority: read this firstpast-performance
High

Davis-Bacon Wage Determination AZ20260040 for Pima County, AZ

PDF, High priority: read this firstwage-determination
High

Pre-Solicitation Notice 36C77026R0006 Correct FCA Deficiencies Construction

DOCX, High priority: read this firstpresolicitation
High

Solicitation 36C77026R0006 for Construction Contract at CMOP Tucson AZ

DOCX, High priority: read this firstifb
High

762-24-101 FCA Drawings

PDF, Low prioritydrawings
Low

36C77026R0006+0005+SF30+-+Copy.docx

DOCX

36C77026R0006+-+Atch+3+-+AGENDA.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Jun 10, 2026 to Jul 16, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 16, 2026 to Aug 16, 2026. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 16, 2026 to Sep 3, 2026. The notice title changed. Set-aside added: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14).

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cmop Office (36C770)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA
Contacts
Billie Jo Cherico (ContractorContract Specialist

Full Description

Show more

Correct FCA Deficiencies Construction - Solicitation



The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones.  This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning.

More opportunities from Department Of Veterans Affairs → National Cmop Office (36C770)

Same awarding agency

NAICS: 322220
Federal
Tucson CMOP Shipping Box/Coolers
Solicitation # 36C77026Q0047
The Department of Veterans Affairs, through the National CMOP Office, has issued a Sources Sought Notice to conduct market research for the procurement of insulated recyclable small shipping container boxes for the Tucson Consolidated Mail Outpatient Pharmacy. These specialized coolers are used to transport temperature-sensitive Veteran prescriptions and must maintain a Mean Kinetic Temperature at or below 45 degrees Fahrenheit for at least 48 hours. The required containers must be 11.5 x 10 x 6 inches, constructed from Kraft board grade 200B DC with weather-resistant adhesive, and feature a specific tear-away zipper and bold black stenciling that reads Refrigerate Upon Arrival. The anticipated requirement involves a total of 143,242 units, with a demanding delivery schedule of 3,456 units delivered daily, Monday through Friday, to the Tucson facility. Logistics requirements specify that boxes must be shipped with flaps folded and bottoms taped, secured on 40x48 pallets with corner boards and stretch wrap, and not stacked inside one another. Interested vendors must provide their SAM Unique Entity ID, business classification, and a capability statement by November 20, 2025. This notice is strictly for market research purposes to identify capable suppliers and does not constitute a formal solicitation or a commitment to award a contract.
Paper Bag and Coated and Treated Paper Manufacturing

POSTED

about 1 month ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS